National projects
544projects
₱18.61Bin all
122ongoing
5slow
- Flood control ₱12.22B
- Roads and bridges ₱5.00B
- Schools ₱749.0M
- Buildings ₱605.1M
- Water ₱23.3M
- Other ₱14.0M
Showing 121 to 122 of 122
Const./maint. of flood mitigation structures and drainage systems-const. of flood control structures along san miguel river (downstream), Brgy. agustin
Flood control · 2023 · FLORDES CONSTRUCTION & TRADING CORP.
₱86.8MOn-Going · 96%
Construction/maintenance of flood mitigation structures and drainage systems-construction of flood control structure, San miguel river, Barangay salangan
Flood control · 2023 · 729 CONSTRUCTION, INC.
₱52.2MOn-Going · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
FLORDES CONSTRUCTION & TRADING CORP.37 projects · ₱2.45B
2
M.R. SANTIAGO CONSTRUCTION32 projects · ₱198.4M
3
EIRISH BUILDERS & SUPPLY INC.22 projects · ₱447.4M
4
L.R. TIQUI BUILDERS, INC.20 projects · ₱1.07B
5
ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)18 projects · ₱662.9M