Oras: Government

Municipality in Eastern Samar, Eastern Visayas, Visayas · 42 barangays

National projects

Built by DPWH in Oras since 2016.

132projects
₱3.13Bin all
12ongoing
0slow
  • Flood control ₱1.53B
  • Roads and bridges ₱1.28B
  • Schools ₱194.3M
  • Buildings ₱109.9M
  • Water ₱9.8M

Showing 61 to 90 of 132

Construction of flood control structure along oras river Flood control · 2020 · PABLO S. LABASBAS CONSTRUCTION CORPORATION
₱9.8MCompleted · 100%
₱9.8MCompleted · 100%
Concreting of brgy. bato, Arteche - brgy. cagpile, Fmr Roads and bridges · 2019 · TWO-BROTHERS CONSTRUCTION
₱6.0MCompleted · 100%
Modified standard dpwh-deped one-storey two classroom school building, Buntay elem. school Schools · 2019 · PABLO S. LABASBAS CONSTRUCTION CORPORATION
₱4.7MCompleted · 100%
Modified standard dpwh-deped one-storey two classroom school building, Bantayan elem. school Schools · 2019 · PABLO S. LABASBAS CONSTRUCTION CORPORATION
₱4.5MCompleted · 100%
₱1.4MCompleted · 100%
₱768KCompleted · 100%
₱1.4MCompleted · 100%
₱1.4MCompleted · 100%
₱1.4MCompleted · 100%
Construction of multi-purpose building, Brgy. tawagan Buildings · 2019 · ARNOLD G. COSIPAG CONSTRUCTION
₱2.8MCompleted · 100%
Construction of multi-purpose building (phase i) brgy. factoria Buildings · 2019 · PABLO S. LABASBAS CONSTRUCTION CORPORATION
₱1.4MCompleted · 100%
₱475KCompleted · 100%
₱475KCompleted · 100%
₱448KCompleted · 100%
₱3.0MCompleted · 100%
Construction of 2-storey, 8-classroom building at oras national high school Schools · 2018 · PABLO S. LABASBAS CONSTRUCTION CORPORATION
₱17.1MCompleted · 100%
₱3.0MCompleted · 100%
₱3.1MCompleted · 100%
Construction (completion) of multi-purpose building nadacpan Buildings · 2018 · PABLO S. LABASBAS CONSTRUCTION CORPORATION
₱927KCompleted · 100%
Construction of multi-purpose building pangudtan Buildings · 2018 · ARNOLD G. COSIPAG CONSTRUCTION
₱2.8MCompleted · 100%
Construction of multi-purpose building mabuhay Buildings · 2018 · ARNOLD G. COSIPAG CONSTRUCTION
₱2.8MCompleted · 100%
Construction of brgy saugan flood control structures, Brgy. saugan Flood control · 2018 · A.C. RIVERO DEVELOPMENT CORPORATION
₱39.2MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

Who builds here

Contractors with the most projects in Oras since 2016.

1
TUBIGAN BUILDERS36 projects · ₱109.9M
2
PABLO S. LABASBAS CONSTRUCTION CORPORATION20 projects · ₱327.0M
3
ARNOLD G. COSIPAG CONSTRUCTION9 projects · ₱42.1M
4
888 ACY ENTERPRISES7 projects · ₱318.1M
5
TWO-BROTHERS CONSTRUCTION7 projects · ₱55.2M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →