Official seal of Laoag City

Laoag City: Government

City in Ilocos Norte, Ilocos, Luzon · 80 barangays

National projects

Built by DPWH in Laoag City since 2016.

730projects
₱11.67Bin all
281ongoing
22slow
  • Roads and bridges ₱5.46B
  • Flood control ₱3.27B
  • Buildings ₱2.12B
  • Schools ₱748.5M
  • Other ₱33.8M
  • Water ₱31.1M

Showing 241 to 270 of 421

Rehabilitation of mpb, Brgy. 23 san matias Buildings · 2018 · ABEIAN CONSTRUCTION
₱758KCompleted · 100%
Rehabilitation of mpb, Brgy. bengcag Buildings · 2018 · TMT CONSTRUCTION
₱857KCompleted · 100%
Const. of mangato araniw fc, Highway drainage system of mangato bridge along balacad nsr Flood control · 2018 · JCA CONSTRUCTION AND CONSTRUCTION SUPPLY / WERR CORPORATION INTERNATIONAL
₱37.7MCompleted · 100%
Rehab. of mpb, Brgy. 22 san andres Buildings · 2018 · TMT CONSTRUCTION
₱688KCompleted · 100%
Rehab. of mpb, Brgy. 38-a mangato east Buildings · 2018 · ABEIAN CONSTRUCTION
₱763KCompleted · 100%
₱650KCompleted · 100%
Conc. of road, Brgy. 42, Apaya Roads and bridges · 2018 · JCA CONSTRUCTION AND CONSTRUCTION SUPPLY
₱291KCompleted · 100%
Construction of flood control structures along bongo river, Brgy. poblacion, Municipality of sarrat Flood control · 2018 · SKYLINE CONSTRUCTION, EQUIPMENT AND DEVELOPMENT CORPORATION
₱23.3MCompleted · 100%
Rehabilitation of mpb, Brgy. 21, San pedro Buildings · 2018 · NORTHLANDER CONSTRUCTION
₱788KCompleted · 100%
₱37.6MCompleted · 100%
Rehab. of mpb, Brgy. 48-a cabungaan north Buildings · 2018 · SHAWIN KONSTRAK CONSTRUCTION AND CONSTRUCTION SUPPLY
₱650KCompleted · 100%
Rehab. of mpb, Brgy. 61 cataban Buildings · 2018 · NORTHLANDER CONSTRUCTION
₱808KCompleted · 100%
Rehab. of mpb, Brgy. 48-b cabungaan south Buildings · 2018 · ACCV BUILDERS
₱768KCompleted · 100%
Rehab. of mpb, Brgy. 44 zamboanga Buildings · 2018 · SHAWIN KONSTRAK CONSTRUCTION AND CONSTRUCTION SUPPLY
₱657KCompleted · 100%
Rehab. of mpb, Brgy. 45 tangid Buildings · 2018 · REMIGIO GENERAL CONSTRUCTION
₱771KCompleted · 100%
Rehab. of mpb, Brgy. 38-b mangato Buildings · 2018 · GESAVILE CONSTRUCTION
₱758KCompleted · 100%
Conc. of road, Brgy. barit Roads and bridges · 2018 · REMAR CONSTRUCTION
₱836KCompleted · 100%
Const. of slope protection, Brgy. 32-a la paz Flood control · 2018 · TMT CONSTRUCTION
₱847KCompleted · 100%
Conc. of road, Brgy. 37 calayab Roads and bridges · 2018 · GESAVILE CONSTRUCTION
₱747KCompleted · 100%
Const. of canal lining, Brgy. 2 sta. joaquina Flood control · 2018 · SHAWIN KONSTRAK CONSTRUCTION AND CONSTRUCTION SUPPLY
₱768KCompleted · 100%
₱8.9MCompleted · 100%
Rehab. of mpb, Gabu sur Buildings · 2018 · TMT CONSTRUCTION
₱749KCompleted · 100%
Rehab. of mpb, Brgy. 29, Sto. tomas Buildings · 2018 · TMT CONSTRUCTION
₱652KCompleted · 100%
Rehabilitation of mpb brgy. 53, Rioeng Buildings · 2018 · SHAWIN KONSTRAK CONSTRUCTION AND CONSTRUCTION SUPPLY
₱743KCompleted · 100%
Rehab. of mpb, Brgy. 36 araniw Buildings · 2018 · NOSIDE CONSTRUCTION
₱758KCompleted · 100%
Rehab. of mpb, Brgy. 26, San marcelino Buildings · 2018 · REMAR CONSTRUCTION
₱837KCompleted · 100%
Const. of slope protection, Brgy. 56-b bacsil south Flood control · 2018 · VIKING CONSTRUCTION & SUPPLIES
₱666KCompleted · 100%
Rehab. of mpb, Brgy. 43 cavit Buildings · 2018 · JCA CONSTRUCTION AND CONSTRUCTION SUPPLY
₱660KCompleted · 100%
Const. of canal lining, Brgy. 10 san jose Flood control · 2018 · REMIGIO GENERAL CONSTRUCTION
₱729KCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Laoag City since 2016.

1
BJMJB CONSTRUCTION & SUPPLY87 projects · ₱1.04B
2
JC-08 BUILDERS CORPORATION61 projects · ₱296.5M
3
MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY33 projects · ₱431.2M
4
TMT CONSTRUCTION32 projects · ₱66.8M
5
ACCV BUILDERS30 projects · ₱36.6M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →