National projects
685projects
₱12.94Bin all
121ongoing
6slow
- Roads and bridges ₱5.40B
- Flood control ₱3.81B
- Buildings ₱2.69B
- Schools ₱833.5M
- Water ₱162.1M
- Other ₱49.2M
Construction of airport facility (camiguin airport runway), Barangay lumad, Camiguin (phase 2)
Buildings · Mambajao · 2024 · JEJOR'S CONSTRUCTION CORPORATION
₱238.8MOn-Going · 25%Slow
Construction of airport facility (camiguin airport runway), Barangay lumad, Camiguin (phase 3)
Buildings · Mambajao · 2024 · JEJOR'S CONSTRUCTION CORPORATION
₱191.1MOn-Going · 32%Slow
Construction of airport facility (camiguin airport runway), Barangay lumad, Camiguin (phase 1)
Buildings · Mambajao · 2024 · JEJOR'S CONSTRUCTION CORPORATION
₱238.8MOn-Going · 21%Slow
Construction of slope protection along camiguin circumferential road benoni section 1 (near benoni es)
Flood control · Mahinog · 2024 · AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)
₱71.2MOn-Going · 29%Slow
Construction of road, Poblacion
Roads and bridges · Catarman · 2024 · FNTC CONSTRUCTION
₱11.5MOn-Going · 31%Slow
Construction of slope protection along cross country road, Catarman to mambajao (package 3) catarman
Flood control · Mambajao · 2022 · ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 31762)
₱96.5MOn-Going · 54%Slow
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
SHEEN-SHEEN CONSTRUCTION CORPORATION202 projects · ₱2.25B
2
JAPUZ-JANSOL ENTERPRISES85 projects · ₱1.11B
3
JEJOR'S CONSTRUCTION CORPORATION78 projects · ₱4.54B
4
JANRHYLL CONSTRUCTION52 projects · ₱399.8M
5
GCMG CONSTRUCTION49 projects · ₱332.2M