Official seal of Abra De Ilog

Abra De Ilog: Government

Municipality in Occidental Mindoro, Mimaropa, Luzon · 10 barangays

National projects

Built by DPWH in Abra De Ilog since 2016.

114projects
₱5.26Bin all
15ongoing
0slow
  • Roads and bridges ₱3.07B
  • Flood control ₱1.88B
  • Other ₱188.9M
  • Buildings ₱62.3M
  • Schools ₱47.3M
  • Water ₱4.2M

Showing 1 to 30 of 81

Widening of mindoro west coastal rd (section 7) (s00121mr) - k0437+ 658 - k0438 + 050 Roads and bridges · 2025 · KGB ENGINEERING AND CONSTRUCTION
₱10.0MCompleted · 100%
₱17.5MCompleted · 100%
Widening of mindoro west coastal rd (section 7) (s00121mr) - k0438+ 281 - k0439 + 180 Roads and bridges · 2025 · KGB ENGINEERING AND CONSTRUCTION
₱22.8MCompleted · 100%
Construction of road, Cabacao Roads and bridges · 2025 · KGB ENGINEERING AND CONSTRUCTION
₱9.6MCompleted · 100%
₱14.9MCompleted · 100%
Construction of flood control structure, Aluyan river, So. aluyan, Barangay tibag Flood control · 2024 · SIXTEEN ENTERPRISES-CALAPAN BRANCH
₱19.5MCompleted · 100%
Construction of flood control structures along mamara river, Bagong silang section Flood control · 2024 · SIXTEEN ENTERPRISES-CALAPAN BRANCH
₱38.0MCompleted · 100%
₱39.0MCompleted · 100%
Construction of multi-purpose building, Barangay armado Buildings · 2024 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱4.9MCompleted · 100%
Construction/improvement of access roads leading to luyang baga cave Roads and bridges · 2024 · KGB ENGINEERING AND CONSTRUCTION
₱14.7MCompleted · 100%
Construction of multi-purpose building, Barangay san vicente Buildings · 2024 · KGB ENGINEERING AND CONSTRUCTION
₱4.9MCompleted · 100%
₱6.8MCompleted · 100%
₱19.4MCompleted · 100%
₱96.5MCompleted · 100%
Const. of slope protection structure along apyas-mananao apyas section, Occ. mindoro Flood control · 2023 · GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914) / LQG TRADING AND CONSTRUCTION
₱96.5MCompleted · 100%
₱96.5MCompleted · 100%
₱96.5MCompleted · 100%
₱101.3MCompleted · 100%
₱101.3MCompleted · 100%
Construction/improvement of access roads leading to declared tourism destinations, Luyang baga cave Roads and bridges · 2023 · NEW MINDORENOS LUMBER, HARDWARE AND GEN MERCHANDISE
₱9.8MCompleted · 100%
Replacement of permanent weak bridges - orilan br. 1 (b00137mr) along mindoro west coastal rd Roads and bridges · 2022 · ASIANSTAR CONSTRUCTION & SUPPLY CORPORATION
₱14.5MCompleted · 100%
Construction of flood control structure, Cabacao Flood control · 2022 · JUAN ANTONIO CONSTRUCTION
₱7.1MCompleted · 100%
Construction of concrete road - access road leading to luyang baga cave Roads and bridges · 2022 · ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 31762)
₱48.4MCompleted · 100%
Construction of concrete road - abra de ilog bypass road, Occiental mindoro Roads and bridges · 2022 · 1129 BUILDERS / SYNDTITE CONSTRUCTION CORPORATION
₱65.3MCompleted · 100%
Construction of road drainage canal in abra de ilog Flood control · 2022 · R.S. TAGALA CONSTRUCTION AND EQUIPMENT RENTALS / SIXTEEN ENTERPRISES-CALAPAN BRANCH
₱69.3MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

Who builds here

Contractors with the most projects in Abra De Ilog since 2016.

1
KGB ENGINEERING AND CONSTRUCTION12 projects · ₱158.1M
2
HGG BUILDERS & SUPPLY6 projects · ₱430.1M
3
F.A. TORRES CONSTRUCTION6 projects · ₱124.4M
4
SYNDTITE CONSTRUCTION CORPORATION5 projects · ₱165.0M
5
J.H.R. ENTERPRISES5 projects · ₱100.0M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →