Official seal of Camiguin

Camiguin: Government

Province in Northern Mindanao, Mindanao · 5 towns and cities

National projects

Built by DPWH in Camiguin since 2016.

685projects
₱12.94Bin all
121ongoing
6slow
  • Roads and bridges ₱5.40B
  • Flood control ₱3.81B
  • Buildings ₱2.69B
  • Schools ₱833.5M
  • Water ₱162.1M
  • Other ₱49.2M

Showing 61 to 90 of 121

Construction of airport facility (camiguin airport runway), Barangay lumad, Camiguin (phase 3) Buildings · Mambajao · 2024 · JEJOR'S CONSTRUCTION CORPORATION
₱191.1MOn-Going · 32%Slow
Construction of bridge from barangay benoni, Mahinog to barangay maac Roads and bridges · Guinsiliban · 2024 · JEJOR'S CONSTRUCTION CORPORATION
₱382.1MOn-Going · 65%
Construction of airport facility (camiguin airport runway), Barangay lumad, Camiguin (phase 1) Buildings · Mambajao · 2024 · JEJOR'S CONSTRUCTION CORPORATION
₱238.8MOn-Going · 21%Slow
Construction of multi-purpose building, Poblacion Buildings · Mambajao · 2024 · FNTC CONSTRUCTION
₱19.7MOn-Going · 100%
₱71.8MOn-Going · 100%
Construction of road along catarman alternate road (sto.niñ0 cold spring) Roads and bridges · Catarman · 2024 · SHEEN-SHEEN CONSTRUCTION CORPORATION
₱70.2MOn-Going · 100%
Construction of slope protection along camiguin circumferential road benoni section 1 (near benoni es) Flood control · Mahinog · 2024 · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
₱71.2MOn-Going · 29%Slow
Construction of slope protection along camiguin circumferential road lawigan Flood control · Catarman · 2024 · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
₱71.2MOn-Going · 98%
Construction of slope protection along camiguin circumferential road catibac section Flood control · Catarman · 2024 · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
₱71.2MOn-Going · 98%
₱14.5MOn-Going · 100%
Concreting of sitio pasanan, Brgy. manduao to sitio tubos, Brgy. liloan fmr, Brgy. manduao and brgy. liloan Roads and bridges · Catarman · 2024 · SHEEN-SHEEN CONSTRUCTION CORPORATION
₱48.2MOn-Going · 100%
Construction of multi-purpose building/facility, Balbagon Buildings · Mambajao · 2024 · JEJOR'S CONSTRUCTION CORPORATION
₱49.3MOn-Going · 100%
Construction of multi-purpose building, Balbagon Buildings · Mambajao · 2024 · JEJOR'S CONSTRUCTION CORPORATION
₱29.5MOn-Going · 99%
Widening of permanent bridges dinangasan bridge (b00020cg) along camiguin circumferential road (phase ii) Roads and bridges · Catarman · 2024 · JEJOR'S CONSTRUCTION CORPORATION
₱114.6MOn-Going · 100%
Rehabilitation of alangilan seawall, Alangilan Flood control · Sagay · 2024 · SHEEN-SHEEN CONSTRUCTION CORPORATION
₱18.6MOn-Going · 100%
Construction of road, Sto. niño Roads and bridges · Catarman · 2024 · JANRHYLL CONSTRUCTION
₱11.4MOn-Going · 100%
Construction of road, Barangay tupsan pequeño, Municipality of mahinog, Province of camiguin Roads and bridges · Mahinog · 2024 · CLC CONSTRUCTION SERVICES AND SUPPLY
₱14.4MOn-Going · 100%
Construction of taoctoc - talimonos - minsua road, Tupsan pequeño Roads and bridges · Mahinog · 2024 · SHEEN-SHEEN CONSTRUCTION CORPORATION
₱4.7MOn-Going · 100%
Construction of river control along magting box culvert Flood control · Mambajao · 2024 · JANRHYLL CONSTRUCTION
₱19.0MOn-Going · 100%
Construction of roads, Barangay benoni, Municipality of mahinog, Province of camiguin Roads and bridges · Mahinog · 2024 · SHEEN-SHEEN CONSTRUCTION CORPORATION
₱9.5MOn-Going · 100%
Rehabilitation of lakas - pandan - katibawasan road, Poblacion Roads and bridges · Mambajao · 2024 · JANRHYLL CONSTRUCTION
₱4.8MOn-Going · 100%
Construction of road, Poblacion Roads and bridges · Catarman · 2024 · FNTC CONSTRUCTION
₱11.5MOn-Going · 31%Slow
Construction of sto. niño-mainit bridge including approach road barangay sto.niño and mainit-catarman Roads and bridges · Catarman · 2024 · WDM CONSTRUCTION AND SUPPLIES
₱48.2MOn-Going · 98%
Construction of slope protection along mambajao-catarman cross country road section 1 Roads and bridges · Mambajao · 2024 · JEJOR'S CONSTRUCTION CORPORATION
₱67.2MOn-Going · 99%
Construction of dinangasan river control, Incl. row, Package 2 Flood control · Catarman · 2024 · VICTORIANO C. LIM CONSTRUCTION CORPORATION
₱140.5MOn-Going · 100%
Construction of multi-purpose building, Barangay cantaan Buildings · Guinsiliban · 2024 · FNTC CONSTRUCTION
₱4.9MOn-Going · 100%
Construction of river control along sss box culvert Flood control · Mambajao · 2024 · CLC CONSTRUCTION SERVICES AND SUPPLY
₱19.0MOn-Going · 100%
Construction of river control along trining bridge Flood control · Mambajao · 2024 · JANRHYLL CONSTRUCTION
₱28.5MOn-Going · 100%
Construction of slope protection along magting - tupsan alternate road Flood control · Mambajao · 2024 · SHEEN-SHEEN CONSTRUCTION CORPORATION
₱28.6MOn-Going · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Camiguin since 2016.

1
SHEEN-SHEEN CONSTRUCTION CORPORATION202 projects · ₱2.25B
2
JAPUZ-JANSOL ENTERPRISES85 projects · ₱1.11B
3
JEJOR'S CONSTRUCTION CORPORATION78 projects · ₱4.54B
4
JANRHYLL CONSTRUCTION52 projects · ₱399.8M
5
GCMG CONSTRUCTION49 projects · ₱332.2M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →