Albuera: Government

Municipality in Leyte, Eastern Visayas, Visayas · 16 barangays

National projects

Built by DPWH in Albuera since 2016.

159projects
₱5.70Bin all
11ongoing
0slow
  • Roads and bridges ₱3.43B
  • Flood control ₱1.96B
  • Schools ₱126.6M
  • Water ₱106.7M
  • Buildings ₱50.7M
  • Other ₱17.6M

Showing 1 to 30 of 146

Construction (completion) of multi-purpose building, Barangay damulaan Buildings · 2025 · RED AXE BUILDERS & SUPPLY
₱4.9MCompleted · 100%
Construction of missing links/new roads, Albuera-burauen road(albuera section), Package 8 Roads and bridges · 2025 · BNR CONSTRUCTION & DEVELOPMENT CORP.
₱96.2MCompleted · 100%
Construction of flood control mitigation structure cagbulo river Flood control · 2025 · JM COLLERA KONSTRACT
₱48.1MCompleted · 100%
Construction of road, Poblacion Roads and bridges · 2025 · CIRCLE Z VENTURES & DEVELOPMENT CORP.
₱18.6MCompleted · 100%
₱21.2MCompleted · 100%
₱48.1MCompleted · 100%
Construction of burauen-albuera road, Sta. 10+580 - sta. 10+700 Roads and bridges · 2025 · EZJONES CONSTRUCTION INC. / JB KONSTRUKTURA COMPANY
₱144.6MCompleted · 100%
Construction of burauen-albuera road, Sta. 10+480 - sta. 10+580 Roads and bridges · 2025 · EZJONES CONSTRUCTION INC.
₱144.6MCompleted · 100%
₱4.9MCompleted · 100%
Construction of burauen - albuera road, Sta. 9+795 - sta. 9+850 Roads and bridges · 2024 · EZJONES CONSTRUCTION INC.
₱96.4MCompleted · 100%
Construction of burauen - albuera road, Sta. 9+850 - sta. 9+920 Roads and bridges · 2024 · EZJONES CONSTRUCTION INC.
₱96.4MCompleted · 100%
Repair/rehabilitation of sibugay flood control (upstream) Flood control · 2024 · RJIR ENTERPRISES CORPORATION
₱76.5MCompleted · 100%
₱13.4MCompleted · 100%
Construction of seawall, Barangaypoblacion Flood control · 2024 · JM COLLERA KONSTRACT
₱96.4MCompleted · 100%
Construction of flood control structure barangay calingatnan Flood control · 2024 · JSONS BUILDERS / RJIR ENTERPRISES CORPORATION
₱96.5MCompleted · 100%
Construction of missing links/new roads, Albuera-burauen road (albuera section), Package 7 Roads and bridges · 2024 · BNR CONSTRUCTION & DEVELOPMENT CORP.
₱100.3MCompleted · 100%
Construction of missing links/new roads, Albuera-burauen road (albuera section), Package 6 Roads and bridges · 2024 · BNR CONSTRUCTION & DEVELOPMENT CORP.
₱102.6MCompleted · 100%
Construction of benolho flood control structure (upstream) Flood control · 2024 · AQUALINE CONSTRUCTION CORPORATION / EVERBUILT CONSTRUCTION
₱96.4MCompleted · 100%
Construction of flood control structure (downstream) barangay tabgas Flood control · 2024 · JM COLLERA KONSTRACT
₱96.4MCompleted · 100%
Construction of sibugay flood control structure (upstream) Flood control · 2024 · JM COLLERA KONSTRACT
₱96.5MCompleted · 100%
Construction of water system Water · 2024 · CIRCLE Z VENTURES & DEVELOPMENT CORP. / RJIR ENTERPRISES CORPORATION
₱95.1MCompleted · 100%
Construction of mahayag flood control structure Flood control · 2024 · JM COLLERA KONSTRACT
₱96.4MCompleted · 100%
Construction of drainage structure, Brgy. tabgas Flood control · 2024 · GMP BUILDERS
₱5.4MCompleted · 100%
Rehabilitation of spillway, Barangay antipolo Flood control · 2024 · RJIR ENTERPRISES CORPORATION
₱9.2MCompleted · 100%
Construction of multi-purpose building (pnp station) barangay tabgas Buildings · 2023 · RED AXE BUILDERS & SUPPLY
₱5.8MCompleted · 100%
₱4.9MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

Who builds here

Contractors with the most projects in Albuera since 2016.

1
RJIR ENTERPRISES CORPORATION34 projects · ₱706.5M
2
MAC BUILDERS CORP.12 projects · ₱313.9M
3
GMP BUILDERS12 projects · ₱26.6M
4
A.C. RIVERO DEVELOPMENT CORPORATION10 projects · ₱215.1M
5
JM COLLERA KONSTRACT9 projects · ₱578.2M

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →