Municipality in Camarines Sur, Bicol, Luzon · 25 barangays

National projects

Built by DPWH in Minalabac since 2016.

140projects
₱8.56Bin all
14ongoing
2slow
  • Roads and bridges ₱5.16B
  • Flood control ₱3.06B
  • Buildings ₱205.1M
  • Schools ₱123.3M
  • Water ₱9.9M
₱84.1MOn-Going · 0%
Construction of by-pass and diversion roads - camarines sur expressway package 17, Camarines sur (2nd legislative district) Roads and bridges · 2025 · G.C.I. CONSTRUCTION AND DEV'T. CORP. / MPIRE NINE CONSTRUCTION OPC
₱190.1MOn-Going · 11%
₱190.1MOn-Going · 38%
Construction of by-pass and diversion roads - milaor-pili bypass road, Alimbuyog bridge Roads and bridges · 2025 · G.C.I. CONSTRUCTION AND DEV'T. CORP.
₱94.6MOn-Going · 99%
Construction of by-pass and diversion roads - milaor-pili bypass road, Cabugao bridge (phase 2) Roads and bridges · 2024 · G.C.I. CONSTRUCTION AND DEV'T. CORP.
₱92.6MOn-Going · 99%
Improvement - tertiary roads - milaor-minalabac-pili rd - k0436 + 545 - k0437 + 295 Roads and bridges · 2024 · BICOL GOLDROCK CONSTRUCTION CORPORATION
₱39.2MOn-Going · 100%
₱193.0MOn-Going · 100%
Construction of multi-purpose building (super health center) Buildings · 2023 · SCHEIRMAN CONSTRUCTION CONSOLIDATED INC.
₱24.5MOn-Going · 0%Slow
₱186.2MOn-Going · 55%Slow
₱165.7MOn-Going · 79%
₱193.0MOn-Going · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Minalabac since 2016.

1
G.C.I. CONSTRUCTION AND DEV'T. CORP.32 projects · ₱3.69B
2
BICOL GOLDROCK CONSTRUCTION CORPORATION21 projects · ₱1.11B
3
EDROX CONSTRUCTION, INC.10 projects · ₱74.8M
4
YUERS CONSTRUCTION AND SUPPLY8 projects · ₱81.9M
5
NEWBIG FOUR J CONSTRUCTION INC.6 projects · ₱579.6M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →