Official seal of Northern Samar

Northern Samar: Government

Province in Eastern Visayas, Visayas · 24 towns and cities

National projects

Built by DPWH in Northern Samar since 2016.

1952projects
₱45.02Bin all
273ongoing
33slow
  • Roads and bridges ₱32.49B
  • Flood control ₱6.45B
  • Buildings ₱3.33B
  • Schools ₱1.67B
  • Water ₱793.6M
  • Other ₱286.7M

Showing 1291 to 1320 of 1,952

Construction of road at brgy. poblacion Roads and bridges · Lope De Vega · 2019 · NORSAM BUILDERS & CONSTRUCTION SUPPLY
₱1.6MOn-Going · 92%
Construction of water supply level ii, Brgy. caglanipao, N. samar Water · San Isidro · 2019 · NOAH CONSTRUCTION AND SUPPLY
₱2.0MCompleted · 100%
Construction of barangay road, Brgy. flormina to brgy. san isidro Roads and bridges · Mondragon · 2019 · IDAP CONSTRUCTION & SUPPLY
₱4.9MCompleted · 100%
Construction of drainage canal, Brgy. kinabranan zone ii, N. samar Flood control · Allen · 2019 · MCU CONSTRUCTION
₱2.0MCompleted · 100%
Repair/improvement of multipurpose building, Barangay p. tingzon, N. samar Buildings · San Jose · 2019 · CHRISTFER CONSTRUCTION & SUPPLY
₱990KCompleted · 100%
Construction of roads, Brgy. luisita, N. samar Roads and bridges · Victoria · 2019 · S&D CONSTRUCTION AND SUPPLY
₱2.0MCompleted · 100%
Const. of foot bridge and pathway, Brgy. chansvilla, N. samar Roads and bridges · Lavezares · 2019 · CHRISTFER CONSTRUCTION & SUPPLY
₱2.0MCompleted · 100%
Construction of flood control along caaguit-itan river, Brgy. alegria Flood control · San Isidro · 2019 · S&D CONSTRUCTION AND SUPPLY
₱2.0MCompleted · 100%
Concreting of road, Barangay 4 (poblacion) Roads and bridges · Capul · 2019 · MCU CONSTRUCTION
₱2.0MCompleted · 100%
Repair/improvement of multipurpose building, Barangay erenas, N. samar Buildings · Victoria · 2019 · VCD CONSTRUCTION AND SUPPLY
₱998KCompleted · 100%
Construction of road, Brgy. makiwalo mondragon Roads and bridges · Catarman · 2019 · CHRISTFER CONSTRUCTION & SUPPLY
₱2.0MOn-Going · 21%Slow
Construction of flood control, Brgy. 5 (poblacion) Flood control · Capul · 2019 · MCU CONSTRUCTION
₱2.0MCompleted · 100%
Construction of flood control, Brgy. veriato Flood control · San Isidro · 2019 · S&D CONSTRUCTION AND SUPPLY
₱2.0MCompleted · 100%
Const. of road, Brgy. sabang zone ii, N. samar Roads and bridges · Allen · 2019 · S&D CONSTRUCTION AND SUPPLY
₱2.0MCompleted · 100%
Repair/improvement of multipurpose building, Barangay tinowaran, N. samar Buildings · Catarman · 2019 · VCD CONSTRUCTION AND SUPPLY
₱998KCompleted · 100%
Concreting of road, Brgy. buenasuerte, N. samar Roads and bridges · Victoria · 2019 · MCU CONSTRUCTION
₱2.0MCompleted · 100%
Repair/improvement of multipurpose building, Barangay buenos aires, N. samar Buildings · Victoria · 2019 · S&D CONSTRUCTION AND SUPPLY
₱996KCompleted · 100%
Repair/rehabilitation/concreting of road, Brgy. poblacion Roads and bridges · Las Navas · 2019 · CHRISTFER CONSTRUCTION & SUPPLY
₱14.1MCompleted · 100%
Construction of mbp, Barangay buenos aires, N. samar Other · Victoria · 2019 · MIK AND MEL CONSTRUCTION AND SUPPLY
₱7.6MOn-Going · 81%
Construction of flood control structure at brgy. 89, Tacloban city Flood control · San Jose · 2019 · EZJONES CONSTRUCTION INC. / MWJ CONSTRUCTION
₱70.8MCompleted · 100%
Repair/improvement of multipurpose building, Barangay magsaysay, N. samar Buildings · Bobon · 2019 · JCAD ENGINEERING AND SUPPLY
₱996KCompleted · 100%
Repair/improvement of multipurpose building, Barangay guba Buildings · Catarman · 2019 · ARCASON BUILDERS AND CONSTRUCTION SUPPLY
₱997KCompleted · 100%
Repair/improvement of multipurpose building, Barangay mirador, N. samar Buildings · Mondragon · 2019 · JCAD ENGINEERING AND SUPPLY
₱979KCompleted · 100%
₱2.0MCompleted · 100%
₱2.0MCompleted · 100%
Construction of drainage canal, Brgy. looc, N. samar Flood control · Allen · 2019 · MULTI-LINE CONSTRUCTION AND SUPPLY
₱2.0MCompleted · 100%
₱15.6MCompleted · 100%
Construction of road, Camp juan ponce sumoroy, Brgy. dalakit, N. samar Roads and bridges · Catarman · 2019 · MCU CONSTRUCTION
₱2.9MCompleted · 100%
Construction of road, Brgy. cabacungan, N. samar Roads and bridges · Allen · 2019 · JCAD ENGINEERING AND SUPPLY
₱3.9MCompleted · 100%
Construction of multi-purpose building, Brgy. guilaoangi Buildings · Laoang · 2019 · J.D. PARTUZA CONSTRUCTION
₱4.9MCompleted · 100%

Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.

The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.

Who builds here

Contractors with the most projects in Northern Samar since 2016.

1
CDU CONSTRUCTION190 projects · ₱4.35B
2
CHRISTFER CONSTRUCTION & SUPPLY96 projects · ₱1.03B
3
RNMK CONSTRUCTION, SUPPLY AND DEVELOPMENT CORP.85 projects · ₱2.77B
4
EFC DEVELOPMENT CORPORATION83 projects · ₱1.14B
5
JUPA CONSTRUCTION67 projects · ₱2.10B

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board, or report it to DPWH on the project's own page.

Post on Talk →