National projects
1952projects
₱45.02Bin all
273ongoing
33slow
- Roads and bridges ₱32.49B
- Flood control ₱6.45B
- Buildings ₱3.33B
- Schools ₱1.67B
- Water ₱793.6M
- Other ₱286.7M
Showing 391 to 420 of 1,952
Construction/rehab of water supply/septage & sewerage/ rainwater collector system (rwcs), Denr-cenro, Pambujan; hibubullao cs, Catubig; hibubullao nhs, Catubig; lenoy-ahan es, Catubig; nabulo es, Catubig; osmeña es catubig; catoto-ogan es, Las navas; dol.
Water · Pambujan · 2023 · CDU CONSTRUCTION
₱2.3MCompleted · 100%
Construction of solar water system
Water · Rosario · 2023 · SMU CONSTRUCTION AND SUPPLY
₱9.8MOn-Going · 100%
Construction of multipurpose building (academic building), University of eastern philippines lavezares satellite campus
Buildings · Lavezares · 2023 · SAL CONSTRUCTION / VCD CONSTRUCTION AND SUPPLY
₱49.0MOn-Going · 73%
Rehabilitation of evacuation center, Barangay poblacion
Buildings · Lope De Vega · 2023 · SAL CONSTRUCTION
₱9.9MCompleted · 100%
Construction of solar water system
Water · Lavezares · 2023 · RNMK CONSTRUCTION, SUPPLY AND DEVELOPMENT CORP.
₱29.4MOn-Going · 100%
Construction of multi-purpose facility, Brgy. barobaybay
Buildings · Lavezares · 2023 · CALIFORNIAROCK CONSTRUCTION
₱9.9MCompleted · 100%
Construction of two (2) storey batallion administration building, H546ecb, 53ebde, Pa, Kuta kankabato, Tacloban city
Buildings · San Jose · 2023 · KANRAUL DESIGN AND BUILD PLUS MATERIALS
₱15.6MOn-Going · 36%Slow
Construction of solar water system
Water · Bobon · 2023 · CALIFORNIAROCK CONSTRUCTION
₱9.8MOn-Going · 35%Slow
Construction of solar water system, Municipality of bobon
Water · Bobon · 2023 · CALIFORNIAROCK CONSTRUCTION
₱9.8MOn-Going · 100%
Construction of solar water system
Water · San Jose · 2023 · CALIFORNIAROCK CONSTRUCTION
₱9.8MCompleted · 100%
Construction of solar water system
Water · San Isidro · 2023 · CALIFORNIAROCK CONSTRUCTION
₱9.8MCompleted · 100%
Construction of multi-purpose building, Government center
Buildings · Catarman · 2023 · CHRISTFER CONSTRUCTION & SUPPLY
₱34.3MOn-Going · 76%
Construction of 1sty3cl, Oson es
Buildings · Capul · 2023 · CHRISTFER CONSTRUCTION & SUPPLY
₱10.3MCompleted · 100%
Construction of 1sty2cl, Libertad es
Buildings · Lavezares · 2023 · FOUR JJ CONSTRUCTION
₱6.5MCompleted · 100%
Construction of 1sty2cl, Tarnate es
Other · San Vicente · 2023 · SMU CONSTRUCTION AND SUPPLY
₱6.8MCompleted · 100%
Construction of 1sty4cl, Polangi es
Buildings · Catarman · 2023 · EFC DEVELOPMENT CORPORATION
₱12.3MCompleted · 100%
Construction of modified deped-dpwh standard one (1) - storey, Three (3) classroom school building (no toilet attached), Mabini elementary school
Schools · Lapinig · 2023 · ESD CRUZ CONSTRUCTION & SUPPLY
₱7.0MCompleted · 100%
Construction of modified deped-dpwh standard one (1) - storey, Five (5) classroom school building (no toilet attached), Laoang national high school
Schools · Laoang · 2023 · ESD CRUZ CONSTRUCTION & SUPPLY
₱13.0MCompleted · 100%
Construction of modified deped-dpwh standard one (1) - storey, Four (4) classroom school building (no toilet attached), Oleras national high school
Schools · Laoang · 2023 · EFC DEVELOPMENT CORPORATION
₱10.0MCompleted · 100%
Construction of 1sty4cl, Cawayan integrated school
Schools · Catarman · 2023 · EFC DEVELOPMENT CORPORATION
₱12.3MCompleted · 100%
Construction of modified deped-dpwh standard one (1) - storey, Four (4) classroom school building (no toilet attached), Mapanas agro-industrial high school
Schools · Mapanas · 2023 · ESD CRUZ CONSTRUCTION & SUPPLY
₱10.0MCompleted · 100%
Contruction of modified deped-dpwh standard one (1) storey two (2) classroom school building (no toilet attached), Malobago-pagsang-an national high school, N. samar
Schools · San Roque · 2023 · EFC DEVELOPMENT CORPORATION
₱5.0MCompleted · 100%
Construction of modified deped-dpwh standard one (1) - storey, Four (4) classroom school building (no toilet attached), Bukid national high school
Schools · Las Navas · 2023 · EFC DEVELOPMENT CORPORATION
₱10.0MCompleted · 100%
Construction of 1sty3cl, Rosario lim uy national high school
Schools · Catarman · 2023 · JEJA AND SOLO ENTERPRISES AND DEVELOPMENT CORPORATION
₱9.6MCompleted · 100%
Construction of modified deped-dpwh standard one (1) - storey, Four (4) classroom school building (no toilet attached), La perla national high school
Schools · Laoang · 2023 · EFC DEVELOPMENT CORPORATION
₱10.0MCompleted · 100%
Construction of 1sty2cl, Washington es
Buildings · Catarman · 2023 · EFC DEVELOPMENT CORPORATION
₱6.3MCompleted · 100%
Construction of 1sty4cl, Ruperto s. sampayan national high school
Schools · San Isidro · 2023 · FOUR JJ CONSTRUCTION
₱13.1MOn-Going · 100%
Construction of solar water system
Water · Mondragon · 2023 · SMU CONSTRUCTION AND SUPPLY
₱9.8MOn-Going · 5%Slow
Construction of 1sty3cl, Londres es
Buildings · Allen · 2023 · SMU CONSTRUCTION AND SUPPLY
₱9.4MOn-Going · 83%
Construction of 1sty4cl, Barobaybay es
Buildings · Lavezares · 2023 · FOUR JJ CONSTRUCTION
₱12.4MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
CDU CONSTRUCTION190 projects · ₱4.35B
2
CHRISTFER CONSTRUCTION & SUPPLY96 projects · ₱1.03B
3
RNMK CONSTRUCTION, SUPPLY AND DEVELOPMENT CORP.85 projects · ₱2.77B
4
EFC DEVELOPMENT CORPORATION83 projects · ₱1.14B
5
JUPA CONSTRUCTION67 projects · ₱2.10B