TA
Tanauan: Government
Municipality in Leyte, Eastern Visayas, Visayas · 54 barangays
National projects
231projects
₱10.63Bin all
44ongoing
8slow
- Flood control ₱7.36B
- Roads and bridges ₱2.60B
- Buildings ₱312.1M
- Schools ₱207.8M
- Other ₱144.0M
Showing 91 to 120 of 231
Preventive maintenance - primary roads - daang maharlika (lt), K0920+199 - k0921 +090, K0921+130 - k0921+309, K0921+363 - k0921+553
Roads and bridges · 2023 · AQUALINE CONSTRUCTION CORPORATION
₱60.9MOn-Going · 0%Slow
Rehabilitation/ reconstruction/upgrading of damaged paved roads - tertiary roads - kiling-tanauan-tabontabon-julita road (s00068lt), K0931+184 - k0931+317
Roads and bridges · 2023 · G.O.C. BUILDERS
₱5.8MCompleted · 100%
Const./rehab. of flood mitigation facilities within major river basins and principal rivers - const. of flood control along binahaan river, Brgy. malaguicay
Flood control · 2023 · EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION
₱106.1MCompleted · 100%
Concreting of brgy. atipolo to brgy. baras fmr
Roads and bridges · 2023 · LATORRE CONSTRUCTION INC.
₱12.4MCompleted · 100%
Installation of road stud (solar) along kiling-tanauan-tabontabon-julita road (s00068lt) - k0928+(-672) - k0931+184
Roads and bridges · 2023 · MWJ CONSTRUCTION
₱44.1MCompleted · 100%
Construction of multi-purpose building, Brgy. cabarasan guti
Buildings · 2023 · JDR CONSTRUCTION
₱6.7MCompleted · 100%
Construction of drainage system, Brgy. san miguel
Flood control · 2023 · XDR CONSTRUCTION AND SUPPLY
₱4.9MOn-Going · 0%Slow
Preventive maintenance - primary roads - daang maharlika (lt), K0922+946 - k0923 +500
Roads and bridges · 2023 · R8 ASPHALT PLANT AND CONSTRUCTION INC.
₱22.7MCompleted · 100%
Const./rehab. of flood mitigation facilities within major river basins and principal rivers - const. of flood control structure along binahaan river, Brgy. baras
Flood control · 2023 · JELM CONSTRUCTION CORP.
₱48.5MCompleted · 100%
Const./maint. of flood mitigation structures and drainage systems - const. of flood control structure along limbuhan bridge, Brgy. bislig
Flood control · 2023 · GES CONSTRUCTION
₱48.9MCompleted · 100%
Construction of storm surge protection: tide embankment, Subsection 6.13, Barangay sto. niño
Flood control · 2023 · LANOY CONSTRUCTION
₱89.5MCompleted · 100%
Construction of storm surge protection: tide embankment, Subsection 6.12, Barangay sto. niño
Flood control · 2023 · SUNWEST, INC.
₱111.8MOn-Going · 100%
Construction of flood control structure along solano river (upstream), Brgy. san miguel and brgy. atipolo
Flood control · 2023 · AICON INDUSTRIES / PABLO S. LABASBAS CONSTRUCTION CORPORATION
₱95.7MOn-Going · 61%
Construction of storm surge protection: tide embankment, Subsection 6.10, Barangay san roque
Flood control · 2023 · EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION
₱113.1MCompleted · 100%
Construction of flood control structure along binahaan river, Brgy. cahumayhumayan
Flood control · 2023 · JELM CONSTRUCTION CORP.
₱106.1MCompleted · 100%
Construction of storm surge protection: tide embankment, Subsection 6.8, Barangay san roque, Leyte; 2. construction of storm surge protection: tide embankment, Subsection 6.9, Barangay san roque
Flood control · 2023 · EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION
₱226.2MCompleted · 100%
Construction of storm surge protection: tide embankment, Subsection 6.11, Barangay sto. niño
Flood control · 2023 · SUNWEST, INC.
₱111.0MOn-Going · 79%
Construction of multi-purpose building, Brgy. cahumay-humayan
Buildings · 2023 · PAFJ CONSTRUCTION AND SUPPLY, INC.
₱6.4MCompleted · 100%
Widening -tertiary roads - tanauan-dagami road (s00059lt), K0927+000 - k0927+587
Roads and bridges · 2023 · KALIPAYAN BUILDERS AND CONSTRUCTION SUPPLY
₱19.6MCompleted · 100%
Widening of permanent bridges - malaguicay bridge i (b00519lt) along tanauan-dagami road
Roads and bridges · 2023 · VIGUZ CONSTRUCTION CORPORATION
₱30.8MCompleted · 100%
Construction of multi-purpose building, Barangay binolo
Buildings · 2023 · NFBM CONSTRUCTION
₱6.7MOn-Going · 0%Slow
Construction of multi-purpose building, Brgy. san miguel
Buildings · 2023 · XDR CONSTRUCTION AND SUPPLY
₱4.9MCompleted · 100%
Widening -tertiary roads - tanauan-dagami road (s00059lt), K0929+036 - k0929+896
Roads and bridges · 2023 · TITANYA CONSTRUCTION & DEVELOPMENT CORPORATION
₱25.4MCompleted · 100%
Widening of permanent bridges, Malaguicay bridge 2 (b00520lt) along tanauan-dagami road
Roads and bridges · 2023 · VIGUZ CONSTRUCTION CORPORATION
₱18.1MCompleted · 100%
Construction of flood control mitigation facilities along binahaan river, Brgy. binongtoan section, (downstream), Sta. 0+000 to sta. 0+465
Flood control · 2022 · SUNWEST, INC.
₱95.7MCompleted · 100%
Concreting of brgy. cabarasan guti to brgy. san isidro fmr, Brgy. cabarasan guti and brgy. san isidro
Roads and bridges · 2022 · VHITS D. G. BUILDERS & ENTERPRISES
₱12.4MCompleted · 100%
Construction of flood control structure along binahaan river, Brgy. cabalagnan section (upstream/left bank), Sta. 0+000 - sta. 0+621, Leyte (revised)
Flood control · 2022 · L.N.R. CONSTRUCTION / SUNWEST, INC.
₱95.5MCompleted · 100%
Construction of multi-purpose building, Brgy. cabarasan guti
Buildings · 2022 · KRC CONSTRUCTION AND SUPPLY
₱4.9MCompleted · 100%
Construction of road, Brgy. san antonio, Palo, To balud
Roads and bridges · 2022 · XDR CONSTRUCTION AND SUPPLY
₱19.5MCompleted · 100%
Rehab. of multi-purpose building, Limbuhan daku elementary school, Limbuhan daku
Schools · 2022 · VHITS D. G. BUILDERS & ENTERPRISES
₱5.8MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION15 projects · ₱2.13B
2
XDR CONSTRUCTION AND SUPPLY13 projects · ₱176.6M
3
SUNWEST, INC.11 projects · ₱1.59B
4
JELM CONSTRUCTION CORP.10 projects · ₱725.9M
5
TITANYA CONSTRUCTION & DEVELOPMENT CORPORATION9 projects · ₱123.9M