National projects
2305projects
₱76.98Bin all
213ongoing
17slow
- Flood control ₱36.06B
- Buildings ₱15.50B
- Roads and bridges ₱15.11B
- Other ₱6.01B
- Schools ₱4.27B
- Water ₱42.4M
Showing 91 to 120 of 213
Improvement of road and drainage system along p. quirino ave from taft ave to adriatico st. (westbound)
Roads and bridges · 2025 · ANORE CONSTRUCTION
₱95.4MOn-Going · 48%
Retrofitting/strengthening of permanent bridges - san gregorio br. along sn gregorio st.
Roads and bridges · 2025 · ANORE CONSTRUCTION / K.A.L.I. CONSTRUCTION CORPORATION
₱94.5MOn-Going · 51%
Construction of road and drainage system along roxas boulevard service road
Flood control · 2025 · DMLC BUILDERS
₱47.3MOn-Going · 5%
Retrofitting/strengthening of permanent bridges-san marcelino br. (b02309lz) along sn marcelino st
Roads and bridges · 2025 · LE BRON CONSTRUCTION
₱71.4MOn-Going · 63%
Retrofitting/strengthening of permanent bridges - p. quirino br.1 (b02304lz) along pres. quirino ave.
Roads and bridges · 2025 · LE BRON CONSTRUCTION
₱71.6MOn-Going · 52%
Construction of multi-purpose building, Brgy 262, Zone 24, Tondo, District 2
Buildings · 2025 · TRIPLE A&J CONSTRUCTION SERVICES
₱14.6MOn-Going · 0%
Rehabilitation of rizal memorial sports complex
Buildings · 2024 · LE BRON CONSTRUCTION
₱194.7MOn-Going · 40%
Construction of multi - purpose building within zone 96 to 98, Santa ana
Buildings · 2025 · KPSL GENERAL CONTRACTOR INC. / M.C. LAYGO BUILDERS
₱48.4MOn-Going · 66%
Construction of isidro mendoza health center, Pandacan, Manila (phase ii)
Buildings · 2025 · 525 CONSTRUCTION / JOMATE CONSTRUCTION SERVICES
₱41.2MOn-Going · 85%
Const./maint. of flood mitigation structures & drainage systems-const. of slope protection structure along estero de balite, Phase 2
Flood control · 2025 · 11-16 CONSTRUCTION
₱71.6MOn-Going · 65%
Const./ maint. of flood mitigation structures & drainage systems/ const. of slope protection structure, Phase 4, Baseco compound, Port area
Flood control · 2025 · JELSIE CONSTRUCTION & SUPPLY
₱95.0MOn-Going · 79%
Rehabilitation of drainage system along g perfecto st.
Flood control · 2025 · ROAD EDGE TRADING & DEVELOPMENT SERVICES
₱75.5MOn-Going · 58%
Rehabilitation of drainage system along vitas st.
Flood control · 2025 · ROAD EDGE TRADING & DEVELOPMENT SERVICES
₱93.5MOn-Going · 78%
Rehabilitation of drainage along zone 58 - 67, Manila city (phase v)
Flood control · 2025 · G.F. FABIAN CONSTRUCTION
₱103.9MOn-Going · 43%
Construction of drainage along tayuman st.
Flood control · 2025 · SEJ CONSTRUCTION & AGGREGATES
₱80.1MOn-Going · 0%
Installation of solar led streetlights at a. rivera st. - c000.00 to c945.45, Tayuman st. - k0007 + (-562.60) to k0007 + 282 and hermosa st. - c000.00 to c622.83
Roads and bridges · 2025 · JIIK CONSTRUCTION SERVICES
₱94.6MOn-Going · 52%
Rehabilitation of multi-purpose building, Barangay 4 (phase ii), Tondo
Buildings · 2025 · JIM AND JEM CONSTRUCTION SERVICES
₱2.9MOn-Going · 43%
Rehabilitation of drainage system along dapitan st. manila city
Flood control · 2025 · G.F. FABIAN CONSTRUCTION
₱94.7MOn-Going · 100%
Preventive maintenance - tertiary roads - e quintos st - k0009 + 659 - k0010 + 580
Roads and bridges · 2025 · PHILIPPINE CHEMSTEEL INDUSTRIES, INC.
₱40.8MOn-Going · 10%
Rehabilitation of esteros within zone 25 - 40
Other · 2025 · JJPR CONSTRUCTION SERVICES
₱142.4MOn-Going · 78%
Installation of solar led streetlights at quiricada st. - chainage 0 to chainage 731.80, Tayuman st. - k0007 + 299.0 to k0008 + 000.00 and muelle dela industria st. - k0003 + (-375) to k0004 + 472
Roads and bridges · 2025 · AL-AMEN BUILDERS
₱94.9MOn-Going · 63%
Preventive maintenance - secondary roads - j. rizal ave. (s02407lz) k0004 + (268.1) - k0006 + 644.0
Roads and bridges · 2025 · JIIK CONSTRUCTION SERVICES
₱105.7MOn-Going · 100%
Preventive maintenance - secondary roads - quezon boulevard (s02554lz) k0003 + (-243.00) - k0003 + 069.80, K0003 + 069.80 - k0003 + 545.71
Roads and bridges · 2025 · JIIK CONSTRUCTION SERVICES
₱62.9MOn-Going · 84%
Installation of solar led streetlight within brgy. 649 to 828, Railroad st (chainage 0 - 855), Muralla st (chainage 0 - 1355), Gen luna s
Roads and bridges · 2025 · JIIK CONSTRUCTION SERVICES
₱143.1MOn-Going · 49%
Rehabilitation of multi-purpose building, Isidro mendoza health center, Phase ii, Barangay 848, Pandacan
Buildings · 2025 · 525 CONSTRUCTION / JOMATE CONSTRUCTION SERVICES
₱48.4MOn-Going · 94%
Construction of road and drainage (box culvert) at syquia st., Zone 96, 97
Roads and bridges · 2025 · TRIPLE 8 CONSTRUCTION & SUPPLY, INC.
₱29.1MOn-Going · 62%
Installation of solar street light along new panaderos st. from mandaluyong/manila boundary to f. calderon st.
Roads and bridges · 2025 · AL-AMEN BUILDERS
₱95.3MOn-Going · 27%
Const./maint. of flood mitigation structures & drainage systems-const. of slope protection structure, Phase 5, Baseco compound, Port area
Flood control · 2025 · JELSIE CONSTRUCTION & SUPPLY
₱143.0MOn-Going · 81%
Construction of j. abad santos general hospital (phase iii)
Buildings · 2025 · AYLAN CONSTRUCTION & TRADING / LE BRON CONSTRUCTION
₱47.4MOn-Going · 0%
Rehabilitation/ reconstruction/ upgrading of damaged paved roads - tertiary roads - improvement of road and drainage system along f. manalo st.
Flood control · 2025 · ANORE CONSTRUCTION
₱95.4MOn-Going · 52%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
FLORDES CONSTRUCTION & TRADING CORP.95 projects · ₱2.82B
2
EIGHT J'S CONSTRUCTION SERVICES73 projects · ₱5.03B
3
JMK BUILDERS CONSTRUCTION67 projects · ₱695.0M
4
JELSIE CONSTRUCTION & SUPPLY64 projects · ₱4.17B
5
N.M.E. CONSTRUCTION62 projects · ₱506.9M