Mangatarem: Government

Municipality in Pangasinan, Ilocos, Luzon · 82 barangays

Town hall contracts

Construction contracts the town hall of Mangatarem awarded and posted on PhilGEPS.

166projects
₱227.8Min all
  • Other ₱123.3M
  • Roads and bridges ₱54.0M
  • Buildings ₱27.3M
  • Flood control ₱15.8M
  • Water ₱5.5M
  • Schools ₱2.0M

The last construction award Mangatarem posted on PhilGEPS is from December 2024. A town has to post every award, so the list below is likely not all of its work. The town's own reports are in "Town hall papers".

All

Showing 151 to 166 of 166

Construction projects Other · 2013 · DELOS REYES CONSTRUCTION
₱1,000K
Construction projects Other · 2013 · DELOS REYES CONSTRUCTION
₱1,000K
Construction projects Other · 2013 · DELOS REYES CONSTRUCTION
₱1,000K
Construction projects Other · 2013 · EL FELIPE DESIGN AND CONSTRUCTION
₱1,000K
Construction projects Other · 2013 · EL FELIPE DESIGN AND CONSTRUCTION
₱1,000K
Construction projects Other · 2013 · EL FELIPE DESIGN AND CONSTRUCTION
₱1,000K
Construction projects Other · 2013 · EL FELIPE DESIGN AND CONSTRUCTION
₱1,000K
Construction projects Other · 2013 · EL FELIPE DESIGN AND CONSTRUCTION
₱5.0M
Construction projects Other · 2013 · EL FELIPE DESIGN AND CONSTRUCTION
₱5.6M
Concreting of farm-to-market road at brgy. naguilayan east Roads and bridges · 2013 · DELOS REYES CONSTRUCTION
₱815K
Construction projects Other · 2013 · DELOS REYES CONSTRUCTION
₱5.0M
Concreting of farm-to-market road the municipality of mangatarem Roads and bridges · 2013 · DELOS REYES CONSTRUCTION
₱2.3M
Construction projects Other · 2012 · DELOS REYES CONSTRUCTION
₱1.1M
Construction projects Other · 2012 · EL FELIPE DESIGN AND CONSTRUCTION
₱1.9M
Concreting of parking lot at the public market Roads and bridges · 2012 · DELOS REYES CONSTRUCTION
₱499K
Construction projects Other · 2012 · DELOS REYES CONSTRUCTION
₱4.0M

Source: PhilGEPS award notices, from the BetterGov.ph open data (CC0).

Town hall papers

Not every project is on PhilGEPS. These are the town's own reports.

1
Budget and 20% development fundDILG Full Disclosure Policy portal
2
Audit reportsCommission on Audit

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board.

Post on Talk →