Catarman: Government
Municipality in Northern Samar, Eastern Visayas, Visayas · 55 barangays
National projects
307projects
₱6.36Bin all
58ongoing
8slow
- Roads and bridges ₱3.31B
- Flood control ₱1.63B
- Buildings ₱987.6M
- Water ₱184.4M
- Schools ₱149.0M
- Other ₱92.4M
Showing 211 to 231 of 231
Construction of nenita river control along catarman - laong road
Flood control · 2016 · NORSAM BUILDERS & CONSTRUCTION SUPPLY
₱8.8MCompleted · 100%
Construction of barangay hall, Brgy. daganas
Buildings · 2016 · UBAS CONSTRUCTION
₱967KCompleted · 100%
Construction of water supply level ii, Brgy. mabini
Water · 2016 · UBAS CONSTRUCTION
₱1.9MCompleted · 100%
Construction of revetment on concrete sheet piles (river control), Brgy. trangue
Flood control · 2016 · UBAS CONSTRUCTION
₱2.0MCompleted · 100%
Const./concreting of roads: 1. const./conc. of brgy. polangi - brgy. paticua road, Catarman; 2. const./conc. of mabolo road, Catarman; 3. const./conc. of somoge road
Roads and bridges · 2016 · RHYES BUILDERS & SUPPLY
₱5.8MCompleted · 100%
Construction of revetment on concrete sheet piles (river control), Brgy. molave
Flood control · 2016 · VICTORIA DEVELOPMENT AND VENTURES CORP.
₱2.0MCompleted · 100%
Construction/concreting of roads: 1. const./conc. of uep zone iii road, Catarman; 2. const./conc. of imelda road
Roads and bridges · 2016 · JUPA CONSTRUCTION
₱3.9MCompleted · 100%
Construction of barangay hall: a. const. of brgy. hall, Brgy. aguinaldo, N. samar; b. const. of brgy. hall, Brgy. tinowaran, N. samar; c. const. of brgy. hall, Brgy. doña pulqueria, N. samar
Buildings · 2016 · CTC CONSTRUCTION & SUPPLIES
₱2.9MCompleted · 100%
Widening including drainage along allen - catarman road, Ko739+290 - ko741+300, Section id: s00005sm, 1st district
Roads and bridges · 2016 · THE TUSCAN STRUCTURES & SUPPLIES
₱52.9MCompleted · 100%
Const. / concreting of roads: 1. const./concreting of roads, Brgy. san julian; 2. const./concreting of roads, Brgy. salvacion; 3. const./concreting of roads, Brgy. guba
Roads and bridges · 2016 · JUPA CONSTRUCTION
₱5.9MCompleted · 100%
Const./concreting of roads with drainage: 1. const./conc. of roads w/ drainage, Brgy. calachuchi; 2. const./conc. of roads w/ drainage, Brgy. lapu-lapu; 3. const./conc. of roads w/ drainage, Brgy. narra
Flood control · 2016 · VICTORIA DEVELOPMENT AND VENTURES CORP.
₱5.8MCompleted · 100%
Repair of permanent bridges, Cag-anahao bridge (b00265sm) along catarman - calbayog road
Roads and bridges · 2016 · CTC CONSTRUCTION & SUPPLIES
₱12.8MCompleted · 100%
Repair of permanent bridges, Cabatuan bridge (b00270sm) along catarman - calbayog road
Roads and bridges · 2016 · CTC CONSTRUCTION & SUPPLIES / LEDA CONSTRUCTION INCORPORATED
₱15.3MCompleted · 100%
Construction of barangay hall and multi-purpose building: a. const. of brgy. hall, Brgy. hinatad; b. const. of multi-purpose bldg., Brgy. libjo; c. const. of brgy. hall, Brgy. old rizal, Northern samar i
Buildings · 2016 · JUPA CONSTRUCTION
₱2.9MCompleted · 100%
Construction/improvement eco-tourism road, Macagtas dam eco-park access road
Roads and bridges · 2016 · 5GG CONSTRUCTION
₱9.2MCompleted · 100%
Repair of permanent bridges, Liguid bridge (b00254sm) along catarman - calbayog road
Roads and bridges · 2016 · CTC CONSTRUCTION & SUPPLIES
₱8.1MCompleted · 100%
Repair of permanent bridge, Gibulwangan bridge (b00263sm) along catarman - calbayog road
Roads and bridges · 2016 · CTC CONSTRUCTION & SUPPLIES
₱12.8MCompleted · 100%
Repair of permanent bridges, Cag-anibong bridge (b00273sm) along catarman - calbayog road
Roads and bridges · 2016 · SOLID M CONSTRUCTION
₱6.6MCompleted · 100%
Repair of permanent bridge, Cagkinay bridge (b00256sm) along catarman - calbayog road
Roads and bridges · 2016 · CTC CONSTRUCTION & SUPPLIES
₱13.6MCompleted · 100%
Repair of permanent bridges, Taguibian bridge (b00536sm) along catarman - laoang road
Roads and bridges · 2016 · CTC CONSTRUCTION & SUPPLIES
₱7.2MCompleted · 100%
Repair of permanent bridges, Lobog bridge (b00257sm) along catarman - calbayog road
Roads and bridges · 2016 · CTC CONSTRUCTION & SUPPLIES
₱10.9MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
EFC DEVELOPMENT CORPORATION34 projects · ₱449.7M
2
JEJA AND SOLO ENTERPRISES AND DEVELOPMENT CORPORATION20 projects · ₱358.4M
3
RNMK CONSTRUCTION, SUPPLY AND DEVELOPMENT CORP.17 projects · ₱569.6M
4
VCD CONSTRUCTION AND SUPPLY14 projects · ₱148.4M
5
KANRAUL DESIGN AND BUILD PLUS MATERIALS10 projects · ₱140.1M