SE
Santa Elena: Government
Municipality in Camarines Norte, Bicol, Luzon · 19 barangays
National projects
147projects
₱4.16Bin all
26ongoing
2slow
- Roads and bridges ₱2.77B
- Flood control ₱801.7M
- Other ₱193.0M
- Water ₱166.7M
- Schools ₱122.2M
- Buildings ₱113.4M
Showing 1 to 30 of 111
Construction/improvement of access roads leading to trades, Industries and economic zones (roads leveraging linkages for industry and trade infrastructure program - rool it), Guisican brgy. road connecting maharlika highway in support of guisican mpc sank
Roads and bridges · 2025 · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
₱4.8MCompleted · 100%
Construction of road, Barangay patag-ilaya, Camarines norte (phase 1), Barangay patag-ilaya
Roads and bridges · 2024 · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.
₱99.0MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems-construction of flood mitigation structure along minasag river, Barangay san
Flood control · 2024 · HGG BUILDERS & SUPPLY
₱154.4MCompleted · 100%
Construction of road, Barangay patag-ilaya
Roads and bridges · 2024 · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
₱14.8MCompleted · 100%
Preventive maintenance-primary roads-daang maharlika (lz)-k0249+000-k0249+770, Camarines norte (1st legislative district)
Roads and bridges · 2024 · NFH CONSTRUCTION & SUPPLY
₱38.6MCompleted · 100%
Construction of multi-purpose building, Barangay pulongguit-guit
Buildings · 2024 · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
₱4.8MCompleted · 100%
Construction of multi-purpose building (covered court), Patag ilaya elementary school, Barangay patag ilaya
Schools · 2024 · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
₱4.8MCompleted · 100%
Construction of multi-purpose building, Sta. elena integrated school, Barangay poblacion
Schools · 2023 · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
₱9.6MCompleted · 100%
Construction of multi-purpose building (covered court), Barangay maulawin
Buildings · 2023 · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
₱4.8MCompleted · 100%
Construction of multi-purpose building (health center), Barangay kabuluan
Buildings · 2023 · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
₱4.7MCompleted · 100%
Construction of solar water system, Brgy. san vicente
Water · 2023 · LIM GENERAL CONTRACTOR CORPORATION
₱9.8MCompleted · 100%
Widening - primary roads - daang maharlika (lz) - k0261+515 - k0262+183
Flood control · 2023 · E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST
₱48.7MCompleted · 100%
Widening of permanent bridges - bulala br. 2 (b02697lz) along daang maharlika (lz), Brgy. bulala
Roads and bridges · 2023 · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
₱19.6MCompleted · 100%
Construction of barangay road, Brgy. maulawin (phase iii)
Roads and bridges · 2023 · EUS CONSTRUCTION
₱87.8MCompleted · 100%
Construction of flood mitigation structure, Barangay salvacion
Flood control · 2023 · GREAT WALL ENGINEERING
₱9.8MCompleted · 100%
Construction of slope protection work, Barangay san lorenzo
Flood control · 2023 · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
₱9.9MCompleted · 100%
Construction / rehabilitation of flood protection measures at brgy. kabuluan
Flood control · 2023 · EUS CONSTRUCTION
₱17.5MCompleted · 100%
Construction of flood control structure, Brgy. rizal - brgy. san lorenzo (phase iii)
Flood control · 2023 · EUS CONSTRUCTION
₱95.6MCompleted · 100%
Construction of flood mitigation structures, Barangay san lorenzo
Flood control · 2023 · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
₱19.6MCompleted · 100%
Construction of flood mitigation structure, Barangay pulongguit-guit
Flood control · 2023 · GREAT WALL ENGINEERING
₱8.2MCompleted · 100%
Construction / rehabilitation of flood protection measures at barangay basiad
Flood control · 2023 · EUS CONSTRUCTION
₱17.6MCompleted · 100%
Construction of multi-purpose building, Bulala h/s, Barangay bulala
Buildings · 2023 · GREAT WALL ENGINEERING
₱4.7MCompleted · 100%
Construction of flood mitigation structure, Barangay patag ibaba
Flood control · 2023 · GREAT WALL ENGINEERING
₱4.9MCompleted · 100%
Construction / rehabilitation of flood protection measures at barangay san lorenzo
Flood control · 2023 · GREAT WALL ENGINEERING
₱14.2MCompleted · 100%
Rehabilitation / major repair of permanent bridges, Minasag br. (b02696lz) along daang maharlika, Brgy. rizal
Roads and bridges · 2023 · JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY
₱5.7MCompleted · 100%
Construction of multi-purpose building, Barangay plaridel
Buildings · 2023 · GREAT WALL ENGINEERING
₱4.9MCompleted · 100%
Rehabilitation / reconstruction of roads with slips, Slope collapse, And landslide - primary roads, Daang maharlika (lz) - k0248+360 - k0248+395, K0249+116 - k0249+149, K0249+495 - k0249+827, K0265+690 - k0265+763, K0266+660 - k0266+715, K0266+723 - k0266
Roads and bridges · 2023 · E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST
₱59.3MCompleted · 100%
Construction/rehabilitation of water supply/septage and sewerage/rainwater collector system - bagacay elementary school, Tacloban city national high school, Cabalawan elementary school, New kawayan day care center, New kawayan brgy. hall
Schools · 2021 · RPBJ TRADING AND CONSTRUCTION
₱4.4MCompleted · 100%
Rehabilitation / reconstruction of roads with slips, Slope collapse and landslide - primary roads, Quirino h-way - k0250+060 - k0250+137
Roads and bridges · 2022 · EUS CONSTRUCTION
₱12.0MCompleted · 100%
Construction of multi-purpose building, Barangay poblacion
Buildings · 2022 · BRENTMIN ROOFING ENTERPRISE
₱4.8MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY18 projects · ₱177.0M
2
N.E.B. CONSTRUCTION AND SUPPLY15 projects · ₱203.6M
3
BRENTMIN ROOFING ENTERPRISE12 projects · ₱226.8M
4
RUR CONSTRUCTION AND SUPPLY11 projects · ₱43.6M
5
GREAT WALL ENGINEERING9 projects · ₱98.3M