Alamada: Government

Municipality in Cotabato, Soccsksargen, Mindanao · 17 barangays

Town hall contracts

Construction contracts the town hall of Alamada awarded and posted on PhilGEPS.

642projects
₱1.32Bin all
  • Roads and bridges ₱499.0M
  • Buildings ₱486.2M
  • Other ₱117.5M
  • Flood control ₱107.5M
  • Water ₱86.7M
  • Schools ₱27.1M

The last construction award Alamada posted on PhilGEPS is from August 2025. A town has to post every award, so the list below is likely not all of its work. The town's own reports are in "Town hall papers".

All

Showing 631 to 642 of 642

Rehabilitation polayagan road Roads and bridges · 2015 · KING BUILDERS CONSTRUCTION AND SUPPLY
₱554K
Rehabilitation located at brgy. macabasa Roads and bridges · 2015 · J-ONE BUILDERS
₱554K
Rehabilitation mapurok road Roads and bridges · 2015 · J-ONE BUILDERS
₱554K
Const’n./ maint./rehab. - concreting of mariano gomez st. (militar section) located at brgy. kitacubong Roads and bridges · 2015 · YR BUILDERS AND SUPPLY
₱555K
Construction at brgy paruayan Roads and bridges · 2015 · YR BUILDERS AND SUPPLY
₱555K
Completion of hanging bridge polayagan-mapurok section (construction of landing) located at brgy. mapurok Roads and bridges · 2015 · J-ONE BUILDERS
₱399K
Construction of macabasa ws-level 2 located at brgy. macabasa Other · 2015 · PHILTIL CONSTRUCTION
₱1.7M
Construction of mapurok-pacao ws level 3 located at brgy. mapurok-pacao Other · 2015 · PHILTIL CONSTRUCTION
₱6.5M
Improvement of raradangan ws level 3, (salcedo source) located at brgy. raradangan Other · 2015 · PHILTIL CONSTRUCTION
₱1.3M
Construction of flood control/slope protection located at brgy. paruayan Flood control · 2015 · PHILTIL CONSTRUCTION
₱399K
Construction of lower dado ws level 2 (water point source) located at brgy. lower dado Other · 2015 · PHILTIL CONSTRUCTION
₱1.0M
Asik-asik eco-tourism park located at sitio dulao, Dado Other · 2014 · YR BUILDERS AND SUPPLY
₱997K

Source: PhilGEPS award notices, from the BetterGov.ph open data (CC0).

Town hall papers

Not every project is on PhilGEPS. These are the town's own reports.

1
Budget and 20% development fundDILG Full Disclosure Policy portal
2
Audit reportsCommission on Audit

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board.

Post on Talk →