Official seal of Banayoyo

Banayoyo: Government

Municipality in Ilocos Sur, Ilocos, Luzon · 14 barangays

Town hall contracts

Construction contracts the town hall of Banayoyo awarded and posted on PhilGEPS.

907projects
₱1.97Bin all
  • Flood control ₱646.3M
  • Roads and bridges ₱612.7M
  • Buildings ₱353.0M
  • Other ₱281.4M
  • Water ₱57.8M
  • Schools ₱18.0M
All

Showing 121 to 150 of 907

Concreting of farm to market road -gambala section), Casilagan norte Roads and bridges · 2024 · CZMAC CONSTRUCTION SERVICES
₱1.5M
Construction of irrigation canal-phase 2-(ely section) banbanaal Flood control · 2024 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱1.5M
Construction of slope protection (madarang section) bisangol Flood control · 2024 · E. E. MADAYAG CONSTRUCTION
₱1.5M
Concreting of farm to market road -(lubnak section), Poblacion Roads and bridges · 2024 · CZMAC CONSTRUCTION SERVICES
₱2.0M
Construction of slope protection 0(garnace-gambon schedule), Lintic Flood control · 2024 · E. E. MADAYAG CONSTRUCTION
₱2.0M
Construction of slope protection-(bessang) elefante Flood control · 2024 · E. E. MADAYAG CONSTRUCTION
₱2.0M
Constructiobn of multi-purpose hall (covered court)- maagob-banbanaal Buildings · 2024 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱3.5M
Construction of curing barn Other · 2024 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱3.5M
Construction of biosecured & climate-controlled finisher operation facility-phase 1-lopez Buildings · 2024 · E. E. MADAYAG CONSTRUCTION
₱6.0M
Rehabilitation of irrigation system-guardia Water · 2024 · E. E. MADAYAG CONSTRUCTION
₱993K
Construction of slope protection-bagbagotot Flood control · 2024 · CZMAC CONSTRUCTION SERVICES
₱1.5M
Construction of atm booth (standard offsite atm)-poblacion Other · 2023 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱545K
Rehabilitation of flood control-lintic Flood control · 2023 · CZMAC CONSTRUCTION SERVICES
₱1.4M
Concreting of farm to market roiad-banbanaal Roads and bridges · 2023 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱1.5M
Construction of river control-cadanglaan Flood control · 2023 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱4.9M
Installation of solar lights Other · 2023 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱1.4M
Concreting of farm to market road-casilagan norte Roads and bridges · 2023 · E. E. MADAYAG CONSTRUCTION
₱4.0M
Construction of flood control (lintic-banbanaal) Flood control · 2023 · CZMAC CONSTRUCTION SERVICES
₱20.0M
Construction of multi-purpose hall-bay asan, Naguimba Buildings · 2023 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱3.0M
Construction of slope protection-guardia Flood control · 2023 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱957K
Construction of drainage canal (cipriano manzano section)-lintic Flood control · 2023 · CZMAC CONSTRUCTION SERVICES
₱2.0M
Rehabilitation of farm to market road-bisangol Roads and bridges · 2023 · CZMAC CONSTRUCTION SERVICES
₱2.0M
Construction of farmers' multi-purpose hall-phase 1 (casilagan norte) Buildings · 2023 · E. E. MADAYAG CONSTRUCTION
₱75.0M
Continuation of multi-purpose hall-guardia Buildings · 2023 · CZMAC CONSTRUCTION SERVICES
₱465K
Rehabilitation of multi-purpose hall-casilagan sur Buildings · 2023 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱740K
Rehabilitation of multi-purpose hall-pila Buildings · 2023 · CZMAC CONSTRUCTION SERVICES
₱744K
Construction of perimeter fence-poblacion (evacuation center) Buildings · 2023 · J.A. OLIVAR ENG'G DESIGN, CONSTRUCTION AND SUPPLIES
₱987K
Rehabilitation/widening of banbanaal-lopez farm to market road Roads and bridges · 2023 · CZMAC CONSTRUCTION SERVICES
₱2.5M
Construction of slope protection-montero Flood control · 2023 · CZMAC CONSTRUCTION SERVICES
₱957K
Construction of slope protection-immalog, Lintic Flood control · 2023 · CZMAC CONSTRUCTION SERVICES
₱957K

Source: PhilGEPS award notices, from the BetterGov.ph open data (CC0).

Town hall papers

Not every project is on PhilGEPS. These are the town's own reports.

1
Budget and 20% development fundDILG Full Disclosure Policy portal
2
Audit reportsCommission on Audit

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board.

Post on Talk →