GA
Gattaran: Government
Municipality in Cagayan, Cagayan Valley, Luzon · 50 barangays
National projects
294projects
₱6.05Bin all
20ongoing
0slow
- Roads and bridges ₱2.81B
- Flood control ₱2.35B
- Buildings ₱454.5M
- Schools ₱383.2M
- Other ₱47.4M
- Water ₱0
Showing 211 to 240 of 248
Const./maintenance of flood mitigation structure and drainage systems -const. of flood mitigation structure- const. of flood control system, Sta. 0+000 - sta. 0+348 (downstream), Brgy. casicallan norte & aguiguican
Flood control · 2018 · EGB CONSTRUCTION CORPORATION / RPF CONSTRUCTION
₱66.9MCompleted · 100%
Const'n/impv't of access road leading to declared tourism destinations-const'n of concrete road-access road leading to tanglagan falls brgy.tanglagan
Roads and bridges · 2018 · VIKING CONSTRUCTION & SUPPLIES
₱47.5MCompleted · 100%
Preventive maintenance-tertiary rds-preventive maintenance of rd: conc. reblocking -jgccsmbpr-k0572+489.70 - k0572+565.10(b/s), To k0576+000 - k0576+061.50(b/s), Brgy. pena weste and san carlos, Cagayan (s00645lz)
Roads and bridges · 2018 · CMG JR. BUILDERS
₱10.7MCompleted · 100%
Preventive maintenance-primary road cagayan valley road k0541+000 - k0542+009, K0543+531 - k0543+731, K0547+750 - k0548+616, Brgys. dummun and l. adviento, Cagayan (s00887lz)
Roads and bridges · 2018 · E.M. CUERPO, INC. / E.V. INTERIOR CONSTRUCTION
₱18.7MCompleted · 100%
Construction of concrete road, Brgy. san vicente
Roads and bridges · 2018 · CMG JR. BUILDERS
₱2.5MCompleted · 100%
Construction of concrete road, Brgy. dummun
Roads and bridges · 2018 · CMG JR. BUILDERS
₱4.9MCompleted · 100%
Construction of concrete road, Brgy. calaoagan basit
Roads and bridges · 2018 · CMG JR. BUILDERS
₱2.0MCompleted · 100%
Construction of concrete road, Brgy. casicallan norte
Roads and bridges · 2018 · F.P. TABBADA CONSTRUCTION
₱2.0MCompleted · 100%
Construction of multi-purpose hall (roofing with columns), Piña weste
Buildings · 2018 · CMG JR. BUILDERS
₱2.0MCompleted · 100%
Construction of multi-purpose hall (stage & comfort room with roof), Cullit
Buildings · 2018 · CMG JR. BUILDERS
₱2.0MCompleted · 100%
Construction of concrete road, Brgy. aguiguican
Roads and bridges · 2018 · CMG JR. BUILDERS
₱4.9MCompleted · 100%
Construction/rehabilitation of flood mitigation facilities within major river basins and principal rivers-construction of cagayan river control callao sur lasam
Flood control · 2018 · JLL PULSAR CONSTRUCTION CORPORATION
₱55.6MCompleted · 100%
Construction of 1-storey (3) three classrooms school building with toilet, Calaoagan dackel nhs - capissayan annex; calaoagan dackel nhs - capissayan annex; calaoagan dackel nhs - capissayan annex
Schools · 2017 · ERIC VAN P. SESBRENO CONSTRUCTION
₱13.4MCompleted · 100%
Construction of various school building with toile, Ganzano es; guising es; nagatutuan es
Schools · 2017 · ERIC VAN P. SESBRENO CONSTRUCTION
₱10.4MCompleted · 100%
Construction of 1-storey (2) two classrooms school building with toilet, Barbarit es; batug sur es; bolos pt. es; capiddigan es
Schools · 2017 · ERIC VAN P. SESBRENO CONSTRUCTION
₱11.9MCompleted · 100%
Construction of various school building with toilet, Mabuno es; basao es; cullit es
Schools · 2017 · ERIC VAN P. SESBRENO CONSTRUCTION
₱10.4MCompleted · 100%
Construction of 1 storey 2 classroom with cr at aggunetan elementary school lasam
Schools · 2017 · D.J.D. CONSTRUCTION INC.
₱2.6MCompleted · 100%
Construction of (2-units) of 1-storey (3) three classrooms with toiletcalaoagan dackel nhs capissayan annex
Schools · 2017 · FOUR M BUILDERS
₱8.8MCompleted · 100%
Construction of (2-units) of 1-storey (2) two classrooms with toilet dummun es
Schools · 2017 · FOUR M BUILDERS
₱5.9MCompleted · 100%
Construction of various school building with toilet, Don mariano marcos national high school, Cagayan; lapogan elementary school
Schools · 2017 · FOUR M BUILDERS
₱5.2MCompleted · 100%
Construction of regional evacuation center, Brgy. bangag, Lallo
Buildings · 2016 · WERR CORPORATION INTERNATIONAL
₱32.9MCompleted · 100%
Paving/construction-cagayan valley rd. k0527+049-k0527+160(bs), To k0529+555-k0529+606.5(bs) (s00887lz), Bgrys. piggatan, Alcala-nassiping
Roads and bridges · 2017 · ORANI CONSTRUCTION AND SUPPLY CORPORATION
₱17.9MCompleted · 100%
Concreting of local road, Sta. ana
Roads and bridges · 2017 · VERZONTAL INFRASTRUCTURE CORPORATION
₱9.4MCompleted · 100%
Const. of tubungan br. connecting brgys. tubungan este and tubungan weste, Brgys. tubungan este and tubungan weste
Roads and bridges · 2017 · APS CONSTRUCTION
₱4.7MCompleted · 100%
Construction and maintenance of bridges along nat'l rd-rehab./major repair of permanent bridges-baracaoit bridge (b02074lz) along jgccsmbpr, Cagayan 1st ld
Roads and bridges · 2017 · TRIBU DESIGN & CONSTRUCTION
₱15.9MCompleted · 100%
Paving/const-jct.magapit-capissayan rd.-k0557+(-225.70)-k0560+252, K0560+283-k0560+475, Brgy.magapit, Lal-lo, Cag. to brgy.naddungan, Cagayan (s00686lz)
Roads and bridges · 2017 · KYRO BUILDERS, INC.
₱53.2MCompleted · 100%
Improvement including drainage jct. magapit capissayan road k0565+420-k0566+687, K0566+711.70-k0567+459, K0567+532-k0568+158.90, K0568+183-k0569+450.50
Roads and bridges · 2017 · W.D. NAVARRO CONSTRUCTION CO.
₱46.7MCompleted · 100%
Widening of nat'l rd k0544+(-903.65)-k0544+(-835.37), To k0546+376.60-k0546+581.30, K0544+051.70-k0544+162.95 r/s - k0547+861.35 r/s, K0551+486-k0552+295, Cagayan 1st ld
Roads and bridges · 2017 · KYRO BUILDERS, INC.
₱46.7MCompleted · 100%
Concreting - barangays nabaccayan and barbarit, Cagayan 1st ld
Roads and bridges · 2017 · MILESTONE 888 CONSTRUCTION INC.
₱9.5MCompleted · 100%
Concreting- barangays newagac and taligan, Cagayan 1st ld
Roads and bridges · 2017 · MILESTONE 888 CONSTRUCTION INC.
₱9.5MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
Who builds here
1
TJMT CONSTRUCTION OPC87 projects · ₱2.36B
2
TIKA CONSTRUCTION INC.62 projects · ₱424.3M
3
CMG JR. BUILDERS28 projects · ₱309.7M
4
APS CONSTRUCTION11 projects · ₱109.8M
5
ERIC VAN P. SESBRENO CONSTRUCTION10 projects · ₱161.9M