National projects
274projects
₱10.06Bin all
54ongoing
2slow
- Roads and bridges ₱5.40B
- Flood control ₱3.25B
- Buildings ₱791.6M
- Other ₱366.5M
- Schools ₱231.7M
- Water ₱13.3M
Showing 1 to 30 of 274
Rehabilitation of multi-purpose building (barangay hall) at barangay anibongan, Davao del norte (125.717947°, 7.394050°)
Buildings · 2026 · SPS CONSTRUCTION SERVICES
₱4.9MOn-Going · 20%
Rehabilitation/major repair of bridge - liboganon bridge (b00015mn) along maharlika highway (mn)
Roads and bridges · 2026 · TAGUM BUILDERS CONTRACTORS CORP.
₱14.2MOn-Going · 59%
Mangalcal br. (b01963mn) along saturnino r. silva rd
Other · 2026 · RITZ BUILDERS CONSTRUCTION INC.
₱6.7MCompleted · 100%
Improvement of jct. panabo city coastal road to jct. tagum to santo tomas diversion road, Package 1
Roads and bridges · 2025 · METRO GEAR CONSTRUCTION CORP.
₱143.3MOn-Going · 23%
Improvement of jct. panabo city coastal road to jct. tagum to santo tomas diversion road, Package 2
Roads and bridges · 2025 · METRO GEAR CONSTRUCTION CORP.
₱143.3MOn-Going · 20%
Concreting of road in barangay ising
Roads and bridges · 2025 · OFC CONSTRUCTION
₱4.9MCompleted · 100%
Concreting of road in barangay tubod
Roads and bridges · 2025 · AARJG BUILDERS CORPORATION
₱4.9MOn-Going · 90%
Construction of multi-purpose building in barangay tibulao
Buildings · 2025 · TWO DEGREES CONSTRUCTION AND SUPPLY
₱4.9MCompleted · 100%
Concreting of road in barangay magsaysay
Roads and bridges · 2025 · AARJG BUILDERS CORPORATION
₱4.9MOn-Going · 79%
Concreting of road in barangay alejal
Roads and bridges · 2025 · AARJG BUILDERS CORPORATION
₱4.9MOn-Going · 80%
Construction of rainwater collector system (rwcs)
Water · 2025 · CJEP BUILDERS AND ENGINEERING SERVICES
₱2.6MCompleted · 100%
Construction of flood control mitigation structure at sadpudon creek phase 3
Flood control · 2025 · KANAWAY BUILDERS CORPORATION
₱144.8MCompleted · 100%
Construction of flood control mitigation structure at sadpudon creek phase 2
Flood control · 2025 · KANAWAY BUILDERS CORPORATION
₱144.8MCompleted · 100%
Retrofitting/strengthening of bridge - liboganon br. (b00015mn) along maharlika highway
Roads and bridges · 2025 · RUPLINO SEISMUNDO CONSTRUCTION CORPORATION
₱5.6MOn-Going · 93%
Retrofitting/strengthening of bridge - ising br. (b01851mn) along maharlika highway
Roads and bridges · 2025 · MIGHTY BUILDERS & SUPPLY CORPORATION
₱965KOn-Going · 82%
Construction of rainwater collector system (rcws) 1. casuga new maligaya elementary school, Brgy. ising, Davao del norte 2. anibongan elementary school, Brgy. anibongan, Davao del norte 3. tuganay elementary school, Brgy. tuganay
Schools · 2025 · ZJN DEVELOPMENT CONSTRUCTION & SUPPLY CORPORATION
₱2.6MCompleted · 100%
Replacement of bridge - gov. miranda br. (b00016mn) along maharlika highway
Roads and bridges · 2025 · P.L. SEBASTIAN CONSTRUCTION, INC.
₱301.5MOn-Going · 37%
Preventive maintenance - primary roads along maharlika highway - (s00062mn) k1482+(-370) - k1482+483, (s00065mn) k1476+346 - k1476+1005, (s01364mn) k1475+006 - k1475+665, K1481+490 - k1482+370
Roads and bridges · 2025 · VICENTE T. LAO CONSTRUCTION
₱135.4MOn-Going · 99%
Construction of gravel road - carmen - tagum city coastal road
Roads and bridges · 2025 · GP & H CONSTRUCTION INCORPORATED
₱84.2MOn-Going · 0%
Replacement (completion) of bridge - tuganay br. 2 (b01854mn) along maharlika highway (phase ii)
Roads and bridges · 2025 · LICSAL CONSTRUCTION CORPORATION
₱104.5MOn-Going · 98%
Construction of flood mitigation structure along lasang river
Flood control · 2025 · KANAWAY BUILDERS CORPORATION
₱81.6MOn-Going · 1%
Reconstruction to concrete pavement - maharlika highway - k1469+530-k1469+800, K1469+870-k1470+168
Roads and bridges · 2025 · LICSAL CONSTRUCTION CORPORATION
₱33.8MOn-Going · 79%
Construction of protection dike, Libuganon river irrigation system, Mabaus relief drainage
Flood control · 2025 · EACN CONSTRUCTION
₱14.5MCompleted · 100%
Construction (completion) of multi-purpose building (evacuation center), Barangay tubod
Buildings · 2025 · KANAWAY BUILDERS CORPORATION
₱4.0MCompleted · 100%
Construction (completion) of multi-purpose building (barangay hall), Barangay mabaus and barangay lapaz
Buildings · 2025 · TWO DEGREES CONSTRUCTION AND SUPPLY
₱6.9MCompleted · 100%
Construction of multi-purpose building (barangay hall), Barangay new camiling
Buildings · 2025 · MIGHTY BUILDERS & SUPPLY CORPORATION
₱7.8MCompleted · 100%
Guadalupe - lower tuganay road connecting carmen overland transport terminal in support of banana and coconut industries
Roads and bridges · 2025 · GERLIE CONSTRUCTION AND SUPPLY OPC
₱4.7MCompleted · 100%
Construction (completion) of dpwh davao del norte sub-deo building
Buildings · 2025 · EACN CONSTRUCTION / RUPLINO SEISMUNDO CONSTRUCTION CORPORATION
₱57.9MOn-Going · 41%
Locutan br. 1 (b00190mn) along tagum-panabo circum rd
Roads and bridges · 2025 · EACN CONSTRUCTION
₱5.7MCompleted · 100%
Alejal br. (b00023mn) along saturnino r. silva rd.
Roads and bridges · 2025 · EACN CONSTRUCTION
₱995KCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
LLM UNIFIED BUILDERS & TRADING CORP.22 projects · ₱103.2M
2
MAG CORPORATION17 projects · ₱100.3M
3
TWO DEGREES CONSTRUCTION AND SUPPLY15 projects · ₱123.9M
4
METRO GEAR CONSTRUCTION CORP.13 projects · ₱658.6M
5
GP & H CONSTRUCTION INCORPORATED11 projects · ₱560.3M