Official seal of Manila

Manila: Government

City in Metro Manila, Luzon · 897 barangays

National projects

Built by DPWH in Manila since 2016.

2305projects
₱76.98Bin all
213ongoing
17slow
  • Flood control ₱36.06B
  • Buildings ₱15.50B
  • Roads and bridges ₱15.11B
  • Other ₱6.01B
  • Schools ₱4.27B
  • Water ₱42.4M

Showing 1231 to 1260 of 2,305

Rehabilitation of multi-purpose building, Zone 1-3, Barangay 1-47 Buildings · 2020 · J. SIMEON CONSTRUCTION
₱14.4MCompleted · 100%
Construction / maintenance of flood mitigation structures and drainage systems - bank improvement (steel sheet pile), Along estero de binondo, (rs) st Flood control · 2020 · RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION / ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
₱49.0MCompleted · 100%
Construction / maintenance of flood mitigation structures and drainage systems - bank improvement (steel sheet pile) along estero de binondo, (rs) sta Flood control · 2020 · EIGHT J'S CONSTRUCTION SERVICES / ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
₱49.0MCompleted · 100%
₱39.2MCompleted · 100%
₱46.6MCompleted · 100%
Rehabilitation of multi-purpose building, Zone 8-9, Barangay 91-123 Buildings · 2020 · EIGHT J'S CONSTRUCTION SERVICES
₱14.4MCompleted · 100%
Improvement (steel sheet pile) estero de uli - uli, Sta. 0+528.00 to sta. 0+560.00 Flood control · 2020 · RIMJ CONSTRUCTION SUPPLIES AND SERVICES
₱23.3MCompleted · 100%
Improvement along blumentritt extension, Chainage 0 - chainage 328.40 Flood control · 2020 · ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908)
₱18.5MCompleted · 100%
Construction of retention basin at estero de sampaloc Flood control · 2020 · AARCON BUILDERS
₱48.0MCompleted · 100%
Improvement (steel sheet pile), Estero de san sebastian sta. 0+000.0 to sta. 0+158.40 Flood control · 2020 · ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
₱49.0MCompleted · 100%
Improvement (steel sheet pile) estero de san miguel, Sta. 1+897.80 to sta. 1+989.00 Flood control · 2020 · FLORDES CONSTRUCTION & TRADING CORP.
₱29.8MCompleted · 100%
Rehabilitation / improvement of multi-purpose building, Zone 34, Brgy.343 Buildings · 2020 · SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.
₱34.6MCompleted · 100%
Rehabilitation of multi - purpose building, Brgy 636, Sta. mesa Buildings · 2020 · ALE BUILDERS CONSTRUCTION AND DEVELOPMENT CORP.
₱9.8MCompleted · 100%
Installation of pumping station (mini pump) at barangay 598 zone 59 Flood control · 2020 · FLORDES CONSTRUCTION & TRADING CORP.
₱50.5MCompleted · 100%
Improvement of multi - purpose facilities, Brgy. 617 Buildings · 2020 · ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
₱49.0MCompleted · 100%
₱39.6MCompleted · 100%
Construction of multi-purpose building (rizal covered court) Buildings · 2020 · PRECIOUS CONSTRUCTION
₱96.5MCompleted · 100%
₱19.8MCompleted · 100%
Rehabilitation of multi-purpose building, Zone 4-7, Barangay 48-90 Buildings · 2020 · GUILLAND CONSTRUCTION & TRADING
₱14.4MCompleted · 100%
Construction of retention basin at estero de valencia Flood control · 2020 · ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) / CALCON ENGINEERING
₱46.7MCompleted · 100%
₱9.6MCompleted · 100%
₱49.0MCompleted · 100%
Replacement of permanent bridge j. fajardo bridge, Brgy. 455 Roads and bridges · 2020 · FLORDES CONSTRUCTION & TRADING CORP.
₱35.1MCompleted · 100%
Improvement estero de uli-uli, Sta. 0+ 390.20 to sta. 0+459.00 (left) and sta. 0+388.20 to sta. 0+459.00 (right) Flood control · 2020 · ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
₱47.0MCompleted · 100%
₱25.3MCompleted · 100%
₱18.3MCompleted · 100%
₱39.2MCompleted · 100%
Improvement estero de uli-uli, Sta. 0+ 459.00 to sta. 0+528.20 Flood control · 2020 · ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)
₱46.9MCompleted · 100%
₱49.0MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Manila since 2016.

1
FLORDES CONSTRUCTION & TRADING CORP.95 projects · ₱2.82B
2
EIGHT J'S CONSTRUCTION SERVICES73 projects · ₱5.03B
3
JMK BUILDERS CONSTRUCTION67 projects · ₱695.0M
4
JELSIE CONSTRUCTION & SUPPLY64 projects · ₱4.17B
5
N.M.E. CONSTRUCTION62 projects · ₱506.9M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →