City in Metro Manila, Luzon · 897 barangays

National projects

Built by DPWH in Manila since 2016.

2305projects
₱76.98Bin all
213ongoing
17slow
  • Flood control ₱36.06B
  • Buildings ₱15.50B
  • Roads and bridges ₱15.11B
  • Other ₱6.01B
  • Schools ₱4.27B
  • Water ₱42.4M

Showing 241 to 270 of 1,976

Installation of booster pump at estero dela reina (package 1a), Binondo Flood control · 2024 · JJPR CONSTRUCTION SERVICES
₱144.7MCompleted · 100%
Rehabilitation of road, Along yuseco st. tondo Roads and bridges · 2024 · TJR CONSTRUCTION CORPORATION
₱9.8MCompleted · 100%
₱64.2MCompleted · 100%
Construction of flood mitigation structure along estero dela reina, Barangay 268 Flood control · 2024 · DOUBLE 12 CONSTRUCTION & SUPPLY
₱67.3MCompleted · 100%
Construction of multi-purpose building, Barangay 393 Buildings · 2024 · TRILEX BUILDERS AND CONSTRUCTION SUPPLY INC.
₱49.5MCompleted · 100%
Installation of booster pump in cm recto ave., (phase i), Tondo Flood control · 2024 · JELSIE CONSTRUCTION & SUPPLY
₱96.4MCompleted · 100%
Installation of booster pump at estero de binondo (package 1a) Flood control · 2024 · JJPR CONSTRUCTION SERVICES
₱144.7MCompleted · 100%
Preventive maintenance - tertiary roads - moriones - k0004 + 392.20 - k0005 + 059.00 Roads and bridges · 2024 · TJR CONSTRUCTION CORPORATION
₱22.5MCompleted · 100%
₱72.4MCompleted · 100%
Installation of booster pump at estero de quiapo (package 1a) Flood control · 2024 · JIIK CONSTRUCTION SERVICES
₱144.7MCompleted · 100%
Construction of drainage system along earnshaw st. crossing ah lacson ave. Flood control · 2024 · RAICON DEVELOPMENT CORPORATION
₱29.4MCompleted · 100%
Installation of booster pump along estero dela reina, Barangay 9, (phase vi) tondo Flood control · 2024 · GOLDEN J'S CONSTRUCTION SERVICES
₱94.3MCompleted · 100%
Construction of retention basin along estero de sampaloc phase vii Flood control · 2024 · JELSIE CONSTRUCTION & SUPPLY
₱90.3MCompleted · 100%
Rehabilitation / major repair of permanent bridges - dimasalang br. (b01820lz) along dimasalang st Roads and bridges · 2024 · F316 CONSTRUCTION CORP. / G.F. FABIAN CONSTRUCTION
₱66.0MCompleted · 100%
Retrofitting / strengthening of permanent bridges - m roxas jr. br. (b03353lz) along m roxas jr bridge Roads and bridges · 2024 · ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)
₱49.0MCompleted · 100%
Rehabilitation / major repair of permanent bridges - legarda fly - over (b03350lz) along legarda flyover Roads and bridges · 2024 · F316 CONSTRUCTION CORP. / G.F. FABIAN CONSTRUCTION
₱115.0MCompleted · 100%
Rehabilitation of drainage system at zone 41-57 (phase 4) Flood control · 2024 · RAICON DEVELOPMENT CORPORATION
₱39.2MCompleted · 100%
Installation of booster pump along estero dela reina, Barangay 9, (phase vii) tondo Flood control · 2024 · GOLDEN J'S CONSTRUCTION SERVICES
₱95.3MCompleted · 100%
Preventive maintenance - secondary roads -españa blvd - k0005 + 070.60 - k0005 + 476 Roads and bridges · 2024 · PHILIPPINE CHEMSTEEL INDUSTRIES, INC.
₱26.9MCompleted · 100%
Construction of multipurpose building at barangay 392 Buildings · 2024 · JFR CONSTRUCTION INC.
₱4.9MCompleted · 100%
Improvement of road along f. hidalgo st., Quezon blvd to bilibid viejo, Barangay 393 Roads and bridges · 2024 · WAY MAKER GENERAL CONTRACTOR OPC ([REVOKED] 52351)
₱19.8MCompleted · 100%
₱4.9MCompleted · 100%
Construction of multi - purpose building, Phase ii, Barangay 636, Sta. mesa Buildings · 2024 · ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.
₱39.6MCompleted · 100%
Construction of drainage along anonas st. Flood control · 2024 · G.F. FABIAN CONSTRUCTION
₱67.2MCompleted · 100%
₱48.9MCompleted · 100%
Construction of drainage system along morong street Flood control · 2024 · AL-AMEN BUILDERS
₱49.0MCompleted · 100%
Preventive maintenance - tertiary roads - vg cruz - k0006 + (-218.80) - k0006 + 157 Roads and bridges · 2024 · PHILIPPINE CHEMSTEEL INDUSTRIES, INC.
₱20.1MCompleted · 100%
₱144.7MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Manila since 2016.

1
FLORDES CONSTRUCTION & TRADING CORP.95 projects · ₱2.82B
2
EIGHT J'S CONSTRUCTION SERVICES73 projects · ₱5.03B
3
JMK BUILDERS CONSTRUCTION67 projects · ₱695.0M
4
JELSIE CONSTRUCTION & SUPPLY64 projects · ₱4.17B
5
N.M.E. CONSTRUCTION62 projects · ₱506.9M