Casiguran: Government

Municipality in Sorsogon, Bicol, Luzon · 25 barangays

National projects

Built by DPWH in Casiguran since 2016.

76projects
₱3.87Bin all
12ongoing
1slow
  • Roads and bridges ₱1.66B
  • Flood control ₱1.17B
  • Buildings ₱789.2M
  • Schools ₱204.3M
  • Water ₱38.0M

Showing 1 to 30 of 76

₱9.7MOn-Going · 100%
₱9.7MOn-Going · 0%
Construction of multi-purpose building at brgy. tiris Buildings · 2025 · ALHADRAX CONSTRUCTION AND SUPPLY
₱9.7MOn-Going · 56%
Rehabilitation of road, Brgy. boton Roads and bridges · 2025 · GDBS BUILDERS AND ENTERPRISE
₱24.0MOn-Going · 2%
₱36.4MOn-Going · 100%
Construction of road, Gogon-san juan road Roads and bridges · 2025 · AREMAR CONSTRUCTION CORPORATION
₱19.8MOn-Going · 100%
Rehabilitation of road at sta. cruz-rizal via ya Roads and bridges · 2025 · AREMAR CONSTRUCTION CORPORATION
₱48.2MOn-Going · 88%
Rehabilitation of road, Yamashita Roads and bridges · 2025 · AREMAR CONSTRUCTION CORPORATION
₱94.3MOn-Going · 98%
Construction of road, Barangay trece martir Roads and bridges · 2025 · AREMAR CONSTRUCTION CORPORATION
₱122.6MOn-Going · 64%
Const. of 2-storey school building, 12-classroom (casiguran central school) Schools · 2024 · FULLEROS BOTOX BUILDERS AND DESIGN / MUNTOPAR BUILDERS CORP.
₱63.3MCompleted · 100%
Construction of multi-purpose building (core shelter), Barangay tulay Buildings · 2024 · AREMAR CONSTRUCTION CORPORATION
₱39.6MCompleted · 100%
Construction of multi-purpose building(balay na dako), Sorsogon (phase ii) Buildings · 2024 · AREMAR CONSTRUCTION CORPORATION
₱39.6MCompleted · 100%
Construction of multi-purpose building, Barangay tulay Buildings · 2024 · AREMAR CONSTRUCTION CORPORATION
₱39.6MCompleted · 100%
₱77.6MCompleted · 100%
Const. of poblacion road network, Magallane Roads and bridges · 2023 · ALNINO CONSTRUCTION & SUPPLY CORPORATION
₱77.0MCompleted · 100%
₱9.8MCompleted · 100%
Construction of casiguran coastal road Flood control · 2022 · C.T. LEONCIO CONSTRUCTION & TRADING
₱48.0MCompleted · 100%
₱99.0MCompleted · 100%
Construction of rizal-tiris-gogon-escuala road Roads and bridges · 2022 · KM88 CONSTRUCTION INC
₱74.2MCompleted · 100%
Improvement of timbayog-san isidro road leadin Roads and bridges · 2022 · M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR
₱69.3MCompleted · 100%
₱36.7MCompleted · 100%
₱77.2MCompleted · 100%
Construction of flood mitigation structure and embankment of lungib seawall Flood control · 2022 · AREMAR CONSTRUCTION CORPORATION
₱38.0MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Casiguran since 2016.

1
C.T. LEONCIO CONSTRUCTION & TRADING14 projects · ₱583.1M
2
AREMAR CONSTRUCTION CORPORATION13 projects · ₱900.3M
3
B. VICENCIO BUILDERS (BVB), INC.6 projects · ₱286.8M
4
MUNTOPAR BUILDERS CORP.5 projects · ₱151.5M
5
M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR4 projects · ₱278.0M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →