National projects
1809projects
₱56.80Bin all
349ongoing
19slow
- Flood control ₱28.52B
- Roads and bridges ₱19.08B
- Buildings ₱5.70B
- Schools ₱3.16B
- Water ₱307.6M
- Other ₱38.6M
Showing 1351 to 1380 of 1,809
Construction of slope protection at sindol creek, Brgy. sindol
Flood control · San Felipe · 2018 · RBDIWA BUILDERS AND CONSTRUCTION SUPPLY
₱9.4MCompleted · 100%
Preventive maintenance of tertiary roads along san marcelino- san antonio- san n
Roads and bridges · San Narciso · 2018 · 4B CONSTRUCTION CORPORATION
₱14.7MCompleted · 100%
Construction of slope protection/ flood control along pamatawan river, Phase iv, Sta. 1+369.50- sta. 2+051
Flood control · San Antonio · 2018 · CDC CONSTRUCTION & SUPPLIES / JASA GD 2000 CONSTRUCTION CORPORATION
₱38.2MCompleted · 100%
Construction of multi- purpose building, Brgy. apo- apo, Cabangan, Zambales; b. construction of multi- purpose building, Brgy. lomboy, Cabangan, Zambales; c. construction of multi- purpose building, Br
Buildings · San Felipe · 2018 · STO. CRISTO CONSTRUCTION & TRADING INC.
₱17.3MCompleted · 100%
Construction of slope protection/ flood control works in sagpat dike
Flood control · San Felipe · 2018 · HIGH STRENGTH DEV. CORPORATION
₱23.5MCompleted · 100%
Improvement, Tertiary roads along san marcelino- san antonio- san narciso road, K01
Roads and bridges · San Narciso · 2018 · 4B CONSTRUCTION CORPORATION
₱13.8MCompleted · 100%
Preventive maintenance of secondary roads along olongapo- bugallon road- k0161+0
Roads and bridges · San Narciso · 2018 · 4B CONSTRUCTION CORPORATION
₱8.3MCompleted · 100%
Construction of slope protection/ flood control works in maloma dike (downstream), San felipe side
Flood control · San Felipe · 2018 · LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION
₱23.5MCompleted · 100%
Construction of slope protection/ flood control, Bangan seawall
Flood control · Botolan · 2018 · FERMIDA CONSTRUCTION SERVICES AND SUPPLIES / R.J. IBARRA CONSTRUCTION
₱19.0MCompleted · 100%
Construction of slope protection/ flood control works in tanguay river
Flood control · Cabangan · 2018 · ROMA CONSTRUCTION & DEVELOPMENT CORPORATION
₱23.5MCompleted · 100%
Construction of slope protection/ flood control, Sto. niño river control, Upstream, North side
Flood control · Cabangan · 2018 · ORANI CONSTRUCTION AND SUPPLY CORPORATION
₱37.6MCompleted · 100%
Widening-secondary roads, Olongapo-bugallon rd., K0131+580 - k0133+000, K0135+738 - k0137+012, K0137+012 - k0137+295
Roads and bridges · Subic · 2018 · REPOLMAN CONSTRUCTION CORP. / THREE W BUILDERS, INC.
₱90.1MCompleted · 100%
Construction of slope protection/ flood control @ tambak river left side (upstream), Barangay palanginan
Flood control · Iba · 2018 · ORANI CONSTRUCTION AND SUPPLY CORPORATION
₱92.6MCompleted · 100%
Construction of slope protection/ flood control, Lauis river, (downstream) north side
Flood control · Candelaria · 2018 · ROMA CONSTRUCTION & DEVELOPMENT CORPORATION
₱23.5MCompleted · 100%
Retrofitting/ strengthening of permanent bridges at balinbocboc bridge (b01442lz) alo
Roads and bridges · Iba · 2018 · ORANI CONSTRUCTION AND SUPPLY CORPORATION
₱24.2MCompleted · 100%
Construction of slope protection/ flood control @ tambak river right side(upstream), Barangay palanginan
Flood control · Iba · 2018 · ORANI CONSTRUCTION AND SUPPLY CORPORATION
₱92.6MCompleted · 100%
Const./maintenance of flood mitigation structures and drainage systems, Improvement of camachile river
Flood control · San Marcelino · 2018 · HIGH STRENGTH DEV. CORPORATION
₱37.7MCompleted · 100%
Widening - secondary roads, Olongapo-bugallon road, K0142+243 - k0142+554, K0142+562 - k0143+279, K0143+287 - k0143+882
Roads and bridges · Subic · 2018 · REPOLMAN CONSTRUCTION CORP. / THREE W BUILDERS, INC.
₱45.6MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems, Dredging of calapandayan river mouth
Flood control · Subic · 2018 · THREE W BUILDERS, INC.
₱19.1MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems, Heightening of vega-lawin dike
Flood control · San Marcelino · 2018 · ORANI CONSTRUCTION AND SUPPLY CORPORATION
₱47.1MCompleted · 100%
Const. of multi-purpose bldg. kolehiyo ng subic (covered court), Baraca-camachile
Buildings · Subic · 2018 · CASUPANAN BUILDERS AND MERCHANDISE
₱3.4MCompleted · 100%
Completion of multi-purpose building, Nagbayan barangay plaza school (covered court), Brgy. nagbayan
Schools · Castillejos · 2018 · M.V.GUBALLA CONSTRUCTION CORPORATION
₱1.9MCompleted · 100%
Widening-tertiary roads, Subic-philseco road - k0141+(-462) - k0141+310, K0141+374 - k0141+940, K0142+214 - k0142+500
Roads and bridges · Subic · 2018 · ORANI CONSTRUCTION AND SUPPLY CORPORATION
₱46.1MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems. dredging of wawandue river mouth
Flood control · Subic · 2018 · THREE W BUILDERS, INC.
₱19.1MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems, Improvement of sacatihan river
Flood control · Subic · 2018 · E.R. DELA CRUZ CONSTRUCTION & SUPPLY
₱27.9MCompleted · 100%
Const. of multi-purpose bldg., Sta. maria elem. school (covered court), Sta. maria
Schools · Castillejos · 2018 · M.V.GUBALLA CONSTRUCTION CORPORATION
₱3.4MCompleted · 100%
Const. of multi-purpose bldg. linusungan elem. school (covered court), Linusungan
Schools · San Marcelino · 2018 · MICKAJETTE CONSTRUCTION AND TRADING
₱1.9MCompleted · 100%
Const. of multi-purpose bldg. muslim area (covered court), Calapacuan
Buildings · Subic · 2018 · RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION
₱1.9MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems, Improvement of sta. fe river
Flood control · San Marcelino · 2018 · ORANI CONSTRUCTION AND SUPPLY CORPORATION
₱46.3MCompleted · 100%
Const./maintenance of flood mitigation structures and drainage systems, Improvement of pamatawan river (looc section)
Flood control · Castillejos · 2018 · REPOLMAN CONSTRUCTION CORP. / THREE W BUILDERS, INC.
₱47.1MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
STO. CRISTO CONSTRUCTION & TRADING INC.120 projects · ₱5.51B
2
MICKAJETTE CONSTRUCTION AND TRADING104 projects · ₱938.0M
3
REPOLMAN CONSTRUCTION CORP.75 projects · ₱2.21B
4
KAEE CONSTRUCTION SERVICES58 projects · ₱593.2M
5
CDC CONSTRUCTION & SUPPLIES57 projects · ₱1.93B