National projects
1952projects
₱45.02Bin all
273ongoing
33slow
- Roads and bridges ₱32.49B
- Flood control ₱6.45B
- Buildings ₱3.33B
- Schools ₱1.67B
- Water ₱793.6M
- Other ₱286.7M
Showing 1471 to 1500 of 1,589
Construction of rain water collector system (rwcs) in talisay city, Cebu: 1. san isidro elementary school, San isidro, Talisay city, 2. san roque elementary school, Talisay city, 3. laray elementary school, Talisay city
Schools · San Roque · 2016 · JANUARY BUILDERS
₱811KCompleted · 100%
Construction/rehab. of catarman river control structures (catarman river basin)
Flood control · Catarman · 2016 · RHYES BUILDERS & SUPPLY
₱11.0MCompleted · 100%
Repair/improvement of rawis multi-purpose building, Brgy. rawis, Northern samar ii
Buildings · Laoang · 2016 · J.D. PARTUZA CONSTRUCTION
₱1.9MCompleted · 100%
Const./concreting of roads: 1. const./conc. of mirador road, Mondragon; 2. const./conc. of road, Brgy. nenita, Mondragon; 3. const./conc. of san juan road
Roads and bridges · Mondragon · 2016 · VCD CONSTRUCTION AND SUPPLY
₱5.9MCompleted · 100%
Const./concreting of roads: 1. const./conc. of imelda road, Mondragon; 2. const./conc. of makiwalo road, Mondragon; 3. const./conc. of doña lucia road
Roads and bridges · Mondragon · 2016 · C. A. CONSTRUCTION AND SUPPLY
₱5.9MCompleted · 100%
Construction/concreting of brgy. arellano road
Roads and bridges · Bobon · 2016 · UBAS CONSTRUCTION
₱2.0MCompleted · 100%
Construction of water supply level ii, Brgy. frederick
Water · Allen · 2016 · C. A. CONSTRUCTION AND SUPPLY
₱2.0MCompleted · 100%
Const./repair/rehab./imprvt. of various infrastructure including local projects (pamana), Const. of bugay-guiguinta-bugtusan-mabini-taylor-victory-el empon-poponton-cuenco road, Northern samar 2nd ld
Roads and bridges · Las Navas · 2016 · D.L CERVANTES CONSTRUCTION CORPORATION
₱192.0MCompleted · 100%
Replacement of permanent weak bridges, Veriato bridges (b00239sm) along daang maharlika (sm) (san isidro - san juanico bridge)
Roads and bridges · San Isidro · 2016 · MAC BUILDERS CORP.
₱38.4MCompleted · 100%
Upgrading of damaged paved nat'l. roads including drainage based on pavement management system/highway dev't. and management-4 (hdm-4), Bugko-nenita-mirador-cagpanit-an-..., N. samar 1st district
Roads and bridges · Mondragon · 2016 · EZJONES CONSTRUCTION INC.
₱72.4MCompleted · 100%
Const./repair/rehab./imprvt. of various infrastructure including local projects, Const. of lope de vega - silvino lobos road (phase 4), 1st district
Roads and bridges · Lope De Vega · 2016 · ARKY CONSTRUCTION AND SUPPLY
₱94.0MCompleted · 100%
Rehabilitation/major repair of permanent bridges (5 bridges) within northern samar
Roads and bridges · San Isidro · 2016 · CTC CONSTRUCTION & SUPPLIES / LEDA CONSTRUCTION INCORPORATED
₱76.2MCompleted · 100%
Reconstruction of 280mm with drainage along daang maharlika (sm) (san isidro - san juanico bridge), K0679+(-056) - k0680+142, K0683+500 - k0684+990, Section id: s00002sm
Roads and bridges · San Isidro · 2016 · NORSAM BUILDERS & CONSTRUCTION SUPPLY
₱69.6MCompleted · 100%
Upgrading of damaged paved, Nat'l. roads including drainage based on pavement management system/highway dev't. & management-4 (hdm-4) daang maharlika (sm)..., N. samar
Roads and bridges · San Isidro · 2016 · THE TUSCAN STRUCTURES & SUPPLIES
₱27.4MCompleted · 100%
Construction/concreting of san antonio
Roads and bridges · Mondragon · 2016 · UBAS CONSTRUCTION
₱1.7MCompleted · 100%
Construction of barangay hall: a. const. of brgy. hall, Brgy. kinabranan i; b. const. of brgy. hall, Brgy. sabang i; c. const. of brgy. hall, Brgy. lagundi, N. samar i
Buildings · Allen · 2016 · VICTORIA DEVELOPMENT AND VENTURES CORP.
₱2.9MCompleted · 100%
Construction of 1 storey 2 classroom school building, Barangay bagasbas
Schools · Mondragon · 2016 · UBAS CONSTRUCTION
₱2.0MCompleted · 100%
Construction of nenita river control along catarman - laong road
Flood control · Catarman · 2016 · NORSAM BUILDERS & CONSTRUCTION SUPPLY
₱8.8MCompleted · 100%
Construction of barangay hall, Brgy. daganas
Buildings · Catarman · 2016 · UBAS CONSTRUCTION
₱967KCompleted · 100%
Construction of water supply level ii, Brgy. mabini
Water · Catarman · 2016 · UBAS CONSTRUCTION
₱1.9MCompleted · 100%
Construction/concreting of junction highway - barayong
Roads and bridges · San Isidro · 2016 · CHRIS AND JAMES CONSTRUCTION
₱8.1MCompleted · 100%
Construction of revetment on concrete sheet piles (river control), Brgy. trangue
Flood control · Catarman · 2016 · UBAS CONSTRUCTION
₱2.0MCompleted · 100%
Construction/concreting of san miguel - san jose - salvacion
Roads and bridges · Lavezares · 2016 · JUPA CONSTRUCTION
₱6.6MCompleted · 100%
Construction of barangay hall: a. const. of brgy. hall, Brgy. salvacion, San isidro; b. const. of brgy. hall, Brgy. calarayan, Allen; c. const. of brgy. hall, Brgy. kinaguitman, Northern samar i
Buildings · Allen · 2016 · VICTORIA DEVELOPMENT AND VENTURES CORP.
₱2.9MCompleted · 100%
Rehabilitation/concreting of poblacion allen - cabacungan road, Ko705+562 - ko707+000
Roads and bridges · Allen · 2016 · JUPA CONSTRUCTION
₱9.2MCompleted · 100%
Construction/concreting of poblacion (ward 3) to san antonio circumferential road
Roads and bridges · San Antonio · 2016 · THE TUSCAN STRUCTURES & SUPPLIES
₱13.6MCompleted · 100%
Construction of mondragon-silvino lobos road (phase 6)
Roads and bridges · Mondragon · 2016 · UBAS CONSTRUCTION
₱4.7MCompleted · 100%
Construction of multipurpose building, Barangay sangputan, N. samar
Buildings · San Vicente · 2016 · 5GG CONSTRUCTION
₱3.9MCompleted · 100%
Const./imprvt. of access roads leading to declared tourism destintions eco-tourism roads, Const. of capul circumferential road, Aguin-landusan-sawang-sagaosawan-jubang-oson-pob. sect., Sta. 3+840.00 - sta. 8+840.00
Roads and bridges · Capul · 2016 · 5GG CONSTRUCTION / WERR CORPORATION INTERNATIONAL
₱138.1MCompleted · 100%
Construction / concreting of lagbangan lake circumferential road, Sta. 1+120 - sta. 4+603.08
Roads and bridges · San Antonio · 2016 · CTC CONSTRUCTION & SUPPLIES / HENSCHA PHILS. INC.
₱58.4MCompleted · 100%
Source: DPWH Transparency Portal. Each project links to its page there, with the contract and the bidders.
The red "Slow" tag is a plain fact, not a charge: the project started more than two years ago and is under 60% done. We say what DPWH reports and link to it.
Who builds here
1
CDU CONSTRUCTION190 projects · ₱4.35B
2
CHRISTFER CONSTRUCTION & SUPPLY96 projects · ₱1.03B
3
RNMK CONSTRUCTION, SUPPLY AND DEVELOPMENT CORP.85 projects · ₱2.77B
4
EFC DEVELOPMENT CORPORATION83 projects · ₱1.14B
5
JUPA CONSTRUCTION67 projects · ₱2.10B