MA
Matnog: Government
Municipality in Sorsogon, Bicol, Luzon · 40 barangays
National projects
94projects
₱4.29Bin all
21ongoing
1slow
- Roads and bridges ₱2.45B
- Flood control ₱1.04B
- Buildings ₱656.0M
- Other ₱70.5M
- Schools ₱67.3M
- Water ₱14.2M
Showing 1 to 30 of 68
Construction of multi-purpose building (covered court) at brgy. manurabi
Buildings · 2025 · SKYBISON CONSTRUCTION
₱9.8MCompleted · 100%
Const/imprvt of access roads leading to declared tourism destinations (tourism rd. infra. program -)
Roads and bridges · 2025 · AREMAR CONSTRUCTION CORPORATION
₱62.4MCompleted · 100%
Const/imprvt of access roads leading to declared tourism destinations (tourism rd infra prog - trip)
Roads and bridges · 2025 · AREMAR CONSTRUCTION CORPORATION
₱62.4MCompleted · 100%
Const/imprv't. of access roads leading to declared tourism destinations (trip) bulan-matnog-sta. mag
Roads and bridges · 2024 · AREMAR CONSTRUCTION CORPORATION
₱114.9MCompleted · 100%
Construction of paghuliran coastal road with shore protection, Sorsogo
Roads and bridges · 2023 · WELEX CONSTRUCTION, INCORPORATED
₱86.8MCompleted · 100%
Construction of flood control structure pange bridge (upstream), Barangay pange
Flood control · 2023 · ALRO CONSTRUCTION & DEVELOPMENT CORP.
₱115.8MCompleted · 100%
Construction of flood control structure, Hidhid river (upstream), Barangay hidhid, Matno
Flood control · 2023 · ALRO CONSTRUCTION & DEVELOPMENT CORP.
₱125.4MCompleted · 100%
Const./imprvt. of access roads leading to declared tourism destinations (tourism rd. infra prog.-tri
Roads and bridges · 2024 · AREMAR CONSTRUCTION CORPORATION
₱96.5MCompleted · 100%
Construction of solar water system level ii at brgy. manjumlad, Manjumlad, Sorsogon (2nd legislative d
Water · 2023 · ACIER & BETON CONSTRUCTION
₱4.9MCompleted · 100%
Concreting of farm-to-market roads at matnog and juban, Sorsogon (cluster x) brgy. naburakan to brgy
Roads and bridges · 2023 · FULLEROS BOTOX BUILDERS AND DESIGN
₱20.9MCompleted · 100%
Construction of poblacion road network
Roads and bridges · 2023 · AREMAR CONSTRUCTION CORPORATION
₱48.0MCompleted · 100%
Construction of multi-purpose building at brgy. sisigon
Buildings · 2023 · FULLEROS BOTOX BUILDERS AND DESIGN
₱8.2MCompleted · 100%
Const. of river flood protection structure at brgys. caloocan, Camcaman, Camachi
Flood control · 2023 · CARMIG CONSTRUCTION & SUPPLY
₱11.5MCompleted · 100%
Construction of multi-purpose building at matnog and bulusan, Sorsogon (cluster xiv), Sor. &
Buildings · 2023 · MKV BUILDERS AND CONSTRUCTION SUPPLY INC.
₱41.2MCompleted · 100%
Construction of flood mitigation structure, Barangay poropandan
Flood control · 2023 · KYLA CONSTRUCTION SUPPLY
₱4.8MCompleted · 100%
Construction of flood protection measures at matnog and irosin, Sorsogon (cluster viii), Brgy. culas
Flood control · 2023 · AREMAR CONSTRUCTION CORPORATION
₱66.5MCompleted · 100%
Const/imprvt of access roads leading to declared tourism destinations (trip) bulan-matnog-sta. magda
Roads and bridges · 2023 · M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR
₱93.4MCompleted · 100%
Construction of matnog poblacion road, Brgy. camcaman, Brgy. camachiles, Brgy. tab
Roads and bridges · 2022 · MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.
₱72.5MCompleted · 100%
Const/imprvt of access roads leading to declared tourism destinations (tourism rd infra program - tr
Roads and bridges · 2022 · STEVEN CONSTRUCTION & SUPPLY
₱93.6MCompleted · 100%
Construction of multi - purpose facility
Buildings · 2022 · STEVEN CONSTRUCTION & SUPPLY
₱59.4MCompleted · 100%
Const/imprvt of access roads leading to declared tourism destinations (trip) bulan-matnog-sta. magda
Roads and bridges · 2022 · MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.
₱96.5MCompleted · 100%
Construction of sea wall at brgy. coron-coron
Flood control · 2022 · MAGDA CONSTRUCTION AND SUPPLY INC.
₱18.2MCompleted · 100%
Construction of flood control structure along rangas river, Tabunan, Sorso
Flood control · 2022 · CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC.
₱65.5MCompleted · 100%
Const/imrpvt of access roads leading to declared tourism destinations (tourism rd. infra. program -
Roads and bridges · 2021 · AREMAR CONSTRUCTION CORPORATION
₱47.2MCompleted · 100%
Construction of matnog municipal police station
Buildings · 2022 · RMH CONSTRUCTION & SUPPLY
₱28.9MCompleted · 100%
Const/imprvt of access roads leading to declared tourism destinations (tourism rd. infra. program -
Roads and bridges · 2022 · AREMAR CONSTRUCTION CORPORATION
₱110.6MCompleted · 100%
Const./imprv't. of access roads leading to declared tourism destinations (tourism rd. infra, Program
Roads and bridges · 2022 · AREMAR CONSTRUCTION CORPORATION
₱100.9MCompleted · 100%
Construction of flood control structure with drainage structure along pawa river, Brgy. pawa
Flood control · 2022 · M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR
₱98.0MCompleted · 100%
Rehabilitation of drainage, Bariis
Flood control · 2021 · DOUBLE R CONSTRUCTION AND SUPPLY
₱1.9MCompleted · 100%
Const of water supply system, Level ii at irosin, Sorsogon & matnog, Sorsogon (cluster xii) sinalmac
Water · 2021 · YENZ CONSTRUCTION
₱4.0MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
AREMAR CONSTRUCTION CORPORATION13 projects · ₱1.05B
2
WELEX CONSTRUCTION, INCORPORATED7 projects · ₱519.5M
3
C.T. LEONCIO CONSTRUCTION & TRADING6 projects · ₱211.7M
4
M.G. SALAZAR CONSTRUCTION CORP. (FOR. M.G. SALAZAR4 projects · ₱384.4M
5
STEVEN CONSTRUCTION & SUPPLY4 projects · ₱193.0M