National projects
7804projects
₱140.76Bin all
887ongoing
120slow
- Roads and bridges ₱68.40B
- Flood control ₱47.14B
- Buildings ₱15.72B
- Schools ₱7.54B
- Water ₱1.08B
- Other ₱879.5M
Showing 1141 to 1170 of 6,672
Construction of slope protection works along angalacan river, Coral
Flood control · Mapandan · 2023 · J.G. GARCIA CONSTRUCTION & SUPPLY
₱47.6MCompleted · 100%
Construction of multi-purpose building, Pangasinan; 2. construction of multi-purpose building (gym), Pangasinan; 3. construction of multi-purpose building (covered court), Torre
Buildings · Mangatarem · 2023 · AMP 723 CONSTRUCTION CORPORATION
₱28.2MCompleted · 100%
Rehabilitation / major repair of permanent bridges - sinucalan br. (b04565lz) along urdaneta jct - dagupan rd
Roads and bridges · Santa Barbara · 2023 · JEUSMACK BUILDERS & CONSTRUCTION SUPPLY
₱7.9MCompleted · 100%
Construction of riverbank protection, Barangay embarcadero
Flood control · Mangaldan · 2023 · BET CONSTRUCTION & SUPPLY
₱26.9MCompleted · 100%
Construction of riverbank protection, Pantal river, Dagupan city pangasinan
Flood control · Dagupan City · 2023 · BET CONSTRUCTION & SUPPLY
₱49.0MCompleted · 100%
Construction of riverbank protection, Brgy. poblacion
Flood control · Manaoag · 2023 · J.G. GARCIA CONSTRUCTION & SUPPLY
₱19.6MCompleted · 100%
Rehabilitation / major repair of permanent bridges - calvo br. (b02765lz) along carmen jct - bayambang - manat rd
Roads and bridges · Bayambang · 2023 · JEUSMACK BUILDERS & CONSTRUCTION SUPPLY
₱5.8MCompleted · 100%
Construction of riverbank protection, Brgy. lipit sur
Flood control · Manaoag · 2023 · J.G. GARCIA CONSTRUCTION & SUPPLY
₱29.4MCompleted · 100%
Construction of riverbank protection, Brgy. lipit norte
Flood control · Manaoag · 2023 · J.G. GARCIA CONSTRUCTION & SUPPLY
₱29.4MCompleted · 100%
Construction of slope protection works along ingalera river, Barangay dinalaoan
Flood control · Calasiao · 2023 · MANIMELDS CONSTRUCTION & IRON WORKS
₱19.0MCompleted · 100%
Construction of slope protection (phase i) at barangay dinalaoan
Flood control · Calasiao · 2023 · BALLESTEROS CONSTRUCTION AND SUPPLY
₱9.6MCompleted · 100%
Construction of slope protection works along caba creek, Barangay ilang
Flood control · San Carlos City · 2023 · LEZA CONSTRUCTION & SUPPLY
₱19.0MCompleted · 100%
Construction/ maintenance of flood mitigation structures and drainage systems, Construction of riverbank protection along sinucalan river, Barangay bacayao norte
Flood control · Dagupan City · 2023 · BET CONSTRUCTION & SUPPLY
₱106.2MCompleted · 100%
Construction of bridge, Mangcasuy - sta. maria
Roads and bridges · Binalonan · 2023 · BMK CONSTRUCTION CORPORATION / W.J.P. CONSTRUCTION AND SUPPLY
₱86.8MCompleted · 100%
Installation of road safety devices along a) urdaneta jct-dagupan rd- k0201+000-k0201+370, K0201+370-k0201+870, K0201+870-k0202+000, K0202+000-k0203+021, K0203+021-k0203+947, K0203+9
Roads and bridges · Santa Barbara · 2023 · PHILIPPINE CHEMSTEEL INDUSTRIES, INC.
₱193.0MCompleted · 100%
Concreting of zone 1 (with 20 barrel box culvert) and zone vi-b dulacac-balayang road fmr, Brgy. dulacac and brgy. balayang
Roads and bridges · Alaminos City · 2023 · JONIK TRADING & CONSTRUCTION
₱14.9MCompleted · 100%
Installation of road safety devices along a) calasiao old rd- k0204+000-k0204+725, K0204+741-k0205+000, K0205+000-k0205+108, K0205+120-k0206+000, K0206+000-k0207+000, K0207+000-k0207
Roads and bridges · Calasiao · 2023 · ROCK-WBL CONSTRUCTION CORP.
₱193.0MCompleted · 100%
Installation of road safety devices along a) urdaneta jct-dagupan rd- k0195+600-k0196+000, K0196+000-k0197+000, K0197+000-k0198+000, K0198+000-k0198+870, K0198+925-k0199+118, K0199+1
Roads and bridges · Mapandan · 2023 · PHILIPPINE CHEMSTEEL INDUSTRIES, INC.
₱192.9MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems, Construction of flood mitigation structures along bued river, Barangay anonang, Phase ii
Flood control · San Fabian · 2023 · BET CONSTRUCTION & SUPPLY
₱91.7MCompleted · 100%
Installation of road safety devices along a) judge jose de venecia sr. ave - k0207+(-711) - k0207+(-611), K0207+(-611) - k0207+000, K0207+000 - k0207+073, K0207+183 - k0207+374, K020
Roads and bridges · Mapandan · 2023 · PHILIPPINE CHEMSTEEL INDUSTRIES, INC.
₱193.0MCompleted · 100%
Concreting of brgy. nibaliw narvarte fmr, Brgy.nibaliw narvarte
Roads and bridges · San Fabian · 2023 · MIGHTYWAY CONSTRUCTION AND SUPPLY
₱5.0MCompleted · 100%
Constn/ rehab of water supply/ septage and sewerage/ rain water collector system, 4th legislative di
Water · Manaoag · 2023 · J.G. GARCIA CONSTRUCTION & SUPPLY
₱2.3MCompleted · 100%
Construction of additional extension office building, Dpwh pangasinan 4th deo, Tuliao
Buildings · Santa Barbara · 2023 · JEUSMACK BUILDERS & CONSTRUCTION SUPPLY
₱12.8MCompleted · 100%
Construction (completion) of multi-purpose building (barangay hall) at barangay ican
Buildings · Malasiqui · 2023 · MIGHTYWAY CONSTRUCTION AND SUPPLY
₱2.4MCompleted · 100%
Construction of missing links/ new roads - bolinao - dasol coastal road
Roads and bridges · Bani · 2023 · JASA GD 2000 CONSTRUCTION CORPORATION
₱101.3MCompleted · 100%
Construction (completion) of multi-purpose building, Barangay calbueg
Buildings · Malasiqui · 2023 · MIGHTYWAY CONSTRUCTION AND SUPPLY
₱4.4MCompleted · 100%
Improvement of road, Brgy. victoria & brgy.cabatuan, Alaminos city/brgy.calabeng-brgy.dacap sur, Bani/brgy.bacnit
Roads and bridges · Mabini · 2023 · CDC CONSTRUCTION & SUPPLIES
₱39.6MCompleted · 100%
Construction of multi-purpose building (daycare center) at barangay beleng
Buildings · Bayambang · 2023 · JEUSMACK BUILDERS & CONSTRUCTION SUPPLY
₱4.9MCompleted · 100%
Rehabilitation / major repair of bridge - barangobong br. 2 (b01992lz) along villasis - malasiqui - sn carlos rd
Roads and bridges · Malasiqui · 2023 · JEUSMACK BUILDERS & CONSTRUCTION SUPPLY
₱979KCompleted · 100%
Construction of by-pass and diversion roads, Villasis - sto. tomas bypass road
Roads and bridges · Santo Tomas · 2023 · M.G. LUALHATI CONSTRUCTION CORP.
₱82.0MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
BET CONSTRUCTION & SUPPLY404 projects · ₱10.19B
2
JONIK TRADING & CONSTRUCTION403 projects · ₱3.44B
3
ALCEL CONSTRUCTION402 projects · ₱5.97B
4
MIGHTYWAY CONSTRUCTION AND SUPPLY355 projects · ₱2.98B
5
J.G. GARCIA CONSTRUCTION & SUPPLY268 projects · ₱2.92B