Lagonoy: Government
Municipality in Camarines Sur, Bicol, Luzon · 38 barangays
National projects
143projects
₱4.89Bin all
16ongoing
1slow
- Roads and bridges ₱2.87B
- Flood control ₱1.73B
- Buildings ₱175.4M
- Schools ₱72.4M
- Water ₱41.4M
Showing 1 to 30 of 143
Construction (completion) of multi-purpose building (covered court), Barangay dahat
Buildings · 2026 · S & RV CONSTRUCTION & SUPPLY
₱3.8MOn-Going · 13%
Construction of road, Barangay pinamihagan to barangay gubat, Camarines sur. sta.1+400 - sta.2+100
Roads and bridges · 2026 · IA FERRER CONSTRUCTION & SUPPLY
₱11.1MOn-Going · 52%
Construction of missing links/new road, Managnag (tigaon-goa-san jose-lagonoy-guijalo via san vicente rd), Himanag road. sta.12+300 - sta.13+484, Barangay sipaco
Roads and bridges · 2026 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱68.2MOn-Going · 15%
Construction of multi-purpose building
Buildings · 2025 · ZKR CONSTRUCTION & SUPPLY
₱47.5MOn-Going · 90%
Construction of multi-purpose building (covered court)
Buildings · 2025 · S & RV CONSTRUCTION & SUPPLY
₱23.8MOn-Going · 100%
Construction of flood mitigation structure (drainage system) barangay san rafael to san isidro sur highway)
Flood control · 2025 · SOLERA CONSTRUCTION AND SUPPLY
₱4.7MOn-Going · 100%
Construction of road with drainage along tigaon-goa-san jose-lagonoy-guijalo via san vicente road, Barangay san rafael sectionlagonoy
Flood control · 2025 · KCS CONSTRUCTION & SUPPLY
₱9.4MOn-Going · 100%
Construction of missing links/new roads, Managnag (tigaon-goa-sn jose-lagonoy-guijalo via san vicente road) himanag road
Roads and bridges · 2025 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱65.4MOn-Going · 100%
Construction of missing links/new roads, Lalud-garchitorena road (del carmen section)
Roads and bridges · 2025 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱65.4MOn-Going · 100%
Construction of drainage canal at cris
Flood control · 2025 · HRB CONSTRUCTION
₱9.6MOn-Going · 100%
Construction of drainage canal at cris, Barangay loho
Flood control · 2025 · HRB CONSTRUCTION
₱14.4MOn-Going · 100%
Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers-construction of flood mitigation structure, Lago
Flood control · 2025 · ALRO CONSTRUCTION & DEVELOPMENT CORP.
₱154.3MOn-Going · 68%
Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers-construction of flood mitigation structure, Lago
Flood control · 2025 · ALRO CONSTRUCTION & DEVELOPMENT CORP.
₱154.3MOn-Going · 57%
Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers-construction of flood mitigation structure, Lago
Flood control · 2025 · ALRO CONSTRUCTION & DEVELOPMENT CORP.
₱159.0MOn-Going · 64%
Construction of bridge, Zone 4, Barangay amoguis to barangay taytay
Roads and bridges · 2025 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱4.8MCompleted · 100%
Construction of flood mitigation structure along kulasi river (upstream - dahat section) package 1
Flood control · 2024 · FS CO BUILDERS AND SUPPLY / HI-TONE CONSTRUCTION & DEVELOPMENT CORP.
₱144.8MOn-Going · 92%
Construction of multi-purpose building
Buildings · 2024 · SOLERA CONSTRUCTION AND SUPPLY
₱12.4MCompleted · 100%
Construction of flood mitigation structure along lagonoy river (downstream-genorangan section) package 4
Flood control · 2024 · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / FS CO BUILDERS AND SUPPLY
₱144.8MCompleted · 100%
Construction of flood mitigation structure along lagonoy river (downstream-genorangan section) package 3
Flood control · 2024 · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. / FS CO BUILDERS AND SUPPLY
₱144.8MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems-construction of flood mitigation structure along genorangan river, C
Flood control · 2024 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱87.3MCompleted · 100%
Preventive maintenance (asphalt overlay) along lagonoy-presentacion road, Section 1: k0499+077.00 - k0499+540.00; section 2: k0499+700.00 - k0500+400.00
Roads and bridges · 2024 · NFH CONSTRUCTION & SUPPLY
₱20.0MCompleted · 100%
Construction of missing links/new roads, Lalud-garchitorena road, Camarines sur (bridge 1)
Roads and bridges · 2024 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱88.9MCompleted · 100%
Construction of missing links/new roads, Managnag (tigaon-goa-san jose-lagonoy-guijalo via san vicente road) himanag road
Roads and bridges · 2024 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱53.1MCompleted · 100%
Rehabilitation/major repair of permanent bridges, Panagan bridge (b01355lz) along lagonoy-presentacion road, Barangay panagan
Roads and bridges · 2024 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱4.8MCompleted · 100%
Construction/upgrading/rehabilitation of drainage along national roads along lagonoy-presentacion road k0499+540 - k0499+700
Roads and bridges · 2024 · MAGDA CONSTRUCTION AND SUPPLY INC.
₱9.4MCompleted · 100%
Rehabilitation/major repair of bridge, Kinahulugan bridge (b04164lz) along lagonoy-presentacion road k0507+313 - k0507+337.60, Kinahulugan
Roads and bridges · 2024 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱4.8MCompleted · 100%
Construction of multi-purpose building (covered court) presentacion
Buildings · 2024 · HRB CONSTRUCTION
₱5.9MCompleted · 100%
Construction/rehabilitation of water supply/septage and sewerage/rain water collectors-water supply system-construction of solar water system level ii, Binanuahan, Sta. maria, Pinamiga
Water · 2023 · AC8 BUILDERS
₱28.0MOn-Going · 58%Slow
Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers-construction of flood mitigation structure along lagonoy river (downst
Flood control · 2023 · C.T. LEONCIO CONSTRUCTION & TRADING
₱67.5MCompleted · 100%
Construction of solar water system, Brgy. san sebastian
Water · 2023 · J.C NIETO CONSTRUCTION
₱9.8MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
HRB CONSTRUCTION24 projects · ₱74.7M
2
E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)21 projects · ₱1.05B
3
PARTIDO CONSTRUCTION & SUPPLY13 projects · ₱692.6M
4
S & RV CONSTRUCTION & SUPPLY11 projects · ₱71.3M
5
G.C.I. CONSTRUCTION AND DEV'T. CORP.8 projects · ₱581.8M