Official seal of Northern Samar

Northern Samar: Government

Province in Eastern Visayas, Visayas · 24 towns and cities

National projects

Built by DPWH in Northern Samar since 2016.

1952projects
₱45.02Bin all
273ongoing
33slow
  • Roads and bridges ₱32.49B
  • Flood control ₱6.45B
  • Buildings ₱3.33B
  • Schools ₱1.67B
  • Water ₱793.6M
  • Other ₱286.7M

Showing 91 to 120 of 273

₱2.7MOn-Going · 100%
Construction of municipal police station in poblacion 1, Silvino lubos Other · Silvino Lobos · 2025 · RL TUBA CIVIL ENGINEERING CONSTRUCTION
₱10.4MOn-Going · 100%
Construction of bridge, Brgy. ginulgan Roads and bridges · Pambujan · 2025 · DEACONS TEMPLE CONSTRUCTION & SUPPLY
₱14.8MOn-Going · 97%
₱96.4MOn-Going · 47%
Accces road leading to pinipisakan falls Roads and bridges · Las Navas · 2025 · NORSAM BUILDERS & CONSTRUCTION SUPPLY
₱39.2MOn-Going · 100%
₱30.9MOn-Going · 89%
₱29.3MOn-Going · 93%
Concreting of brgy. san miguel to mawo river fmr Flood control · Victoria · 2024 · RNMK CONSTRUCTION, SUPPLY AND DEVELOPMENT CORP.
₱18.9MOn-Going · 100%
Construction of catubig flood control structure and drainage system, Catubig river basin Flood control · Catubig · 2025 · MIK AND MEL CONSTRUCTION AND SUPPLY
₱48.9MOn-Going · 98%
Constructioin of flood control structure and drainage system, Pambujan river basin, Silvino lubos Flood control · Silvino Lobos · 2025 · ESD CRUZ CONSTRUCTION & SUPPLY
₱96.5MOn-Going · 95%
Construction of road, Gandara - matuguinao - las navas road (northern samar side) Roads and bridges · Las Navas · 2025 · JUPA CONSTRUCTION
₱78.1MOn-Going · 1%
₱55.4MOn-Going · 2%
Concreting of brgy. buenasuerte of sitio cag-olango fmr Roads and bridges · Victoria · 2024 · SMU CONSTRUCTION AND SUPPLY
₱23.9MOn-Going · 56%
Construction of riverbank protection, Catarman-bobon irrigation project, Barangay tura Flood control · Bobon · 2024 · RNMK CONSTRUCTION, SUPPLY AND DEVELOPMENT CORP.
₱96.5MOn-Going · 100%
Concreting of brgy. cag-abaca to brgy. san julian fmr, Brgy. cag-abaca and brgy. san julian Roads and bridges · Catarman · 2024 · JT BUILDERS & CONSTRUCTION SUPPLY
₱19.9MOn-Going · 75%
₱4.9MOn-Going · 87%
₱161.3MOn-Going · 96%
₱57.9MOn-Going · 86%
Preventive maintenance - primary roads - maharlika highway (sn isidro - sn juanico br) - k0685+941 - k0687+211, Northern samar 1st ld Roads and bridges · San Isidro · 2025 · NFH CONSTRUCTION & SUPPLY / VCD CONSTRUCTION AND SUPPLY
₱99.3MOn-Going · 99%
Widening of permanent bridges - mawo parallel br. (b00599sm) along maharlika highway (sn isidro - sn juanico br.) (phase ii) Roads and bridges · Victoria · 2025 · B. VICENCIO BUILDERS (BVB), INC. / SCKC CONSTRUCTION
₱159.2MOn-Going · 47%
₱49.0MOn-Going · 92%
Replacement of permanent weak bridges - palanit br. (b00237sm) along maharlika highway (sn isidro - sn juanico br) Roads and bridges · San Isidro · 2025 · NFH CONSTRUCTION & SUPPLY / VCD CONSTRUCTION AND SUPPLY
₱179.9MOn-Going · 26%
Construction of road with drainage structure, Sitio tamburusan, Barangay daganas Roads and bridges · Catarman · 2025 · KANRAUL DESIGN AND BUILD PLUS MATERIALS
₱14.8MOn-Going · 81%
Construction of bridge, Barangay aguinaldo Roads and bridges · Catarman · 2025 · SMU CONSTRUCTION AND SUPPLY
₱14.7MOn-Going · 64%
Construction of multi-purpose building, Barangay north Buildings · San Jose · 2025 · EFC DEVELOPMENT CORPORATION
₱4.9MOn-Going · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Northern Samar since 2016.

1
CDU CONSTRUCTION190 projects · ₱4.35B
2
CHRISTFER CONSTRUCTION & SUPPLY96 projects · ₱1.03B
3
RNMK CONSTRUCTION, SUPPLY AND DEVELOPMENT CORP.85 projects · ₱2.77B
4
EFC DEVELOPMENT CORPORATION83 projects · ₱1.14B
5
JUPA CONSTRUCTION67 projects · ₱2.10B

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →