Mataasnakahoy: Government

Municipality in Batangas, Calabarzon, Luzon · 16 barangays

National projects

Built by DPWH in Mataasnakahoy since 2018.

167projects
₱3.67Bin all
49ongoing
3slow
  • Roads and bridges ₱2.73B
  • Buildings ₱471.6M
  • Flood control ₱279.3M
  • Schools ₱173.8M
  • Water ₱11.6M

Showing 61 to 90 of 111

Rehabilitation of multi-purpose building in barangay bubuyan Buildings · 2021 · KEASCIA CONSTRUCTION & SUPPLY
₱959KCompleted · 100%
₱4.8MCompleted · 100%
₱4.4MCompleted · 100%
Rehabilitation of drainage system (open canal) at barangay calingatan Flood control · 2019 · OIC CONZTRUCT AND SUPPLY CORPORATION
₱957KCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Mataasnakahoy since 2018.

1
PRIME MOVER'S PHILS. CONSTRUCTION AND SUPPLIES INC.41 projects · ₱250.0M
2
RUSMEN BUILDERS & DEVELOPMENT CORPORATION (FORMERL11 projects · ₱426.6M
3
R.B. ABITAL CONSTRUCTION CORP.7 projects · ₱34.6M
4
TERAVERA CORPORATION6 projects · ₱69.9M
5
OIC CONZTRUCT AND SUPPLY CORPORATION6 projects · ₱16.3M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →