SM
San Miguel: Government
Municipality in Catanduanes, Bicol, Luzon · 24 barangays
National projects
68projects
₱1.67Bin all
8ongoing
0slow
- Flood control ₱803.1M
- Roads and bridges ₱665.1M
- Schools ₱140.7M
- Water ₱36.6M
- Buildings ₱28.0M
Showing 31 to 60 of 68
Construction of hanging bridge at sition sunduan, Brgy. pagsangahan
Roads and bridges · 2019 · TRI-JOHN TRADING & CONSTRUCTION
₱5.9MCompleted · 100%
Construction (completion) of four(4) storey eight(8) classroom-two(2) units (7x18) science laboratory, Two units (7x18) ict laboratory & four units (7x18) regular workshop school building, San miguel rural development high school san miguel
Schools · 2018 · CHRISMAN CONSTRUCTION & SUPPLIES CORP. / JYM CONSTRUCTION & SUPPLY
₱4.2MCompleted · 100%
Completion) of three storey six classroom-two units (7x18) science laboratory, Toe units (7x18) ict laboratory & two units (7x18) classroom regular workshop school building, Mabato national high school, (smrdhs annex) san miguel
Schools · 2018 · CHRISMAN CONSTRUCTION & SUPPLIES CORP.
₱3.4MCompleted · 100%
Construction of four(4) storey eight (8) classroom-two(2) units (7 x 18) science laboratory, Two(2) units (7 x 18) ict laboratory & four(4) units (7 x 18) regular workshop sb, San miguel rural development hs
Schools · 2018 · CHRISMAN CONSTRUCTION & SUPPLIES CORP. / JYM CONSTRUCTION & SUPPLY
₱37.5MCompleted · 100%
Construction of multi-purpose building, Pagsangahan elementary school
Schools · 2018 · ALTAPIL CONSTRUCTION & SUPPLY
₱2.0MCompleted · 100%
Construction of multi-purpose building/covered plaza, Brgy. dayawa
Buildings · 2018 · A.V. LAYNES TRADING AND CONSTRUCTION
₱2.9MCompleted · 100%
Construction of three (3) storey six (6) classroom - two (2) units (7x18) science laboratory and two (2) units (7x18) ict laboratory and 2 uinits (7x18) classroom regular workshop school building, Mabato national high school, Mabato
Schools · 2018 · CHRISMAN CONSTRUCTION & SUPPLIES CORP.
₱30.1MCompleted · 100%
Construction of two(2) storey bldg.with one ict (gf) and one ict (sf) laboratory units school bldg. (under deped cy 2018 beff) medroso-mendoza nhs, Calabanga camarines sur
Schools · 2018 · 3-L CONSTRUCTION
₱12.8MCompleted · 100%
Concreting of shoulder with concrete line canal junction road bato-baras km. 12+000 - km. 20+000
Roads and bridges · 2018 · CHRISMAN CONSTRUCTION & SUPPLIES CORP.
₱19.0MCompleted · 100%
Concreting of pagsangahan-gma fmr, Brgy. pagsangahan and brgy. gma
Roads and bridges · 2018 · CHRISMAN CONSTRUCTION & SUPPLIES CORP.
₱9.6MCompleted · 100%
Construction/rehabilitation/improvement of brgy. solong road
Roads and bridges · 2018 · HI-TONE CONSTRUCTION & DEVELOPMENT CORP.
₱19.0MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems, Construction of solong river control
Flood control · 2018 · HI-TONE CONSTRUCTION & DEVELOPMENT CORP.
₱19.0MCompleted · 100%
Improvement secondary roads catanduanes circumferential road k0013+000-k0015+486, Catanduaes
Roads and bridges · 2018 · NQA CONSTRUCTION & SUPPLY
₱41.6MCompleted · 100%
Construction of road, Brgy. san marcos
Roads and bridges · 2018 · NQA CONSTRUCTION & SUPPLY
₱1.9MCompleted · 100%
Construction of multi-purpose building (abaca buying station)
Buildings · 2018 · TRI-JOHN TRADING & CONSTRUCTION
₱2.9MCompleted · 100%
Construction of spillway from barangay katipunan to barangay obo
Flood control · 2018 · HI-TONE CONSTRUCTION & DEVELOPMENT CORP.
₱23.6MCompleted · 100%
Preventive maint.-tertiary rd jct. bato-baras road (k0009+000-k0009+300, K0012+000-k0013+000, K0013+000-k0014+000, K0014+000-k0014+300, K0015+000-k0015+980, K0016+000-k0016+300, K0016+300-k0017+977, K0017+977-k0018+000)
Roads and bridges · 2018 · JD CONSTRUCTION
₱21.8MCompleted · 100%
Construction of multi-purpose building/covered plaza, Brgy. paraiso
Buildings · 2018 · LOURBEL CONSTRUCTION AND SUPPLY INC.
₱4.8MCompleted · 100%
Construction of one (one) storey three (3) classroom school building with toilet, Mabato central elementary schol
Schools · 2017 · NVR CONSTRUCTION
₱3.9MCompleted · 100%
Construction of one(1) storey two(2) classroom (7x9) school building with toliet, Mabato national high school (smrdhs annex)
Schools · 2017 · NVR CONSTRUCTION
₱3.0MCompleted · 100%
Construction of one(1) storey two(2) classroom school building with toilet, Alma elementary school
Schools · 2017 · NVR CONSTRUCTION
₱2.9MCompleted · 100%
Construction of one-storey one-classroom (7m x 22.5m) unique workshop school building, San miguel rural development high school
Schools · 2017 · CHRISMAN CONSTRUCTION & SUPPLIES CORP.
₱4.6MCompleted · 100%
Concreting of tobrejon farm to market road, Brgy. tobrejon
Roads and bridges · 2017 · CHRISMAN CONSTRUCTION & SUPPLIES CORP.
₱5.0MCompleted · 100%
Rehabilitation/reconstruction of national roads with slips, Slip collapse and landslide jct. bato-baras rd-k0013+500-k0013+740, K0022+350-k0023+029, K0023+029
Roads and bridges · 2017 · HI-TONE CONSTRUCTION & DEVELOPMENT CORP.
₱23.5MCompleted · 100%
Construction of covered municipal plaza (evacuation center and solar roofing/rain collector)
Buildings · 2017 · VIRAC NRC CONSTRUCTION
₱9.9MCompleted · 100%
Construction of pagsangahan bhs with birthing facility
Buildings · 2016 · NQA CONSTRUCTION & SUPPLY
₱1.4MCompleted · 100%
Construction/repair/rehabilitation of multi-purpose building (municipal hall)
Buildings · 2016 · CHRISMAN CONSTRUCTION & SUPPLIES CORP.
₱4.0MCompleted · 100%
Rehabilitation/reconstruc tion of national roads with slips, Slope collapse and landslide, San miguel and caramoran @ k0014+900-k0015+900 and k0122+630-k0147+100 at int. section
Roads and bridges · 2016 · ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR
₱36.9MCompleted · 100%
Construction/repair/rehabi litation/improvement od flood control structures/facilities, Const./improvement of brgy. solong spillway at brgy. solong road
Flood control · 2016 · HI-TONE CONSTRUCTION & DEVELOPMENT CORP.
₱19.6MCompleted · 100%
Repair/rehabilitation of slope protection at smmps district iii
Roads and bridges · 2016 · NATHALIA CONSTRUCTION & REALTY DEVELOPMENT
₱4.9MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
Who builds here
1
HI-TONE CONSTRUCTION & DEVELOPMENT CORP.9 projects · ₱599.8M
2
CHRISMAN CONSTRUCTION & SUPPLIES CORP.7 projects · ₱75.7M
3
AL-JON CONSTRUCTION DEVELOPMENT, INC.5 projects · ₱52.3M
4
A.V. LAYNES TRADING AND CONSTRUCTION4 projects · ₱68.1M
5
NQA CONSTRUCTION & SUPPLY4 projects · ₱59.8M