Hindang: Government

Municipality in Leyte, Eastern Visayas, Visayas · 20 barangays

Town hall contracts

Construction contracts the town hall of Hindang awarded and posted on PhilGEPS.

39projects
₱136.2Min all
  • Roads and bridges ₱64.5M
  • Buildings ₱35.3M
  • Other ₱34.2M
  • Water ₱1.3M
  • Flood control ₱985K

The last construction award Hindang posted on PhilGEPS is from August 2025. A town has to post every award, so the list below is likely not all of its work. The town's own reports are in "Town hall papers".

All

Showing 31 to 39 of 39

Construction of new hindang public market building (materials, Labor & equipment) at pob ii Buildings · 2021 · BERDS CONSTRUCTION
₱5.4M
Construction/rehab of damage existing concrete irrigation line canal (materials, Labor & equipment) at brgy. anolon, Sitio cabinac Flood control · 2021 · BERDS CONSTRUCTION
₱598K
Concreting of municipal streets (materials, Labor & equipment) at lopez jaena st corner romano st. pob. ii Roads and bridges · 2021 · RCB CONSTRUCTION AND GENERAL SERVICES
₱2.2M
Concreting of farm to market road (mabagon-anahaw diversion road) (materials, Labor & equipment) at brgy. mabagon-anahaw road Roads and bridges · 2021 · BERDS CONSTRUCTION
₱2.3M
Reclamation development (materials, Labor & equipment) at brgy. poblacion i Other · 2021 · BERDS CONSTRUCTION
₱991K
Expansion of level ii water supply system of brgy. himacugo Water · 2020 · BERDS CONSTRUCTION
₱1.3M
Upgrading (materials, Labor & equipment) at brgy. capudloza - canha-ayon Roads and bridges · 2020 · BERDS CONSTRUCTION
₱4.0M
Upgrading (materials, Labor & equipment) at brgy. canha-ayon-mahilum Roads and bridges · 2020 · BERDS CONSTRUCTION
₱4.0M
Construction of new hindang public market (bldg. a) (materials, Labor & equipment) in brgy. poblacion ii Buildings · 2015 · CNE CONSTRUCTION
₱16.9M

Source: PhilGEPS award notices, from the BetterGov.ph open data (CC0).

Town hall papers

Not every project is on PhilGEPS. These are the town's own reports.

1
Budget and 20% development fundDILG Full Disclosure Policy portal
2
Audit reportsCommission on Audit

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board.

Post on Talk →