PD
Pio Duran: Government
Municipality in Albay, Bicol, Luzon · 33 barangays
National projects
118projects
₱3.24Bin all
31ongoing
6slow
- Roads and bridges ₱2.10B
- Flood control ₱686.6M
- Buildings ₱211.0M
- Schools ₱133.6M
- Water ₱112.7M
Construction of solar water system level ii, Brgy. basicao coastal, Basicao coastal, Albay (3rd legi
Water · 2023 · EARTHLINE CONSTRUCTION
₱4.9MOn-Going · 2%Slow
Construction of multi-purpose training and instructional facility/meetings incentives confere
Buildings · 2023 · NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION / ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
₱144.7MOn-Going · 26%Slow
Construction of road, Brgy. marigondon, Pioduran
Roads and bridges · 2022 · POWER CITI DESIGN & CONSTRUCTION
₱4.4MOn-Going · 0%Slow
Rehabilitation of pangarian river flood mitigation structure with access road, Barangay la medalla
Flood control · 2021 · RICHMAR CONSTRUCTION
₱38.2MOn-Going · 57%Slow
Repair/rehabilitation of day care center, Child development center in pioduran
Buildings · 2016 · 4DOVE BUILDERS CORPORATION
₱463KOn-Going · 0%Slow
Repair of various local roads/other infrastructures at pio duran, Albay 3rd ld
Flood control · 2016 · ANTONIO V. NIDEA CONST., INC.
₱56.3MOn-Going · 0%Slow
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
CAMSUR BICOL TRADING INC.11 projects · ₱73.7M
2
MAKAPA CORPORATION9 projects · ₱465.3M
3
4DOVE BUILDERS CORPORATION8 projects · ₱75.9M
4
ELKANKONSTRAK DEVELOPMENT CORPORATION6 projects · ₱204.0M
5
HI-TONE CONSTRUCTION & DEVELOPMENT CORP.5 projects · ₱81.6M