National projects
112projects
₱3.46Bin all
19ongoing
1slow
- Roads and bridges ₱1.75B
- Flood control ₱1.19B
- Schools ₱201.9M
- Buildings ₱182.1M
- Water ₱135.5M
Showing 31 to 60 of 112
Construction of flood mitigation structure along sagñay river, Barangay del carmen
Flood control · 2023 · ALRO CONSTRUCTION & DEVELOPMENT CORP.
₱66.9MCompleted · 100%
Construction of multi-purpose building (sports complex) barangay nato
Buildings · 2023 · LIMCORE CONSTRUCTION AND SUPPLY
₱6.9MCompleted · 100%
Construction of flood mitigation structure along sagnay riversagnay
Flood control · 2023 · PARTIDO CONSTRUCTION & SUPPLY
₱93.1MCompleted · 100%
Construction (completion) of level iii water supply system, Sibaguan
Water · 2023 · IA FERRER CONSTRUCTION & SUPPLY
₱4.5MCompleted · 100%
Construction/rehabilitation of water supply/septage and sewerage/rainwater collector system-water supply system-construction of water system (level ii) project, P00642363lz, Regionwide
Water · 2022 · R.D. POLICARPIO & COMPANY INC. / SUNWEST, INC.
₱96.5MCompleted · 100%
Construction of flood mitigation structure along sagnay river, Sta.0+841.00 - sta.1+055.00contract locations : sagnay
Flood control · 2022 · IA FERRER CONSTRUCTION & SUPPLY
₱29.4MCompleted · 100%
Construction of multi-purpose building, Barangay mabca
Buildings · 2022 · LIMCORE CONSTRUCTION AND SUPPLY
₱9.8MCompleted · 100%
Construction of flood mitigation structure along mapanag river upstream : sta. 0+000 - sta. 0+285.00 (r/s) and sta. 0+000.00 - sta. 0+125.00 (l/s) downstream : sta. 0+000.00 - sta. 0+035.00 (both side) sagnay
Flood control · 2022 · STEVEN CONSTRUCTION & SUPPLY
₱29.4MCompleted · 100%
Preventive maintenance (asphalt overlay) along pili - tigaon - albay boundary road, Section 1: k0499+159.00 - k0500+000.00section 2: k0501+000.00 - k0501+682.00sagnay
Roads and bridges · 2022 · NFH CONSTRUCTION & SUPPLY
₱19.6MCompleted · 100%
Construction of multi-purpose building
Buildings · 2022 · JO20 CONSTRUCTION AND SUPPLY
₱5.0MCompleted · 100%
Construction/repair/rehabilitation/improvement of various infrastructure including local projects-national roads and bridges-national roads-pili-tigaon-albay bdry rd.-k0505+700.00-k0505+970.00, Camarines sur 4th legislative district
Roads and bridges · 2021 · REBTRADE INTERNATIONAL CORPORATION
₱193.0MCompleted · 100%
Rehabilitation/reconstruction of roads with slips, Slope collapse and landslide-secondary roads, Pili-tigaon-albay bdry rd.-k0507+620.00 - k0507+960, Camarines sur 4th le
Roads and bridges · 2021 · G.C.I. CONSTRUCTION AND DEV'T. CORP.
₱193.0MCompleted · 100%
Improvement along pili-tigaon-albay boundary road section 1: k0493+523.00 - k0494+142.00section 2: k0494+195.00 - k0494+457.00section 3: k0493+543.00 - k0494+610.00section 4: k0494+666.00 - k0495+228.00sagnay
Roads and bridges · 2021 · LIMCORE CONSTRUCTION AND SUPPLY
₱12.6MCompleted · 100%
Construction of level iii water supply systembarangay sibaguan
Water · 2021 · LIMCORE CONSTRUCTION AND SUPPLY
₱24.8MCompleted · 100%
Construction of multi-purpose buildingsto. niño. sagñay
Buildings · 2021 · LIMCORE CONSTRUCTION AND SUPPLY
₱1.4MCompleted · 100%
Construction of multi-purpose buildingpatitinan
Buildings · 2021 · LIMCORE CONSTRUCTION AND SUPPLY
₱1.4MCompleted · 100%
Construction of multi-purpose building, Barangay catalotoan
Buildings · 2021 · LIMCORE CONSTRUCTION AND SUPPLY
₱1.4MCompleted · 100%
Construction of multi-purpose buildingbongalon/san antonio, Sagnay/tinambac
Buildings · 2021 · LIMCORE CONSTRUCTION AND SUPPLY
₱1.9MCompleted · 100%
Construction of nato road, Section 1: sta.0+000.00 - sta.0+092.00section 2: sta.0+000.00 - sta.0+058.00section 3: sta.0+000.00 - sta.0+045.00section 4: sta.0+000.00 - sta.0+064.00sagnay
Roads and bridges · 2021 · LIMCORE CONSTRUCTION AND SUPPLY
₱1.9MCompleted · 100%
Construction of multi-purpose building, Barangay tinorongan
Buildings · 2021 · LIMCORE CONSTRUCTION AND SUPPLY
₱3.8MCompleted · 100%
Rehabilitation of multi-purpose building, Barangay catalotoan
Buildings · 2021 · LIMCORE CONSTRUCTION AND SUPPLY
₱1.4MCompleted · 100%
Construction of flood control mitigation structure along sagnay riversection 1: sta.0+460.00 - sta.06+580.00section 2: sta.0+583.00 - sta.0+841.00sagnay
Flood control · 2021 · ALRO CONSTRUCTION & DEVELOPMENT CORP.
₱46.5MCompleted · 100%
Rehabilitation/major repair of bridge, Igot bridge (b02389lz) along pili-albay boundary road, K0503+096.00 - k0503+110.00, Patitinan
Roads and bridges · 2021 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱8.9MCompleted · 100%
Preventive maintenance (asphalt overaly) along pili-tigaon-albay boundary road, K0504+000.00 - k0504+691.00patitinan
Roads and bridges · 2021 · NFH CONSTRUCTION & SUPPLY
₱9.3MCompleted · 100%
Rehabilitation/reconstruction of roads with slips, Slope collapse and landslide along pili-tigaon-albay boundary roadk0502+700 - k0502+755k0503+890 - k0504+095sagnay
Roads and bridges · 2021 · ALRO CONSTRUCTION & DEVELOPMENT CORP.
₱72.4MCompleted · 100%
Rehabilitation/major repair of bridge, Odiongan bridge (b02385lz) along pili-tigaon-albay boundary road, K0489+373.00 - k0489+387.00barangay turague
Roads and bridges · 2021 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱7.4MCompleted · 100%
Improvement of public buildings and construction of evacuation centers, Region v, Brgy. san isidro
Buildings · 2020 · PEDXING BUILDERS, INC.
₱33.4MOn-Going · 100%
Rehabilitation/reconstruction of national roads with slips, Slope collapse, And landslide-secondary roads, Pili-tigaon-albay bdry. rd.-k0497+680.44-k0497+744.50 & k0506+080.00-k0506+190
Roads and bridges · 2020 · HI-TONE CONSTRUCTION & DEVELOPMENT CORP.
₱116.0MCompleted · 100%
Rehabilitation/reconstruction of national roads with slips, Slope collapse and landslide-secondary roads, Pili-tigaon-albay bdry. rd.-k0497+580.00-k0497+680.44, Camarines sur 4th
Roads and bridges · 2020 · HI-TONE CONSTRUCTION & DEVELOPMENT CORP.
₱120.4MCompleted · 100%
Construction of flood control structures along patitinan river (igot river) sagnay camarines sur
Flood control · 2020 · PARTIDO CONSTRUCTION & SUPPLY
₱46.6MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
LIMCORE CONSTRUCTION AND SUPPLY23 projects · ₱160.7M
2
ALRO CONSTRUCTION & DEVELOPMENT CORP.18 projects · ₱1.24B
3
PARTIDO CONSTRUCTION & SUPPLY7 projects · ₱239.8M
4
SOLERA CONSTRUCTION AND SUPPLY6 projects · ₱50.6M
5
NFH CONSTRUCTION & SUPPLY5 projects · ₱190.9M