San Andres: Government

Municipality in Catanduanes, Bicol, Luzon · 38 barangays

National projects

Built by DPWH in San Andres since 2016.

119projects
₱2.74Bin all
12ongoing
3slow
  • Roads and bridges ₱1.61B
  • Flood control ₱742.9M
  • Schools ₱222.0M
  • Buildings ₱129.9M
  • Water ₱35.7M
Construction of road, Jct. national road, Brgy. simamla, Vi Roads and bridges · 2023 · AL-JON CONSTRUCTION DEVELOPMENT, INC.
₱28.8MOn-Going · 0%Slow

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in San Andres since 2016.

1
A.V. LAYNES TRADING AND CONSTRUCTION15 projects · ₱173.6M
2
AL-JON CONSTRUCTION DEVELOPMENT, INC.13 projects · ₱230.4M
3
CHRISMAN CONSTRUCTION & SUPPLIES CORP.7 projects · ₱108.2M
4
NVR CONSTRUCTION7 projects · ₱31.0M
5
E.R. RODRIGUEZ CONSTRUCTION CORPORATION6 projects · ₱245.1M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →