Rosario: Government

Municipality in Northern Samar, Eastern Visayas, Visayas · 11 barangays

Town hall contracts

Construction contracts the town hall of Rosario awarded and posted on PhilGEPS.

13projects
₱79.9Min all
  • Roads and bridges ₱55.4M
  • Flood control ₱9.6M
  • Water ₱9.0M
  • Buildings ₱3.8M
  • Other ₱2.1M

The last construction award Rosario posted on PhilGEPS is from March 2019. A town has to post every award, so the list below is likely not all of its work. The town's own reports are in "Town hall papers".

All
Construction of irrigation canal Flood control · 2019 · NRP CONSTRUCTION AND SUPPLY
₱1.8M
Improvement of mini-pier Other · 2019 · NRP CONSTRUCTION AND SUPPLY
₱149K
Improvement of street along municipal public market Roads and bridges · 2019 · NRP CONSTRUCTION AND SUPPLY
₱199K
Concreting of brgy. salhag – kailingan farm-to-market road Roads and bridges · 2019 · THE TUSCAN STRUCTURES AND SUPPLIES
₱49.9M
Improvement of parks and plazas landscaping and fencing (phase ii) Other · 2018 · MULTI-LINE CONSTRUCTION AND SUPPLY
₱998K
Improvement of municipal building Buildings · 2018 · JT BUILDERS & CONSTRUCTION SUPPLY
₱1.5M
Construction (construction of triple box culvert), Brgy. 1 commonwealth-brgy. 2 poblacion Flood control · 2018 · EZJONES CONSTRUCTION, INC.
₱7.8M
Core local access road, Real sreet, Brgy. 2 poblacion Roads and bridges · 2018 · EZJONES CONSTRUCTION, INC.
₱2.4M
Core local access road, Brgy.1-commonwealth Roads and bridges · 2018 · EZJONES CONSTRUCTION, INC.
₱2.9M
Provision of potable water system Water · 2018 · JUPA CONSTRUCTION
₱9.0M
Construction of material recovery facility (mrf) building Buildings · 2018 · JUPA CONSTRUCTION
₱339K
Improvement of parks and plazas-landscaping and fencing (phase 1) Other · 2018 · RNA CONSTRUCTION AND SUPPLY
₱999K
Improvement/repair/rehabilitation of multi-puprose building Buildings · 2018 · RNA CONSTRUCTION AND SUPPLY
₱1.9M

Source: PhilGEPS award notices, from the BetterGov.ph open data (CC0).

Town hall papers

Not every project is on PhilGEPS. These are the town's own reports.

1
Budget and 20% development fundDILG Full Disclosure Policy portal
2
Audit reportsCommission on Audit

See something wrong?

A project that looks finished on paper but not on the ground, or work that stopped. Post a photo on the Talk board.

Post on Talk →