Town hall contracts
907projects
₱1.97Bin all
- Flood control ₱646.3M
- Roads and bridges ₱612.7M
- Buildings ₱353.0M
- Other ₱281.4M
- Water ₱57.8M
- Schools ₱18.0M
Showing 391 to 420 of 907
Rehabilitation of fmr (arnais section) - bagbagotot
Roads and bridges · 2019 · TFG CONSTRUCTION AND SUPPLIES
₱988K
Construction of 5-m river control (alallin-lag ang sections), Naguimba
Flood control · 2019 · TFG CONSTRUCTION AND SUPPLIES
₱989K
Rehabilitation of fmr - bagbag, Bagbagotot
Roads and bridges · 2019 · TFG CONSTRUCTION AND SUPPLIES
₱2.0M
Construction of river control (river re-channeling) - (las ud to covered court, Dangpalan to aling sections) naguimba
Flood control · 2019 · LINEAR CONSTRUCTION CORPORATION
₱4.9M
Construction of river control - (litaoan) elefante
Flood control · 2019 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱990K
Construction of river control (gabion type) - (baoit section) poblacion
Flood control · 2019 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱997K
Construction of flood control (gabion type) - luis section, Poblacion
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱998K
Construction of 150-m river control - (sanchez) casilagan sur
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱2.0M
Construction of river control - (peralta section) casilagan sur
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱2.0M
Construction of river control - (virginia section) casilagan sur
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱2.0M
Construction of river control - (fermin section) casilagan norte
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱2.0M
Construction of flood control (gabion type) - magsi section, Poblacion
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱2.1M
Construction of river control (gabion type) - (jara section) poblacion
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱2.1M
Construction of flood control (gabion type) - casilagan norte
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱2.8M
Construction of 150-m river control - (tabon-gagno sec) casilagan norte
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱3.0M
Construction of river control - pila
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱3.0M
Construction of river control (gabion type)-cadanglaan
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱3.0M
Construction of river control (river rechanneling) - (binayugan) lintic
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱5.0M
River re-channeling/deepening -municipal wide
Flood control · 2019 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱14.3M
Construction of 70-m river control (adame-galimba section)-casilagan norte
Flood control · 2019 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱1.5M
Construction of river control (river re-channeling)-casilagan sur
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱2.0M
Construction of 100-m river control (roberto gines section)-casilagan norte
Flood control · 2019 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱2.0M
Construction of river control (gabion type)-vivencio section, Poblacion
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱2.5M
Construction of river control-casilagan sur
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱3.0M
Construction of river control (gabion type)-lintic
Flood control · 2019 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱4.0M
Construction of river control (river re-channeling)-cadanglaan
Flood control · 2019 · E. E. MADAYAG CONSTRUCTION
₱5.0M
Construction of bridge-bay-asan, Naguimba
Roads and bridges · 2018 · E. E. MADAYAG CONSTRUCTION
₱13.1M
Construction of slope protection (garnace-eswagen sec) naguimba
Flood control · 2018 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱971K
Construction of river control (gabion type), (oscar jose section) bisangol
Flood control · 2018 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱979K
Construction of river control (dangpalan), Elefante
Flood control · 2018 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱988K
Source: PhilGEPS award notices, from the BetterGov.ph open data (CC0).
Town hall papers
1
Budget and 20% development fundDILG Full Disclosure Policy portal
2
Audit reportsCommission on Audit