Pio Duran: Government

Municipality in Albay, Bicol, Luzon · 33 barangays

National projects

Built by DPWH in Pio Duran since 2016.

118projects
₱3.24Bin all
31ongoing
6slow
  • Roads and bridges ₱2.10B
  • Flood control ₱686.6M
  • Buildings ₱211.0M
  • Schools ₱133.6M
  • Water ₱112.7M

Showing 31 to 60 of 118

Construction of tablon-maonon road, Oas/ligao Roads and bridges · 2022 · SUNWEST, INC.
₱241.0MCompleted · 100%
Construction of flood mitigation structure, Barangay caratagan Flood control · 2022 · HI-TONE CONSTRUCTION & DEVELOPMENT CORP.
₱4.9MOn-Going · 93%
Improvement of road leading to the national hig Roads and bridges · 2022 · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.
₱59.4MCompleted · 100%
Concreting of rawis to estrella fmr, Brgy. rawis, Pioduran Roads and bridges · 2022 · RAGINMUND CONSTRUCTION
₱11.6MCompleted · 100%
Construction of marcial o. rañola-ongo road, G Roads and bridges · 2022 · SUNWEST, INC.
₱240.1MOn-Going · 97%
Widening-secondary road, Ligao-pioduran road, Ko538+120-ko538+300 Roads and bridges · 2022 · POWER CITI DESIGN & CONSTRUCTION
₱9.8MCompleted · 100%
Construction of multi-purpose building (covered court), Agol es, Pioduran Buildings · 2021 · J-NAC CONSTRUCTION & SUPPLY
₱2.9MCompleted · 100%
Rehabilitation of road, Barangay banawan, Pioduran Roads and bridges · 2022 · POWER CITI DESIGN & CONSTRUCTION
₱5.0MCompleted · 100%
₱4.8MOn-Going · 97%
Construction of road, Brgy. marigondon, Pioduran Roads and bridges · 2022 · POWER CITI DESIGN & CONSTRUCTION
₱4.4MOn-Going · 0%Slow
Construction of multi-purpose building, Barangay macasitas, Pioduran Buildings · 2022 · SULVIR ENGINEERING AND CONSTRUCTION
₱4.9MOn-Going · 100%
Construction of multi-purpose building, Barangay sukip, Pioduran Buildings · 2022 · C.P. AGRAVANTE BUILDERS AND SUPPLY
₱5.0MCompleted · 100%
Rehabilitation of road, Barangay nablangbulod, Pioduran Roads and bridges · 2022 · REO BUILDERS
₱4.9MCompleted · 100%
Rehabilitation of malidong river wall, Pioduran Flood control · 2022 · ELKANKONSTRAK DEVELOPMENT CORPORATION
₱19.6MCompleted · 100%
₱4.8MCompleted · 100%
₱993KCompleted · 100%
₱10.2MCompleted · 100%
Construction of road, From barangay mamlad to barangay lawinon Roads and bridges · 2021 · CAMSUR BICOL TRADING INC.
₱19.6MCompleted · 100%
Construction of road, From barangay agol to barangay basicao Roads and bridges · 2021 · 4DOVE BUILDERS CORPORATION
₱19.6MCompleted · 100%
₱2.9MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Pio Duran since 2016.

1
CAMSUR BICOL TRADING INC.11 projects · ₱73.7M
2
MAKAPA CORPORATION9 projects · ₱465.3M
3
4DOVE BUILDERS CORPORATION8 projects · ₱75.9M
4
ELKANKONSTRAK DEVELOPMENT CORPORATION6 projects · ₱204.0M
5
HI-TONE CONSTRUCTION & DEVELOPMENT CORP.5 projects · ₱81.6M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →