Town hall contracts
42projects
₱126.2Min all
- Buildings ₱55.8M
- Other ₱34.8M
- Roads and bridges ₱19.2M
- Water ₱12.3M
- Flood control ₱4.2M
The last construction award Santa Magdalena posted on PhilGEPS is from April 2025. A town has to post every award, so the list below is likely not all of its work. The town's own reports are in "Town hall papers".
Showing 1 to 30 of 42
Construction of boulevard /seaside promenade
Other · 2025 · KYLA CONSTRUCTION SUPPLY
₱4.2M
Construction of boulevard /seaside promenade
Other · 2025 · KYLA CONSTRUCTION SUPPLY
₱4.2M
Rehabilitation of lgu buildings
Buildings · 2024 · LHBJ CONSTRUCTION
₱3.0M
Construction of slaughterhouse access road
Roads and bridges · 2023 · TOPSPIN CONSTRUCTION
₱975K
Construction of access road
Roads and bridges · 2023 · TOPSPIN CONSTRUCTION
₱2.0M
Construction of farm to market road (salvacion to san roque) and construction of pilit buntay road
Roads and bridges · 2023 · LHBJ CONSTRUCTION
₱2.0M
Improvement of municipal public park
Other · 2023 · KOBE CONSTRUCTION
₱2.0M
Concreting of farm to market road san sebastian
Roads and bridges · 2023 · TOPSPIN CONSTRUCTION
₱4.0M
Upgrading /improvement of existing water system of san bartolome
Water · 2023 · TOPSPIN CONSTRUCTION
₱3.2M
Construction of health station of barangays; brgy. peñafrancia, Brgy san antonio and brgy salvacion
Other · 2023 · KOBE CONSTRUCTION
₱11.9M
Construction-local bridge-san isidro
Roads and bridges · 2019 · FULLEROS BOTOX BUILDERS AND DESIGN
₱2.0M
Construction of sanitary toilets with hygiene facilities
Buildings · 2018 · FULLEROS BOTOX BUILDERS AND DESIGN
₱1.6M
Rehabilitation of lgu water system at bgys. san antonio & penafrancia
Water · 2018 · FLFB ENTERPRISES AND CONSTRUCTION SERVICES
₱2.0M
Rehabilitation and improvement of local bridge-la esperanza
Roads and bridges · 2018 · FULLEROS BOTOX BUILDERS AND DESIGN
₱998K
Upgrading of local road-sitio bliss, Bgy. san antonio
Roads and bridges · 2018 · FULLEROS BOTOX BUILDERS AND DESIGN
₱998K
Itb-closure/rehab of old dump sites-bgys. san antonio & 4
Other · 2018 · FULLEROS BOTOX BUILDERS AND DESIGN
₱1.1M
Construction of national child development center
Buildings · 2017 · RGE CONSTRUCTION & SUPPLY
₱2.6M
Construction of fish landing center with observatory tower
Buildings · 2017 · FULLEROS BOTOX BUILDERS AND DESIGN
₱4.9M
Const. of material recovery facility bldg.
Buildings · 2016 · NJNY CONSTRUCTION & SUPPLY
₱1.1M
Construction/upgrade of lgu level 3 water system
Water · 2016 · FULLEROS BOTOX BUILDERS AND DESIGN
₱5.4M
Itb-resurfacing of people’s multi-purpose covered bldg floor
Buildings · 2016 · FULLEROS BOTOX BUILDERS AND DESIGN
₱147K
Procurement for rhu bldg. improvement
Buildings · 2016 · FULLEROS BOTOX BUILDERS AND DESIGN
₱483K
Rehabilitation of municipal street
Roads and bridges · 2016 · FULLEROS BOTOX BUILDERS AND DESIGN
₱539K
Const of wave breaker extension
Other · 2016 · FULLEROS BOTOX BUILDERS AND DESIGN
₱913K
Repair of damages & improvement of mun. covered bldg, Etc.
Buildings · 2016 · FULLEROS BOTOX BUILDERS AND DESIGN
₱621K
Construction of new public market, Phase 1
Buildings · 2016 · FULLEROS BOTOX BUILDERS AND DESIGN
₱10.8M
Const of 2nf flr., Rhu bldg.
Buildings · 2016 · FULLEROS BOTOX BUILDERS AND DESIGN
₱2.0M
Construction of poro to matacla water system
Water · 2016 · JAYRO CONSTRUCTION & SUPPLY
₱976K
Construction of sitio pinalwahan, Salvacion fmr.
Roads and bridges · 2016 · JOEPEN CONSTRUCTION AND SUPPLY
₱1.7M
Const. of flood control, San roque
Flood control · 2016 · FULLEROS BOTOX BUILDERS AND DESIGN
₱4.2M
Source: PhilGEPS award notices, from the BetterGov.ph open data (CC0).
Town hall papers
1
Budget and 20% development fundDILG Full Disclosure Policy portal
2
Audit reportsCommission on Audit