Tigaon: Government

Municipality in Camarines Sur, Bicol, Luzon · 23 barangays

National projects

Built by DPWH in Tigaon since 2016.

185projects
₱2.83Bin all
35ongoing
0slow
  • Roads and bridges ₱1.16B
  • Flood control ₱1.05B
  • Buildings ₱445.8M
  • Schools ₱129.4M
  • Water ₱44.7M

Showing 1 to 30 of 35

₱3.9MOn-Going · 0%
₱3.9MOn-Going · 1%
Construction of footbridge with slope protection, Zone 7, Barangay vinagre Flood control · 2026 · SOLERA CONSTRUCTION AND SUPPLY
₱6.8MOn-Going · 1%
₱9.3MOn-Going · 42%
Construction of road, Barangay san antonio, Camarines sur sta.1+400 - sta.2+100 Roads and bridges · 2026 · PARTIDO CONSTRUCTION & SUPPLY
₱9.2MOn-Going · 1%
Rehabilitation/major repair of permanent bridges, Balangao br. (b02379lz) along pili-tigaon-albay bdry rd.tigaon Roads and bridges · 2026 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱18.6MOn-Going · 68%
Rehabilitation of multi-purpose building, Barangay abo Buildings · 2025 · JO20 CONSTRUCTION AND SUPPLY
₱9.5MOn-Going · 37%
₱18.8MOn-Going · 100%
Construction of multi-purpose building (phase-2) Buildings · 2025 · JO20 CONSTRUCTION AND SUPPLY
₱14.2MOn-Going · 30%
₱11.3MOn-Going · 100%
₱9.9MOn-Going · 100%
₱4.7MOn-Going · 100%
Rehabilitation of road with drainage canal, Manlangit st., Barangay poblacion Flood control · 2025 · LIMCORE CONSTRUCTION AND SUPPLY
₱9.4MOn-Going · 100%
Construction of flood mitigation structure with groundsill, Barangay gaao Flood control · 2025 · SOLERA CONSTRUCTION AND SUPPLY
₱11.3MOn-Going · 100%
₱38.7MOn-Going · 98%
Construction of road, Zone 4, Barangay casuna Roads and bridges · 2025 · J.C NIETO CONSTRUCTION
₱4.8MOn-Going · 100%
Construction of road, Barangay san francisco Roads and bridges · 2025 · J.C NIETO CONSTRUCTION
₱4.8MOn-Going · 100%
₱4.7MOn-Going · 100%
Rehabilitation of road with drainage canal, Malaguas st.-quezon st., Barangay poblacion Flood control · 2025 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱23.5MOn-Going · 99%
₱14.4MOn-Going · 100%
₱2.5MOn-Going · 100%
₱14.3MOn-Going · 0%
Construction of multi-purpose building (completion) Buildings · 2025 · JO20 CONSTRUCTION AND SUPPLY
₱4.7MOn-Going · 93%
Widening along pili-tigaon-albay bdry rd. k0473+847 - k0474+918 k0475+144 - k0476+058 tigaon Roads and bridges · 2025 · E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
₱68.3MOn-Going · 90%
Construction of multi-purpose facility in brgy. coyaoyao Buildings · 2025 · J.C NIETO CONSTRUCTION
₱4.8MOn-Going · 100%
Construction of multi-purpose building, Barangay gubat Buildings · 2025 · JO20 CONSTRUCTION AND SUPPLY
₱4.8MOn-Going · 98%
Construction of road Roads and bridges · 2025 · JO20 CONSTRUCTION AND SUPPLY
₱10.5MOn-Going · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

Who builds here

Contractors with the most projects in Tigaon since 2016.

1
JO20 CONSTRUCTION AND SUPPLY32 projects · ₱257.1M
2
E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)19 projects · ₱610.1M
3
LIMCORE CONSTRUCTION AND SUPPLY18 projects · ₱88.0M
4
J.C NIETO CONSTRUCTION17 projects · ₱181.4M
5
HRB CONSTRUCTION17 projects · ₱55.9M