Santa Teresita: Government

Municipality in Batangas, Calabarzon, Luzon · 17 barangays

National projects

Built by DPWH in Santa Teresita since 2016.

97projects
₱1.96Bin all
16ongoing
1slow
  • Roads and bridges ₱1.45B
  • Buildings ₱262.2M
  • Flood control ₱174.4M
  • Schools ₱68.2M
  • Water ₱4.3M

Showing 1 to 30 of 97

Construction of multi-purpose building (covered court), Brgy. saimsim Buildings · 2026 · OIC CONZTRUCT AND SUPPLY CORPORATION
₱4.8MOn-Going · 0%
₱19.4MOn-Going · 18%
Construction of road at brgy. bihis Roads and bridges · 2025 · LUCKY EIGHTY-THREE CONSTRUCTION AND SUPPLY(FOR.VRP
₱4.8MOn-Going · 8%
Construction of road at santa cruz Roads and bridges · 2025 · ARCEGA ACUZAR CONSTRUCTION AND DEVELOPMENT CORPORATION
₱14.3MOn-Going · 66%
₱9.6MOn-Going · 24%
Construction of multi-purpose building at barangay antipolo and poblacion 1 Buildings · 2025 · ROSTEL CONSTRUCTION & SUPPLY
₱13.6MOn-Going · 39%
Construction of multi-purpose building, Poblacion 1 Buildings · 2025 · ROSTEL CONSTRUCTION & SUPPLY
₱19.4MOn-Going · 0%
Construction of multi-purpose building at barangay cutang cawayan Buildings · 2025 · GAWANATO CONSTRUCTION CORPORATION / KEASCIA CONSTRUCTION & SUPPLY
₱52.8MOn-Going · 49%
₱4.8MCompleted · 100%
Improvement of road, Manggahan-san martin-s Roads and bridges · 2025 · TCSC CORP.
₱144.8MCompleted · 100%
Construction of taal lake circumfer Roads and bridges · 2025 · NDA BUILDERS AND DEVELOPERS
₱28.6MOn-Going · 9%
Widening - secondary roads, Palico-balayan-batangas rd Roads and bridges · 2025 · MAK-JAY CONSTRUCTION / VAN MAKJAY CONSTRUCTION
₱39.2MOn-Going · 82%
Construction of multi-purpose building, Barangay antipolo Buildings · 2025 · OIC CONZTRUCT AND SUPPLY CORPORATION
₱4.8MOn-Going · 78%
Rehabilitation of multi-purpose building, Barangay cuta east Buildings · 2025 · OIC CONZTRUCT AND SUPPLY CORPORATION
₱4.8MOn-Going · 100%
Construction of road, Barangay inicbulan, B Roads and bridges · 2024 · RGE CONST. AND SUPPLY INC.
₱14.0MOn-Going · 0%
₱22.4MCompleted · 100%
Concreting of brgy. bihis to brgy. burol fmr, Brgy. bihis and brgy. burol Roads and bridges · 2024 · OIC CONZTRUCT AND SUPPLY CORPORATION
₱15.4MOn-Going · 54%Slow
Construction of multi-purpose hall (health center), Barangay poblacion 1 Buildings · 2024 · OIC CONZTRUCT AND SUPPLY CORPORATION
₱9.9MCompleted · 100%
Widening - secondary roads, Palico - balayan - batangas rd Roads and bridges · 2024 · MAK-JAY CONSTRUCTION / VAN MAKJAY CONSTRUCTION
₱68.0MCompleted · 100%
Improvement of san luis-alitagtag road pa Roads and bridges · 2024 · TCSC CORP.
₱144.8MCompleted · 100%
₱7.1MCompleted · 100%
Concreting of brgy. kalayaan to brgy. irukan fmr, Brgy. kalayaan to brgy. irukan Roads and bridges · 2023 · MICLOVER GENERAL CONSTRUCTION & IRON WORKS
₱11.9MCompleted · 100%
Construction of road, Brgy. tambo ilaya (malabo), Ba Roads and bridges · 2023 · V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL
₱9.9MCompleted · 100%
₱19.8MCompleted · 100%
Rehabilitation of multi-purpose building, Poblacion 2 Buildings · 2023 · VAN MAKJAY CONSTRUCTION
₱4.9MCompleted · 100%
Construction of road in brgy. saimsim Roads and bridges · 2023 · NDA BUILDERS AND DEVELOPERS
₱9.9MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Santa Teresita since 2016.

1
NDA BUILDERS AND DEVELOPERS21 projects · ₱162.0M
2
OIC CONZTRUCT AND SUPPLY CORPORATION13 projects · ₱137.7M
3
ARSVICO CONSTRUCTION AND DEVELOPMENT CORP. (FORMER9 projects · ₱153.2M
4
JERIS CONSTRUCTION AND SUPPLY6 projects · ₱15.0M
5
ROSTEL CONSTRUCTION & SUPPLY4 projects · ₱72.2M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →