National projects
2788projects
₱65.02Bin all
447ongoing
9slow
- Roads and bridges ₱41.85B
- Flood control ₱14.14B
- Schools ₱4.26B
- Buildings ₱3.67B
- Water ₱579.0M
- Other ₱519.2M
Showing 2641 to 2670 of 2,788
Upgrading (unpaved to paved) of rizal - dakak - dapitan coastal loop road, K1834+380.00 - k1834+775.00, K1834+775.00 - k1835+866.42, K1836+454.89 - k1840+040.00, Net length = 5, 071.53 ln.m.
Roads and bridges · Rizal · 2016 · MONTAÑO CONSTRUCTION & DEVELOPMENT CORPORATION
₱143.5MCompleted · 100%
Construction/extension of flood control structure along dipolog river, Guinles(downstream) section guinles
Flood control · Polanco · 2016 · LEXAND CONSTRUCTION & DEVELOPMENT / THREE W BUILDERS, INC.
₱28.9MCompleted · 100%
Construction/extension of flood control structure along dipolog river, Guinles(upstream) section guinles
Flood control · Polanco · 2016 · LEXAND CONSTRUCTION & DEVELOPMENT / THREE W BUILDERS, INC.
₱29.4MCompleted · 100%
Widening of bridges tolon bridge ( bo0581mn) along dipolog-oroquieta national road
Roads and bridges · Rizal · 2016 · A.C. RIVERO DEVELOPMENT CORPORATION
₱26.3MCompleted · 100%
Concreting of p. road along brgy. isis-linabo municipality of polanco
Roads and bridges · Polanco · 2016 · RUDHIL CONSTRUCTION & ENTERPRISES, INC.
₱19.5MCompleted · 100%
Upgrading (asphalt to concrete) along sindangan to liloy road, 2nd deo, K 1953 + 500.00 - k 1954 + 111.13, K 1954 + 135.73 - k 1955 + 789.38, K 1956 + 023.45 - k 1956 + 510.95, K 1956 + 959.35 - k 1958 + 053.05 (net length = 4, 209.98
Roads and bridges · Leon T. Postigo · 2016 · HSO CONSTRUCTION CORPORATION (FOREMERLY : HENRY S.
₱87.8MCompleted · 100%
Asphalt to concrete along sindangan - liloy road, Zn
Roads and bridges · Liloy · 2016 · MIN CONSTRUCTION
₱27.9MCompleted · 100%
Asphalt to concrete along liloy - ipil road, K1987+180 - k1988+040 3rd district, Zn.
Roads and bridges · Tampilisan · 2016 · MIN CONSTRUCTION
₱23.9MCompleted · 100%
Concreting of siocon-sirawai-sibuco road (limpapa section), Zn
Roads and bridges · Sirawai · 2016 · MIN CONSTRUCTION
₱33.3MCompleted · 100%
Concreting of p. road along brgy. mapang-sipaon road rizal
Roads and bridges · Rizal · 2016 · DL ENTERPRISES
₱48.8MCompleted · 100%
Concreting of p. road along brgy. sta. teresita-alvenda municipality of mutia
Roads and bridges · Sergio Osmeña Sr. · 2016 · DL ENTERPRISES
₱29.4MCompleted · 100%
Construction of flood control structure along left and right bank of piao river, Roxas, Zambonga del norte.
Flood control · Pres. Manuel A. Roxas · 2016 · VICENTE T. LAO CONSTRUCTION
₱40.9MCompleted · 100%
Construction of multi-purpose building at zaneco compound at brgy. minaog
Buildings · Dipolog City · 2016 · LONG ISLAND BUILDERS & CONSTRUCTION
₱2.0MCompleted · 100%
Concreting jose abad santos st. to e. aguinaldo st., Brgy. ramon magsaysay
Roads and bridges · Sindangan · 2016 · ST. JOSEPH CONSTRUCTION AND TRADING
₱1.5MCompleted · 100%
Concreting osmeña st. from rizal ave. extension connecting brgy. ramon magsaysay, Brgy. dapaon
Roads and bridges · Sindangan · 2016 · ST. JOSEPH CONSTRUCTION AND TRADING
₱1.5MCompleted · 100%
Concreting of provincial road along brgy. sindangan-dicoyong-nato
Flood control · Sindangan · 2016 · ESR CONSTRUCTION AND DEVELOPMENT CORPORATION
₱26.5MCompleted · 100%
Concreting of provincial road brgy. villaramos - saluyong road
Roads and bridges · Manukan · 2016 · A.C. RIVERO DEVELOPMENT CORPORATION
₱28.5MCompleted · 100%
Const. of school building for sindangan pilot dem. school, Poblacion, Z.n.
Schools · Sindangan · 2016 · ST. JOSEPH CONSTRUCTION AND TRADING
₱3.8MCompleted · 100%
Upgrading (unpaved to paved) of polanco - macleodes road, K 1843 + 285.00 to k 1846 + 535.00, Net length = 3, 250.00 ln.m.
Roads and bridges · Polanco · 2016 · MONTAÑO CONSTRUCTION & DEVELOPMENT CORPORATION
₱74.4MCompleted · 100%
Upgrading (unpaved to paved): ilaya-isis-polanco road, K1820+200.000 - k1821+224.620, K1820+243.640 - k1821+715.650 (net length = 1, 496.63ln.m.)
Roads and bridges · Piñan · 2016 · MONTAÑO CONSTRUCTION & DEVELOPMENT CORPORATION
₱39.7MCompleted · 100%
Replacement of barra bridge no.2 along barra-minaog road leading to dipolog city airport, 0000 + 080.00 - 0000 + 380.00 (net length = 120.84 ln.m.)
Roads and bridges · Dipolog City · 2016 · VICENTE T. LAO CONSTRUCTION
₱52.2MCompleted · 100%
Upgrading (unpaved to paved): piñan-mutia road, Zamboanga del norte 3rd deo, K1829+766 - k1833+940, K1834+700 - k1834+900; net length = 4, 374.00 ln.m.
Roads and bridges · Piñan · 2016 · A.C. RIVERO DEVELOPMENT CORPORATION
₱121.1MCompleted · 100%
Construction of new permanent bridges, Completion of paniran pscg bridge along zamboanga west coast road, Limpapa - sibuco road, Zamboanga del norte; sta. 1995+520.00 - sta. 1996+060.00.
Roads and bridges · Sibuco · 2016 · BENDIMIL CONSTRUCTION & DEVELOPMENT CORP.
₱4.4MCompleted · 100%
Construction of by - pass road including r.o.w. of airport - turno - sinaman by-pass road, Sta. 0 + 600.00 to sta. 8 + 194.44; net length = 7, 594.440 ln.m.
Roads and bridges · Polanco · 2016 · MONTAÑO CONSTRUCTION & DEVELOPMENT CORPORATION
₱137.4MCompleted · 100%
Widening including drainage and off-carriageway dipolog-oroquieta national road, Zamboanga del norte (1st - deo), K 1829 + 540.00 to k 1831 + 660.00 (net length = 2, 120.00 ln.m.)
Roads and bridges · Dipolog City · 2016 · ESR CONSTRUCTION AND DEVELOPMENT CORPORATION
₱47.9MCompleted · 100%
Upgrading (unpaved to paved) of sindangan - bayog - lakewood road, K1934+900.00 - k1936+440.00, Net length = 1, 540.00 ln.m.
Roads and bridges · Leon T. Postigo · 2016 · ESR CONSTRUCTION AND DEVELOPMENT CORPORATION
₱105.0MCompleted · 100%
Upgrading (unpaved to paved) of rizal - dakak - dapitan coastal loop road, K1830+055.00 - k1834+380.00, Net length = 4, 325.00 ln.m.
Roads and bridges · Sibutad · 2016 · ESR CONSTRUCTION AND DEVELOPMENT CORPORATION
₱146.0MCompleted · 100%
Widening including drainage and off-carriageway dipolog-oroquieta national road, Sta. 1831+660.00 to sta. 1835+000.00 (net length = 3, 340.00 ln.m.)
Roads and bridges · Dipolog City · 2016 · ESR CONSTRUCTION AND DEVELOPMENT CORPORATION
₱95.0MCompleted · 100%
Upgrading (unpaved to paved) of polanco - macleodes road, K 1838 + 000.00 to k 1838 + 575.49, K 1839 + 178.10 to k 1840 + 662.26, K 1840 + 828.61 to k 1842+ 860.00, Net length = 4, 091.04 ln.m.
Roads and bridges · Polanco · 2016 · MONTAÑO CONSTRUCTION & DEVELOPMENT CORPORATION / MONTPHIL CONSTRUCTION CORPORATION
₱88.8MCompleted · 100%
Widening of dipolog-sindangan-liloy road including drainage manukan section, Manukan z. n.
Roads and bridges · Manukan · 2016 · A.C. RIVERO DEVELOPMENT CORPORATION
₱14.3MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
RUDHIL CONSTRUCTION & ENTERPRISES, INC.277 projects · ₱4.85B
2
LONG ISLAND BUILDERS & CONSTRUCTION163 projects · ₱3.46B
3
MONTAÑO CONSTRUCTION & DEVELOPMENT CORPORATION140 projects · ₱9.64B
4
ST. JOSEPH CONSTRUCTION AND TRADING139 projects · ₱573.8M
5
D' DREAMER DEVELOPMENT CORPORATION131 projects · ₱1.25B