Dumalneg: Government

Municipality in Ilocos Norte, Ilocos, Luzon · 4 barangays

National projects

Built by DPWH in Dumalneg since 2016.

119projects
₱5.53Bin all
35ongoing
3slow
  • Roads and bridges ₱3.83B
  • Flood control ₱1.63B
  • Buildings ₱51.7M
  • Water ₱13.2M
  • Schools ₱5.6M

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Dumalneg since 2016.

1
BLUE MOUNTAIN BUILDERS & GENERAL MDSE.(FOR. BLUE M31 projects · ₱636.1M
2
FR ESPIRITU BUILDERS AND DEVELOPMENT CORP.18 projects · ₱464.2M
3
11-16 CONSTRUCTION11 projects · ₱210.4M
4
MARAPAO-EVANGELISTA, ARCHITECT, ENGINEERS, BUILDERS7 projects · ₱33.2M
5
ALPHATEC CHEMICAL CORPORATION6 projects · ₱320.9M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →