Sagñay: Government
Municipality in Camarines Sur, Bicol, Luzon · 19 barangays
National projects
112projects
₱3.46Bin all
19ongoing
1slow
- Roads and bridges ₱1.75B
- Flood control ₱1.19B
- Schools ₱201.9M
- Buildings ₱182.1M
- Water ₱135.5M
Showing 31 to 60 of 90
Construction of multi-purpose buildingbongalon/san antonio, Sagnay/tinambac
Buildings · 2021 · LIMCORE CONSTRUCTION AND SUPPLY
₱1.9MCompleted · 100%
Construction of nato road, Section 1: sta.0+000.00 - sta.0+092.00section 2: sta.0+000.00 - sta.0+058.00section 3: sta.0+000.00 - sta.0+045.00section 4: sta.0+000.00 - sta.0+064.00sagnay
Roads and bridges · 2021 · LIMCORE CONSTRUCTION AND SUPPLY
₱1.9MCompleted · 100%
Construction of multi-purpose building, Barangay tinorongan
Buildings · 2021 · LIMCORE CONSTRUCTION AND SUPPLY
₱3.8MCompleted · 100%
Rehabilitation of multi-purpose building, Barangay catalotoan
Buildings · 2021 · LIMCORE CONSTRUCTION AND SUPPLY
₱1.4MCompleted · 100%
Construction of flood control mitigation structure along sagnay riversection 1: sta.0+460.00 - sta.06+580.00section 2: sta.0+583.00 - sta.0+841.00sagnay
Flood control · 2021 · ALRO CONSTRUCTION & DEVELOPMENT CORP.
₱46.5MCompleted · 100%
Rehabilitation/major repair of bridge, Igot bridge (b02389lz) along pili-albay boundary road, K0503+096.00 - k0503+110.00, Patitinan
Roads and bridges · 2021 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱8.9MCompleted · 100%
Preventive maintenance (asphalt overaly) along pili-tigaon-albay boundary road, K0504+000.00 - k0504+691.00patitinan
Roads and bridges · 2021 · NFH CONSTRUCTION & SUPPLY
₱9.3MCompleted · 100%
Rehabilitation/reconstruction of roads with slips, Slope collapse and landslide along pili-tigaon-albay boundary roadk0502+700 - k0502+755k0503+890 - k0504+095sagnay
Roads and bridges · 2021 · ALRO CONSTRUCTION & DEVELOPMENT CORP.
₱72.4MCompleted · 100%
Rehabilitation/major repair of bridge, Odiongan bridge (b02385lz) along pili-tigaon-albay boundary road, K0489+373.00 - k0489+387.00barangay turague
Roads and bridges · 2021 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱7.4MCompleted · 100%
Rehabilitation/reconstruction of national roads with slips, Slope collapse, And landslide-secondary roads, Pili-tigaon-albay bdry. rd.-k0497+680.44-k0497+744.50 & k0506+080.00-k0506+190
Roads and bridges · 2020 · HI-TONE CONSTRUCTION & DEVELOPMENT CORP.
₱116.0MCompleted · 100%
Rehabilitation/reconstruction of national roads with slips, Slope collapse and landslide-secondary roads, Pili-tigaon-albay bdry. rd.-k0497+580.00-k0497+680.44, Camarines sur 4th
Roads and bridges · 2020 · HI-TONE CONSTRUCTION & DEVELOPMENT CORP.
₱120.4MCompleted · 100%
Construction of flood control structures along patitinan river (igot river) sagnay camarines sur
Flood control · 2020 · PARTIDO CONSTRUCTION & SUPPLY
₱46.6MCompleted · 100%
Rehabilitation/reconstruction of roads with slips, Slope collapse and landslide along pili-tigaon-albay boundary roadk0488+705 - k0488+810k0488+853 - k0489+126k0497+660 - k0497+740sagñay
Roads and bridges · 2020 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱46.5MCompleted · 100%
Preventive maitenance (asphalt overlay) along pili-tigaon-albay boundary road k0501+873.00 - k0502+273.00patitinan section
Roads and bridges · 2020 · BESTECH CONSTRUCTION & DEVELOPMENT CORPORATION
₱5.1MCompleted · 100%
Construction of three barrel concrete bridge along kilamaon - anlog road section sta. 0+000 - sta. 0+062.40
Roads and bridges · 2020 · LIMCORE CONSTRUCTION AND SUPPLY
₱4.7MCompleted · 100%
Construction of multi-purpose buildingsbrgy. san roque and brgy. catalotoan
Buildings · 2020 · LIMCORE CONSTRUCTION AND SUPPLY
₱1.9MCompleted · 100%
Construction of flood control structures, I-brgy. tawog (pobl) caramoan sta.0+000.00 - sta.0+009.00ii-brgy. san antonio, Sagñay sta.0+000.00 - sta.0+021.00brgy. tawog (pobl.), Caramoan and brgy. san antonio, Cam. sur
Flood control · 2020 · LIMCORE CONSTRUCTION AND SUPPLY
₱1.9MCompleted · 100%
Construction of multi-purpose buildings barangay san ramon and barangay mabca
Buildings · 2020 · SOLERA CONSTRUCTION AND SUPPLY
₱2.3MCompleted · 100%
Off-carriageway along pili-tigaon-albay boundary road k0486+026 - k0488+853 sagnay
Roads and bridges · 2020 · LIMCORE CONSTRUCTION AND SUPPLY
₱21.8MCompleted · 100%
Construction of aniog-kilomaon-minadonjol bridge, Brgy. aniog
Roads and bridges · 2019 · HI-TONE CONSTRUCTION & DEVELOPMENT CORP.
₱10.0MCompleted · 100%
Deped cy-2019 basic educational facilities fund (beff) batch 1const. of two (2) storey four (4) classroom school building(with common toilet attached each floor)odiongan elem. school
Schools · 2019 · SPRING STAR CONSTRUCTION AND SUPPLY
₱11.0MCompleted · 100%
Construction of local roadsta.0+000.00 - sta.0+650.00minadongjol (minadongjol-bolo section)
Roads and bridges · 2019 · LIMCORE CONSTRUCTION AND SUPPLY
₱6.1MCompleted · 100%
Construction of multi-purpose buildingpoblacion
Buildings · 2019 · LIMCORE CONSTRUCTION AND SUPPLY
₱1.9MCompleted · 100%
Rehabilitation of multi-purpose buildingsbrgy. iii and brgy. nato, Garchitorena and sagñay
Buildings · 2019 · HRB CONSTRUCTION
₱1.9MCompleted · 100%
Preventive maintenance (asphalt overlay)along pili-tigaon-albay boundary road, K0491+296.00 - k0497+791.00sibaguan-bongalon-patitinan section
Roads and bridges · 2019 · NFH CONSTRUCTION & SUPPLY
₱80.1MCompleted · 100%
Rehabilitation/reconstruction of roads with slips, Slope, Collapse and landslide along pili-tigaon-albay boundary road k0490+822 - k0490+945 to k0506+735 - k0506+830 sibaguan - patitinan section
Roads and bridges · 2019 · ALRO CONSTRUCTION & DEVELOPMENT CORP.
₱60.5MCompleted · 100%
Construction/improvement/repair of flood control structure along sibaguan river (p003228lz)sta.0+223.00 - sta.0+573.00sagñay
Flood control · 2019 · LAHDETH CONSTRUCTION AND SUPPLY
₱18.6MCompleted · 100%
Cy-2019 network devt - off-cariageway imprvt along pili-tigaon-albay boundary roadsection 1 : k0484+713.00-k0484+996.00 =283.00 lm.tosection 3 : k0485+560.00-k0486+026.00 = 369.00 lm del carmen - turague section
Roads and bridges · 2019 · E.S. BIHAG CONSTRUCTION & SUPPLY / SOUTHERN ROCK CONSTRUCTION AND SUPPLY
₱18.6MCompleted · 100%
Construction of bypass/diversion road, Construction of jct. nato-sabang coastal road, Sta.1+731.60 - sta.1+970.00sta.2+150.00 - sta.2+661.50casuna - tagas section, Tigaon and san jose
Roads and bridges · 2019 · ALRO CONSTRUCTION & DEVELOPMENT CORP.
₱91.7MCompleted · 100%
Construction of multi-purpose buildingbarangay patitinan
Buildings · 2019 · HRB CONSTRUCTION
₱1.9MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
LIMCORE CONSTRUCTION AND SUPPLY23 projects · ₱160.7M
2
ALRO CONSTRUCTION & DEVELOPMENT CORP.18 projects · ₱1.24B
3
PARTIDO CONSTRUCTION & SUPPLY7 projects · ₱239.8M
4
SOLERA CONSTRUCTION AND SUPPLY6 projects · ₱50.6M
5
NFH CONSTRUCTION & SUPPLY5 projects · ₱190.9M