Nueva Era: Government

Municipality in Ilocos Norte, Ilocos, Luzon · 11 barangays

National projects

Built by DPWH in Nueva Era since 2016.

175projects
₱8.67Bin all
11ongoing
3slow
  • Roads and bridges ₱4.74B
  • Flood control ₱3.64B
  • Buildings ₱178.1M
  • Schools ₱109.6M
  • Water ₱3.3M
Construction of multi-purpose building, Brgy. garnaden, Nueva ilocos norte Buildings · 2025 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱4.8MOn-Going · 16%
Construction of multi-purpose building, Brgy. cabittauran Buildings · 2025 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱4.8MOn-Going · 15%
Construction of multi-purpose building (barangay health center) brgy. acnam Buildings · 2025 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱4.8MOn-Going · 12%
Construction of missing links/ new roads, Jct ilocos norte abra road - nueva era - tineg road Roads and bridges · 2025 · ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
₱46.8MOn-Going · 2%
Repair/rehabilitation of flood control project along uguis river (section 8), Brgy. uguis Flood control · 2024 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱12.1MOn-Going · 100%
Construction of missing links/ new roads - jct ilocos norte abra road - nueva era - tineg road Roads and bridges · 2024 · ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.
₱14.2MOn-Going · 16%Slow
Construction/maintenance of flood mitigation structures and drainage systems, Construction of sabo dam along madongan river Flood control · 2024 · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
₱106.1MOn-Going · 67%
Construction of multi-purpose building, Barangay barikir Buildings · 2024 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱4.9MOn-Going · 34%Slow
Construction of multi-purpose building, Barangay caray Buildings · 2024 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱4.9MOn-Going · 42%Slow
Construction of multi-purpose building (covered court) barangay barikir Buildings · 2024 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱4.9MOn-Going · 68%
Construction of small river impounding project (srip) at papa river, Brgy. sto. niño Flood control · 2019 · TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC
₱533.8MOn-Going · 94%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Nueva Era since 2016.

1
JLP CONSTRUCTION & SUPPLY29 projects · ₱251.6M
2
ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)21 projects · ₱780.7M
3
PHESCO, INCORPORATED15 projects · ₱2.51B
4
ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)15 projects · ₱504.2M
5
GACUTAN CONSTRUCTION INC.14 projects · ₱343.2M