San Nicolas: Government

Municipality in Pangasinan, Ilocos, Luzon · 33 barangays

National projects

Built by DPWH in San Nicolas since 2016.

211projects
₱6.45Bin all
31ongoing
9slow
  • Roads and bridges ₱4.59B
  • Flood control ₱1.02B
  • Buildings ₱708.5M
  • Schools ₱108.3M
  • Other ₱22.6M
  • Water ₱3.9M

Showing 181 to 210 of 211

Constn of dike w/ protection works, Ambayaoan rcp, Poblacion Flood control · 2017 · R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC.
₱19.5MCompleted · 100%
Restoration of dike w/ protection works, Ambayaoan rcp, Brgy. san rafael Flood control · 2017 · R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC.
₱14.7MCompleted · 100%
Constn of dike w/ protection works, Sabangan rcp, San rafael centro Flood control · 2017 · JHI CONSTRUCTION & SUPPLY
₱9.8MCompleted · 100%
Rehab of dike w/ protection works, Ambayaoan rcp, Brgy. lungao Flood control · 2017 · JHI CONSTRUCTION & SUPPLY
₱4.7MCompleted · 100%
Replacement of permanent weak bridges at primicias bridge i Roads and bridges · 2017 · ALPHIN TRADING & CONSTRUCTION
₱5.6MCompleted · 100%
Expansion of brgy health station-birthing at dalumpinas bhs Buildings · 2016 · AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION
₱918KCompleted · 100%
Constn of two (2) storey six (6) cl sb at san rafael e/s Buildings · 2016 · W.J.P. CONSTRUCTION AND SUPPLY
₱7.9MCompleted · 100%
Constn of one stry one cl sb w/ toilet attached at cabayawasan e/s, Pang Buildings · 2016 · W.J.P. CONSTRUCTION AND SUPPLY
₱1.2MCompleted · 100%
Constn of one stry one cl sb w/ toilet attached at kulangew e/s Buildings · 2016 · W.J.P. CONSTRUCTION AND SUPPLY
₱1.2MCompleted · 100%
Constn of two (2) stry four (4) cl sb at san isidro nhs Buildings · 2016 · 2-R CONSTRUCTION AND SUPPLY
₱6.0MCompleted · 100%
Constn/maint of flood mitigation structures & drainage systems-agno river basin & allied rivers floo Flood control · 2016 · AMP 723 CONSTRUCTION CORPORATION / C.D.J. BUILDERS & CONSTRUCTION SUPPLIES
₱47.6MCompleted · 100%
Replacement of permanent weak bridges at primicias bridge i Roads and bridges · 2017 · ALPHIN TRADING & CONSTRUCTION
₱7.1MCompleted · 100%
₱144.7MCompleted · 100%
₱83.0MCompleted · 100%
Constn of technical-vocational (tvl) at san isidro nhs Buildings · 2016 · JHI CONSTRUCTION & SUPPLY
₱2.4MCompleted · 100%
Concreting of camanggaan fmr, Brgy. camanggaan Roads and bridges · 2016 · JHI CONSTRUCTION & SUPPLY
₱1.9MCompleted · 100%
₱1.8MCompleted · 100%
Constn of two stry four cl sb at cacabogaoan nhs Buildings · 2016 · ROGENOX CONSTRUCTION AND SUPPLY CORP.
₱6.3MCompleted · 100%
Constn of four stry eight cl sb at san nicolas nhs Buildings · 2016 · AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION
₱14.7MCompleted · 100%
Constn of two stry four cl sb at malico nhs Buildings · 2016 · MKM MARKETING
₱6.4MCompleted · 100%
Constn of two stry four cl sb at sto. tomas nhs Buildings · 2016 · 2-R CONSTRUCTION AND SUPPLY
₱6.3MCompleted · 100%
Constn of two stry four cl sb at east central school Schools · 2016 · 2-R CONSTRUCTION AND SUPPLY
₱6.3MCompleted · 100%
Constn of three stry nine cl sb at san felipe i/s Buildings · 2016 · AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION
₱15.0MCompleted · 100%
Constn of two stry four cl sb at dalumpinan nhs Buildings · 2016 · AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION
₱6.3MCompleted · 100%
₱9.4MCompleted · 100%
Const/maint of flood mitigation structures & drainage system-agno river basin flood ctrl proj-const Flood control · 2016 · KENWOOD CONSTRUCTION ENTERPRISES CORPORATION / W.J.P. CONSTRUCTION AND SUPPLY
₱14.0MCompleted · 100%
₱0For Procurement · 0%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in San Nicolas since 2016.

1
AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION28 projects · ₱828.6M
2
RIVBROS CONSTRUCTION FACTORS & DEVELOPMENT24 projects · ₱233.5M
3
DMGR BUILDERS21 projects · ₱219.5M
4
ROGENOX CONSTRUCTION AND SUPPLY CORP.12 projects · ₱157.9M
5
R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC.11 projects · ₱146.5M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →