Baao: Government

Municipality in Camarines Sur, Bicol, Luzon · 30 barangays

Town hall contracts

Construction contracts the town hall of Baao awarded and posted on PhilGEPS.

54projects
₱139.2Min all
  • Roads and bridges ₱51.4M
  • Other ₱29.0M
  • Buildings ₱26.7M
  • Flood control ₱26.4M
  • Water ₱3.0M
  • Schools ₱2.7M

The last construction award Baao posted on PhilGEPS is from November 2021. A town has to post every award, so the list below is likely not all of its work. The town's own reports are in "Town hall papers".

All

Showing 1 to 30 of 54

Additional topsoil at bagumbayan open dumpsite and storm drainage system Flood control · 2021 · MCJ SUMMIT ENTERPRISE
₱1.5M
Upgrading of concrete pavement with drainage at poblacion area (san roque and san francisco) phase ii Flood control · 2021 · CHA CONSTRUCTION AND SUPPLY
₱5.5M
Installation of 40-units streetlights along maharlika hiway (la medalla & buluang) Roads and bridges · 2020 · MCJ SUMMIT ENTERPRISE
₱2.5M
Concrete pavement with drainage – poblacion area (barlin st., Don juan st., San roque) Flood control · 2020 · MCJ SUMMIT ENTERPRISE
₱2.5M
Construction of multi-purpose hall phase 1 – sta. teresita Buildings · 2020 · MCJ SUMMIT ENTERPRISE
₱3.5M
Construction of alsum-lourdes road phase ii Roads and bridges · 2020 · EA-EC CONSTRUCTION AND SUPPLY
₱999K
Road opening of cristo rey – sta. isabel road connecting agdangan road Roads and bridges · 2020 · EA-EC CONSTRUCTION AND SUPPLY
₱3.5M
Construction of sta. teresita road Roads and bridges · 2020 · CHA CONSTRUCTION AND SUPPLY
₱994K
Construction of sta. isabel road Roads and bridges · 2020 · MCJ SUMMIT ENTERPRISE
₱1.5M
Construction of san vicente-antipolo old road Roads and bridges · 2020 · EA-EC CONSTRUCTION AND SUPPLY
₱1.5M
Thw stranded wire 4, Pvc pipe 1, Etc.... Other · 2019 · MCJ SUMMIT ENTERPRISE
₱4.1M
Procurement of one (1) pc 2 gate valve and other supplies and materials for maintenance supplies for third quarter - pr 2019-11-108 Other · 2019 · MCJ SUMMIT ENTERPRISE
₱5.0M
Purchase of materials for the fabrication of vault molders at the springfields memorial park Other · 2019 · CHA CONSTRUCTION AND SUPPLY
₱1.8M
Procurement of bdrrm supply/equipment Other · 2019 · EA-EC CONSTRUCTION AND SUPPLY
₱4.0M
Supply and delivery of meals & snacks (breastfeeding symposium under early childhood care and development in the first 100 days program) Other · 2019 · MCJ SUMMIT ENTERPRISE
₱11.5M
Improvement of alsum lourdes road Roads and bridges · 2019 · WIND RIVER COURT CONSTRUCTION AND DEVELOPMENT
₱994K
Construction of box culvert at inukaran and riverwall Flood control · 2019 · WIND RIVER COURT CONSTRUCTION AND DEVELOPMENT
₱2.0M
Improvement of alsum lourdes road Roads and bridges · 2019 · WIND RIVER COURT CONSTRUCTION AND DEVELOPMENT
₱994K
Construction of diversion road Roads and bridges · 2019 · MCJ SUMMIT ENTERPRISE
₱995K
Improvement of rural & urban drainage facilities (riprapping at babaywan & san jose creek) Flood control · 2019 · MCJ SUMMIT ENTERPRISE
₱1.5M
Concreting of sitio balaigang antipolo-caranday-lourdes road Roads and bridges · 2019 · MCJ SUMMIT ENTERPRISE
₱2.0M
Construction of multi-purpose hall – san isidro Buildings · 2019 · MCJ SUMMIT ENTERPRISE
₱2.6M
Desilting of creeks Flood control · 2019 · MCJ SUMMIT ENTERPRISE
₱996K
Improvement of sta. isabel access road Roads and bridges · 2019 · MCJ SUMMIT ENTERPRISE
₱997K
Concreting of san roque poblacion road Roads and bridges · 2019 · MCJ SUMMIT ENTERPRISE
₱994K
Construction of multi-purpose hall, Phase 1 – san vicente Buildings · 2019 · MCJ SUMMIT ENTERPRISE
₱1.0M
Construction of multi-purpose hall, Phase 1 – san juan Buildings · 2019 · MCJ SUMMIT ENTERPRISE
₱1.0M
Rehabilitation of waste disposal facility Buildings · 2019 · DELPAR CONSTRUCTION & SUPPLIES
₱2.7M
Construction of multi-purpose hall (buluang) Buildings · 2019 · ROLOSA CONSTRUCTION & SUPPLIES
₱3.2M
Local access road opening - san vicente Roads and bridges · 2018 · EA-EC CONSTRUCTION AND SUPPLY
₱8.0M

Source: PhilGEPS award notices, from the BetterGov.ph open data (CC0).

Town hall papers

Not every project is on PhilGEPS. These are the town's own reports.

1
Budget and 20% development fundDILG Full Disclosure Policy portal
2
Audit reportsCommission on Audit

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board.

Post on Talk →