San Fernando: Government
Municipality in Romblon, Mimaropa, Luzon · 12 barangays
We get these projects from the DPWH Transparency Portal. The totals are our own sums of what DPWH reports, so they are only as right as DPWH's data. We refresh it every 7 days. If something looks off, open the project on DPWH's site and check.
Synced with DPWH · next check Sun 1 Nov
National projects
54projects
₱1.86Bin all
8ongoing
0slow
- Flood control ₱1.22B
- Roads and bridges ₱268.3M
- Buildings ₱200.5M
- Other ₱93.3M
- Water ₱43.7M
- Schools ₱41.8M
Completion of multi-purpose building at campalingo elementary school
Schools · 2025 · MT. GUITING-GUITING CONSTRUCTION
₱2.0MCompleted · 100%
Construction of multi-purpose building at barangay taclobo
Buildings · 2025 · MT. GUITING-GUITING CONSTRUCTION
₱4.9MOn-Going · 84%
Construction of flood control structure, Sitio cabitangahan barangay taclobo
Flood control · 2025 · SUNWEST, INC.
₱145.5MOn-Going · 100%
Construction of flood control structure, Barangay cantingas
Flood control · 2025 · SUNWEST, INC.
₱145.5MOn-Going · 93%
Construction of campalingo flood control structure along sibuyan circumferential road, Phase 2, Brgy. campalingo
Flood control · 2025 · MT. GUITING-GUITING CONSTRUCTION
₱27.1MOn-Going · 100%
Construction of pili flood control structure phase 2, Barangay pili
Flood control · 2025 · SCATR CONSTRUCTION
₱141.0MOn-Going · 90%
Const./rehab. of flood mitigation facilities within major river basins and principal rivers- const. of pili riverside protection structure, Downstream, Poblacion
Flood control · 2025 · YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. ([REVOKED] 45002)
₱144.7MOn-Going · 94%
Const. of riverside protection structure, Downstream, Brgy. punong
Flood control · 2025 · YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. ([REVOKED] 45002)
₱229.8MOn-Going · 88%
Construction of multipurpose building including its solar powered system and desalination
Buildings · 2023 · SCHEIRMAN CONSTRUCTION CONSOLIDATED INC.
₱97.2MOn-Going · 0%
Improvement of cantingas ris drainage system
Flood control · 2024 · R.G. FLORENTINO CONST. & TRADING INC.
₱19.6MCompleted · 100%
Construction of road, Barangay taclobo, San fernando-phase ii, Taclobo
Roads and bridges · 2024 · R.G. FLORENTINO CONST. & TRADING INC.
₱9.9MCompleted · 100%
Construction of 1sty2cl, Armin rios-marin national high school
Schools · 2023 · MT. GUITING-GUITING CONSTRUCTION
₱4.1MCompleted · 100%
Construction of multi-purpose building at campalingo elementary school
Schools · 2023 · MT. GUITING-GUITING CONSTRUCTION
₱4.9MCompleted · 100%
Construction of campalingo flood control structure along sibuyan circumferential road (upstream & downstream), Sta. 00+080 - sta. 00+150, Sta. 00+158 - sta. 00+240 at ds (r/s), Sta. 00+320 - sta. 00+365, Sta. 00+375 - sta. 00+420 at us (r/s), Sta. 00+320
Flood control · 2023 · ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR
₱50.7MCompleted · 100%
Construction (completion) of multi-purpose building, Barangay agtiwa
Buildings · 2023 · MT. GUITING-GUITING CONSTRUCTION
₱1.9MCompleted · 100%
Const. of espana flood control structure (phase 2), Brgy. espana, Sta. 0+000-sta. 0+213 (bs)
Flood control · 2022 · LEGACY CONSTRUCTION CORPORATION
₱74.2MCompleted · 100%
Construction of access road, Barangay taclobo, Sta. 00+000.00 - sta 00+350.50
Roads and bridges · 2022 · R.G. FLORENTINO CONST. & TRADING INC.
₱9.7MCompleted · 100%
Construction (completion) of multi-purpose building, Barangay panangcalan
Buildings · 2022 · MT. GUITING-GUITING CONSTRUCTION
₱1.9MCompleted · 100%
Construction of mabulo flood control structure (upstream), Sta. 0+600.00 - sta. 0+762.80 (l/s)
Flood control · 2022 · MT. GUITING-GUITING CONSTRUCTION
₱24.5MCompleted · 100%
Construction of panangcalan flood control structure (downstream), Sta. 0+080.00 - sta. 0+160.00 (l/s), Sta. 0+080.00 - sta. 0+164.00 (r/s)
Flood control · 2022 · MGMP CORPORATION
₱24.3MCompleted · 100%
Construction of level iii water supply project
Water · 2021 · MT. GUITING-GUITING CONSTRUCTION
₱43.7MCompleted · 100%
Construction of multi-purpose building (multi-purpose hall) at barangay agtiwa
Buildings · 2021 · MT. GUITING-GUITING CONSTRUCTION
₱5.3MCompleted · 100%
Construction of multi - purpose building (multi - purpose hall) at barangay otod
Buildings · 2021 · R.G. FLORENTINO CONST. & TRADING INC.
₱4.9MCompleted · 100%
Construction of multi - purpose building (multi - purpose hall) at don carlos m. mejias memorial national high school
Schools · 2021 · MT. GUITING-GUITING CONSTRUCTION
₱2.9MCompleted · 100%
Replacement of permanent weak bridges - pili bridge (b00035sy) along sibuyan circumferential road
Roads and bridges · 2020 · THREE W BUILDERS, INC.
₱31.9MCompleted · 100%
Construction of shore protection/causeway, Poblacion
Other · 2020 · SUNWEST, INC.
₱93.3MCompleted · 100%
Const. of coastal road needing boulevard for tourism along espana, Sta. 0+000-sta. 0+210
Roads and bridges · 2020 · SUNWEST, INC.
₱95.6MCompleted · 100%
Construction of multi - purpose building, Brgy. azagra
Buildings · 2020 · LEGACY CONSTRUCTION CORPORATION
₱4.9MCompleted · 100%
Construction of olango flood control, Sta. 000 + 475.00 - sta. 000 + 735.00
Flood control · 2020 · LEGACY CONSTRUCTION CORPORATION
₱28.2MCompleted · 100%
Construction of evacuation center in barangay panangcalan
Buildings · 2019 · TWIN DRAGON CONSTRUCTION
₱34.0MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
Who builds here
1
MT. GUITING-GUITING CONSTRUCTION11 projects · ₱123.2M
2
LEGACY CONSTRUCTION CORPORATION10 projects · ₱291.8M
3
MGMP CORPORATION8 projects · ₱49.4M
4
ASHLEYKA CONSTRUCTION AND SUPPLIES CORP.6 projects · ₱25.0M
5
SUNWEST, INC.5 projects · ₱579.1M