San Jose City: Government

City in Nueva Ecija, Central Luzon, Luzon · 38 barangays

Town hall contracts

Construction contracts the town hall of San Jose City awarded and posted on PhilGEPS.

721projects
₱1.94Bin all
  • Schools ₱610.2M
  • Roads and bridges ₱416.7M
  • Water ₱370.9M
  • Buildings ₱248.0M
  • Flood control ₱164.9M
  • Other ₱124.8M

The last construction award San Jose City posted on PhilGEPS is from March 2025. A town has to post every award, so the list below is likely not all of its work. The town's own reports are in "Town hall papers".

All

Showing 481 to 510 of 721

Construction of slope protection and stalls (buko stalls) city public market Flood control · 2017 · R.A. LINDAIN CONSTRUCTION
₱210K
Rehabilitation of perimeter fence at city transfer station, Brgy. sto. tomas Other · 2017 · GREENWALL CONSTRUCTION
₱220K
Upgrading of flooring of multi purpose hall at calaocan elementary school Schools · 2017 · R.A. LINDAIN CONSTRUCTION
₱350K
Reconstruction of elevated water tank at zone 7, Brgy. san juan Other · 2017 · VICTORIOUS TRADING AND ENGINEERING SERVICES
₱554K
Construction of drainage system at tanibong, Brgy. abar 1st Flood control · 2017 · VICTORIOUS TRADING AND ENGINEERING SERVICES
₱669K
Construction of street food stalls at premiumed iii city public market Roads and bridges · 2017 · GREENWALL CONSTRUCTION
₱999K
Improvement & rehabilitation of caloocan - tulat road Roads and bridges · 2017 · F.C. MARTINEZ CONSTRUCTION
₱10.0M
Construction of additional day care center at barangay tondod Buildings · 2017 · GREENWALL CONSTRUCTION
₱399K
Construction of multi-purpose hall building at barangay caloocan Buildings · 2017 · GREENWALL CONSTRUCTION
₱2.9M
Construction of multi-purpose hall building at barangay f.e. marcos Buildings · 2017 · R.A. LINDAIN CONSTRUCTION
₱2.9M
Construction of multi-purpose hall at city public market Buildings · 2017 · F.C. MARTINEZ CONSTRUCTION
₱10.0M
Repair and renovation of old gso Other · 2017 · R. PRANILLA BUILDERS
₱118K
Construction of one barrel reinforced concrete box culvert at sitio binabuyan (zone 6 porais-binabuyan boundary) Flood control · 2017 · R.A. LINDAIN CONSTRUCTION
₱164K
Construction of i ♥ sjc (standee and buil up letters) Other · 2017 · R. PRANILLA BUILDERS
₱186K
Repair of 2-storey felimon type school building at abar 1st elementary school Schools · 2017 · GREENWALL CONSTRUCTION
₱311K
Construction of slope protection at villa floresta Flood control · 2017 · GREENWALL CONSTRUCTION
₱600K
Repair of 2-storey felimon type school building at encarnatcion subd. elementary school Schools · 2017 · MACCO CONSTRUCTION
₱670K
Concreting of road at zone 11 barangay abar 1st Roads and bridges · 2017 · F.C. MARTINEZ CONSTRUCTION
₱974K
Construction of drainage system at sto nino 1st Flood control · 2017 · R.A. LINDAIN CONSTRUCTION
₱1.7M
Construction of computer laboratory building Buildings · 2017 · R.A. LINDAIN CONSTRUCTION
₱2.2M
Construction of 2-storey four classroom school building at abar 2nd elementary school Schools · 2017 · F.C. MARTINEZ CONSTRUCTION
₱5.7M
Constrcution of slope protection along sapang tuntunin Flood control · 2017 · WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION
₱6.6M
Concreting of road at barangay kita-kita Roads and bridges · 2017 · GREENWALL CONSTRUCTION
₱773K
Construction of drainage at barangay rafael rueda Flood control · 2017 · D.S. PAMINTUAN CONSTRUCTION
₱899K
Concreting of feeder road at barangay dizol Roads and bridges · 2017 · F.C. MARTINEZ CONSTRUCTION
₱1.2M
Concreting of road at barangay pinili Roads and bridges · 2017 · F.C. MARTINEZ CONSTRUCTION
₱1.7M
Concreting of road at villa ramos Roads and bridges · 2017 · F.C. MARTINEZ CONSTRUCTION
₱4.5M
Installation of reinforced concrete pipe (cross drain) Other · 2017 · RVY CONSTRUCTION
₱77K
Replacement of ceiling san juan elementary school Schools · 2017 · RVY CONSTRUCTION
₱93K
Concrete pavement between health center and pinili chapel Roads and bridges · 2017 · RVY CONSTRUCTION
₱169K

Source: PhilGEPS award notices, from the BetterGov.ph open data (CC0).

Town hall papers

Not every project is on PhilGEPS. These are the town's own reports.

1
Budget and 20% development fundDILG Full Disclosure Policy portal
2
Audit reportsCommission on Audit

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board.

Post on Talk →