National projects

Built by DPWH in Santa Rosa City since 2016.

322projects
₱8.04Bin all
48ongoing
6slow
  • Flood control ₱4.42B
  • Buildings ₱1.53B
  • Roads and bridges ₱1.30B
  • Schools ₱650.9M
  • Other ₱141.1M
  • Water ₱8.7M

Showing 1 to 30 of 322

Rehabilitation of drainage, Barangay dila Flood control · 2025 · RC TEJADA CONSTRUCTION INC.
₱4.9MOn-Going · 77%
Installation of solar streetlights at barangays sinalhan and aplaya Roads and bridges · 2025 · MG SAMIDAN CONSTRUCTION
₱142.0MOn-Going · 2%
Construction of multi-purpose building, San lorenzo phase 1-b Buildings · 2025 · RC TEJADA CONSTRUCTION INC.
₱4.9MOn-Going · 100%
Rehabilitation of drainage canal, Brgy. caingin Flood control · 2025 · RC TEJADA CONSTRUCTION INC.
₱9.7MOn-Going · 64%
Installation of solar streetlights at barangays pulong santa cruz, Don jose, And sto. domingo Roads and bridges · 2025 · UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP.
₱94.7MOn-Going · 27%
Construction of multi-purpose building, Barangay marco polo Buildings · 2025 · LE BRON CONSTRUCTION
₱9.7MOn-Going · 93%
Installation of solar streetlights at barangays pooc and caingin Roads and bridges · 2025 · UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP.
₱142.1MOn-Going · 30%
Installation of solar streetlights at barangays balibago and dila Roads and bridges · 2025 · UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP.
₱142.0MOn-Going · 27%
Rehabilitation of flood control phase 1 along brgy. santo domingo Flood control · 2025 · J. SIMEON CONSTRUCTION
₱97.1MOn-Going · 67%
Rehabilitation of bridge, Nia- barangay caingin Roads and bridges · 2025 · LAMARCUS BUILDERS AND CONSTRUCTION INC.
₱4.9MOn-Going · 0%
Rehabilitation of multi-purpose building (covered court), Barangay tagapo Buildings · 2025 · LAMARCUS BUILDERS AND CONSTRUCTION INC. / R.R. ENCABO CONSTRUCTORS INCORPORATED
₱38.9MOn-Going · 0%
Construction of drainage canal (pitang creek), Diezmo ris Flood control · 2025 · LAMARCUS BUILDERS AND CONSTRUCTION INC.
₱9.6MOn-Going · 0%
Rehabilitation of drainage structure, Phase 1, Barangay malitlit Flood control · 2025 · LAMARCUS BUILDERS AND CONSTRUCTION INC.
₱4.9MOn-Going · 100%
Rehabilitation of road, Barangay macabling Roads and bridges · 2025 · DATZLAV CONSTRUCTION
₱4.8MCompleted · 100%
Rehabilitation of multi-purpose building, Barangay balibago Buildings · 2025 · LAMARCUS BUILDERS AND CONSTRUCTION INC.
₱4.9MCompleted · 100%
Rehabilitation of drainage structure, Phase 2, Barangay malitlit Flood control · 2025 · LAMARCUS BUILDERS AND CONSTRUCTION INC.
₱9.8MOn-Going · 45%
Rehabilitation of drainage canal, Bsrv- barangay pooc Flood control · 2025 · LAMARCUS BUILDERS AND CONSTRUCTION INC.
₱9.7MOn-Going · 91%
Rehabilitation of road, Barangay pooc Roads and bridges · 2025 · LAMARCUS BUILDERS AND CONSTRUCTION INC.
₱4.9MCompleted · 100%
Rehabilitation of drainage, Barangay macabling Flood control · 2025 · LAMARCUS BUILDERS AND CONSTRUCTION INC.
₱4.9MOn-Going · 100%
Rehabilitation of multi-purpose building (covered court), Barangay tagapo Buildings · 2024 · LAMARCUS BUILDERS AND CONSTRUCTION INC. / R.R. ENCABO CONSTRUCTORS INCORPORATED
₱38.9MOn-Going · 0%
Construction of river protection structure along malitlit waterways (near ust), Phase 1 Flood control · 2025 · ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
₱49.3MOn-Going · 38%
Construction of river protection structure near san lorenzo road, Phase 1 Flood control · 2025 · ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
₱94.3MOn-Going · 69%
Construction of road, Nia road, Barangay pooc Roads and bridges · 2025 · LAMARCUS BUILDERS AND CONSTRUCTION INC.
₱4.8MOn-Going · 100%
Construction (completion) of multi-purpose building, Barangay dita Buildings · 2025 · LAMARCUS BUILDERS AND CONSTRUCTION INC.
₱29.0MOn-Going · 0%
Construction of river protection structure near san lorenzo road, Phase 2 Flood control · 2025 · R.R. ENCABO CONSTRUCTORS INCORPORATED
₱94.2MOn-Going · 0%
Construction of river protection structure along malitlit waterways, (near eton greenfield junction) Flood control · 2025 · ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
₱94.2MOn-Going · 84%
Construction of river protection structure near panorama school Schools · 2025 · ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
₱38.1MOn-Going · 19%
Construction of river protection structure along malitlit waterways (near river bend homes), Phase 2 Flood control · 2025 · DATZLAV CONSTRUCTION / JG MALIUANAG CONSTRUCTION SERVICES
₱47.7MOn-Going · 49%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Santa Rosa City since 2016.

1
DATZLAV CONSTRUCTION25 projects · ₱185.5M
2
ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 31762)23 projects · ₱291.9M
3
ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)22 projects · ₱611.4M
4
HARVEE ENTERPRISES19 projects · ₱183.5M
5
11 DIAMOND EAGLE CONSTRUCTION CORPORATION17 projects · ₱224.3M