National projects
2305projects
₱76.98Bin all
213ongoing
17slow
- Flood control ₱36.06B
- Buildings ₱15.50B
- Roads and bridges ₱15.11B
- Other ₱6.01B
- Schools ₱4.27B
- Water ₱42.4M
Showing 331 to 360 of 2,305
Construction of the nationalcenter for teacher education(ncte) building (formerly thepnu convention center andtraining center) - phase 2 -philippine normal univeristy
Buildings · 2024 · CALOOY CONSTRUCTION
₱14.7MOn-Going · 0%Slow
Construction of multi-purpose building at brgy. 775, Zone 84, Sagrada familia cor., Onyx sts., San andres
Buildings · 2024 · RCDG CONSTRUCTION CORPORATION
₱9.7MCompleted · 100%
Construction of other building establishment of the nbi facility (including civil works) of nbi building in taft avenue, Ermita
Buildings · 2023 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱28.3MOn-Going · 0%Slow
Rehabilitation (completion) of adb building, Ncr compound 2nd st., Port area
Buildings · 2024 · FORT KLAN CONSTRUCTION DEVELOPMENT INC.
₱6.7MCompleted · 100%
Const./maint. of flood mitigation structures and drainage systems-const. of slope protection at baseco compound, Port area, Brgy. 649, Zone 68, Phase 3, Sta 0+398 to s
Flood control · 2024 · ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.
₱96.4MCompleted · 100%
Construction of multi-purpose building, Barangay 855, Pandacan
Buildings · 2024 · N.M.E. CONSTRUCTION
₱4.8MCompleted · 100%
Construction of multi-purpose building at barangay 202-a zone 18 and barangay 214 zone 20
Buildings · 2024 · LQG TRADING AND CONSTRUCTION
₱4.9MCompleted · 100%
Retrofitting/strengthening of permanent bridges - quezon br. (b03195lz) along quezon blvd extn
Roads and bridges · 2024 · J.H. PAJARA CONSTRUCTION CORPORATION
₱149.6MOn-Going · 4%Slow
Preventive maintenance - tertiary roads - malacanang road network (s02706lz) chainage 0 - chainage 1051
Roads and bridges · 2024 · TRIPLE A&J CONSTRUCTION SERVICES
₱19.6MCompleted · 100%
Construction/maintenance of flood mitigation structures and drainage systems-construction of pumping station, Apacible street along estero de paco, Brgy 673
Flood control · 2024 · EIGHT J'S CONSTRUCTION SERVICES / JIM AND JEM CONSTRUCTION SERVICES
₱96.5MCompleted · 100%
Construction of multi-purpose building, Barangay 262, Zone 24, Manila 2. rehabilitation of multipurpose building at barangay 262, Zone 24, Manila city (phase ii)
Buildings · 2024 · MNJAP CONSTRUCTION SERVICES
₱9.9MCompleted · 100%
Construction/maintenance of flood mitigation structures & drainage systems-const. of drainage system, Laura st., (beata st. to menandro), Pandacan
Flood control · 2024 · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
₱39.2MCompleted · 100%
Const./maint. of flood mitigation structures & drainage systems-const. of slope protection at baseco compound, Port area, Sta.0+000 to sta.0+294.50, Phase 1
Flood control · 2024 · ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. / K84 CONSTRUCTION AND DEVELOPMENT CORPORATION
₱96.4MCompleted · 100%
Construction of multi-purpose building at barangay 168 zone 15 rotonda del fiero (phase ii)
Buildings · 2024 · GUILLAND CONSTRUCTION & TRADING
₱4.9MCompleted · 100%
Const./maint.of flood mitigation structures & drainage systems-const.of drainage system, Zone 91, Pandacan
Flood control · 2024 · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
₱24.5MCompleted · 100%
Rehabilitation of drainage system along malabon st.
Flood control · 2024 · AYLAN CONSTRUCTION & TRADING / E.M. CUERPO, INC.
₱98.4MCompleted · 100%
Preventive maintenance- tertiary roads-2nd street (from bonifacio drive to baseco area)
Roads and bridges · 2024 · 747 BUILDERS & TRADERS,INC.
₱24.5MCompleted · 100%
Construction of multi-purpose building (police station 10) phase ii, Pandacan
Buildings · 2024 · N.M.E. CONSTRUCTION
₱4.9MCompleted · 100%
Const./maint.of flood mitigation structures & drainage systems-rehabilitation of luneta pumping station at katigbak parkway, Ermita, Phase ii
Flood control · 2024 · EIGHT J'S CONSTRUCTION SERVICES
₱96.5MCompleted · 100%
Const./maint.of flood mitigation structures & drainage systems-const.of drainage system (box culvert) jesus st. ext. (sta.0+000 to sta.0+255), Pandacan
Flood control · 2024 · N.M.E. CONSTRUCTION
₱29.4MCompleted · 100%
Const./maint. of flood mitigation structures & drainage systems-const. of drainage system tejeron st., (phase ii)syquia st., To zobel roxas, Sta.ana
Flood control · 2024 · N.M.E. CONSTRUCTION
₱39.2MCompleted · 100%
Preventive maintenance- secondary roads- tm kalaw st. -from roxas blvd. to taft ave.
Roads and bridges · 2024 · ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
₱67.5MCompleted · 100%
Preventive maintenance- tertiary roads- p. faura st.-k0002 + (-445) - k0002 + 616
Roads and bridges · 2024 · 1129 BUILDERS
₱29.8MCompleted · 100%
Preventive maintenance-secondary roads-p. burgos street - k0001 + (-546.50) -k0001 + (-472.10), K0001 + 665 -k0001 + 805
Roads and bridges · 2024 · AARCON BUILDERS
₱11.3MCompleted · 100%
Construction of multi-purpose building at barangay 598, Zone 59, Sta. mesa
Buildings · 2024 · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129) / N.M.E. CONSTRUCTION
₱29.7MTerminated · 100%
Construction of retarding basin at estero dela reina (phase 13), Tondo
Other · 2024 · JJPR CONSTRUCTION SERVICES / JMRP CONSTRUCTION SERVICES
₱125.4MCompleted · 100%
Construction of multi-purpose building, Barangay 159 zone 14
Buildings · 2024 · THREE FRANCIS JAYDINE BUILDERS AND CONSTRUCTION CORP
₱4.9MCompleted · 100%
Rehabilitation of drainage system, Zone 1-12, Tondo
Flood control · 2024 · EIGHT J'S CONSTRUCTION SERVICES / MNJAP CONSTRUCTION SERVICES
₱96.2MCompleted · 100%
Rehabilitation /reconstruction / upgrading of damaged paved roads-secondary roads-roxas blvd - k0002 +457- k0002 + 585
Roads and bridges · 2024 · JMK BUILDERS CONSTRUCTION
₱14.7MCompleted · 100%
Const./ maint. of flood mitigation structures and drainage systems-rehab. of luneta pumping station at katigbak parkway, Ermita, Manila city-phase i
Flood control · 2024 · EIGHT J'S CONSTRUCTION SERVICES
₱96.5MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
FLORDES CONSTRUCTION & TRADING CORP.95 projects · ₱2.82B
2
EIGHT J'S CONSTRUCTION SERVICES73 projects · ₱5.03B
3
JMK BUILDERS CONSTRUCTION67 projects · ₱695.0M
4
JELSIE CONSTRUCTION & SUPPLY64 projects · ₱4.17B
5
N.M.E. CONSTRUCTION62 projects · ₱506.9M